№ files_lp_4_process_2_61959
File format: docx
Character count: 53376
File size: 142 KB
This document provides a summary of the contributions related to the coexistence evaluation and conclusions of A-IoT for outdoor use, focusing on different proposals and observations made by multiple companies during the 3GPP TSG-RAN WG4 meeting.
Year:
2026
Region / City:
Gothenburg, Sweden
Theme:
A-IoT, coexistence evaluation
Document type:
Meeting contribution
Organization / Institution:
3GPP TSG-RAN WG4
Author:
Moderator (LGE)
Target audience:
3GPP members, stakeholders in A-IoT development
Period of validity:
February 09-13, 2026
Date of approval:
February 09, 2026
Date of modification:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / city:
Goteborg, Sweden
Topic:
Telecommunication standards, IoT
Document type:
Change Request
Organization:
3GPP
Author:
Xiaomi, Huawei, CATT, Samsung, CMCC, ZTE
Target audience:
Industry professionals, 3GPP working groups
Validity period:
February 2026
Approval date:
2026-02-11
Modification date:
Not specified
Release:
Rel-19
Work item code:
Ambient_IoT_Solutions-Core
Impact assessment:
Isolated impact with the previous version of the specification
Clauses affected:
8.20.3.3, 9.3.1.2, 9.4.5
Year:
2026
Location:
Gothenburg, Sweden
Subject:
Ambient IoT security parameter update
Document type:
Change Request
Organization:
3GPP TSG-RAN WG3
Authors:
Huawei, China Telecom, China Unicom, CATT, CMCC, Nokia, Samsung, ZTE, LG Electronics, NEC
Work item code:
Ambient_IoT_Solutions-Core
Release:
Rel-19
Category:
F (correction)
Date of submission:
2026-02-11
Clauses affected:
2, 8.20.1.2, 9.3.6.1, 9.4.5, 9.4.7
Impact:
Adds missing security parameter without affecting previous version functionality
Consequences if not approved:
NG-RAN cannot receive security parameter from CN for AIoT
Year:
2026
Region / City:
Gothenburg, SE
Topic:
A-IoT, NR, Maintenance
Document Type:
Meeting Contribution
Organization / Institution:
3GPP
Author:
Moderator (CMCC)
Target Audience:
Technical experts, engineers, contributors
Period of validity:
Feb. 9th ~ 13th, 2026
Date of Approval:
N/A
Date of Amendments:
N/A
Note:
Context description
Year:
2026
Location:
Gothenburg, Sweden
Subject:
Telecommunications / 3GPP Standardization
Document Type:
Change Request
Organization:
3GPP TSG-RAN WG3
Authors:
Huawei, China Telecom, China Unicom, CATT, CMCC, Nokia, Samsung, ZTE, LG Electronics
Work Item Code:
Ambient_IoT_Solutions-Core
Release:
Rel-19
Category:
F (correction)
Date Submitted:
2026-01-30
Meeting:
TSG-RAN WG3 #131
Clauses Affected:
2, 8.20.1.2, 9.3.3.xx (new), 9.3.6.1, 9.4.5, 9.4.7
Impact:
Isolated change to add missing security parameter in Inventory Request procedure
Year:
2026
Region / City:
Gothenburg, Sweden
Topic:
A-IoT Security Information
Document Type:
Change Request
Organization / Institution:
Huawei, China Telecom, China Unicom, CATT, CMCC, Nokia, Samsung, ZTE, LG Electronics, NEC
Author:
R3
Target Audience:
Technical working groups
Period of Validity:
Rel-19
Approval Date:
2026-02-13
Change Date:
2026-02-13
Release Version:
Rel-19
Category:
F
Impact:
Isolated impact with the previous version of the specification
Reason for Change:
Need to introduce A-IoT security information in Inventory
Clauses Affected:
2, 9.3.3.xx (new), 9.3.6.1, 9.4.5, 9.4.7
Test Specifications Affected:
Yes
Other Core Specifications Affected:
Yes
Other Comments:
Revision history updated
Context:
A technical specification document detailing changes for security information inclusion in the A-IoT inventory request transfer protocol
Year:
2026
Location:
Gothenburg, Sweden
Organization:
3GPP TSG-RAN4
Document type:
Meeting report / Technical summary
Topic:
Ambient IoT (A-IoT) Maintenance and RF Requirements
Contributors:
vivo, Ericsson, Huawei, HiSilicon, CATT, ZTE Corporation, Sanechips
Agenda item:
4.1.3, 4.20.1
Target audience:
Telecommunications engineers, 3GPP members
Related standards:
TS 38.191, TS 38.192, TS 38.194, TS 38.104, TS 38.195
Document ID:
R4-2602100
Meeting number:
118
Date:
February 9–13, 2026
Year:
2023
Region / City:
Nevada County, CA
Subject:
Public Health, Recreation, COVID-19 Response
Document Type:
Grant Request
Organization / Institution:
Nevada County Board of Supervisors
Author:
Erika Seward
Target Audience:
Local authorities, nonprofits, businesses, and community members
Duration:
Not specified
Approval Date:
August 8, 2023
Date of Changes:
Not specified
Year:
2023
Region / City:
Minnesota
Theme:
Outdoor Recreation, Natural and Scenic Area Grants
Document Type:
Manual
Agency:
Minnesota Department of Natural Resources
Author:
Minnesota Department of Natural Resources
Target Audience:
Grantees and project sponsors
Period of Validity:
Until project completion
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Victoria, Australia
Topic:
Outdoor and Environmental Studies
Document Type:
Study Design
Organization / Institution:
Victorian Curriculum and Assessment Authority (VCAA)
Author:
Victorian Curriculum and Assessment Authority (VCAA)
Target Audience:
VCE teachers, students, educational institutions
Period of Validity:
1 January 2024 – 31 December 2028
Approval Date:
2023
Date of Changes:
Not specified
Content:
The document outlines the study design for VCE Outdoor and Environmental Studies, detailing the scope, structure, assessment methods, and objectives for students.
Year:
2020
Region / City:
Georgia
Topic:
Environmental Education, Outdoor Learning
Document Type:
Toolkit
Organization / Institution:
Environmental Education Alliance (EEA)
Author:
Environmental Education Alliance (EEA)
Target Audience:
Environmental educators, K-12 school teachers, school district administrators, outdoor learning specialists
Period of Action:
2020
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
Global
Subject:
Pre-Insulated Outdoor HVAC Ductwork System
Document Type:
Engineering Specification
Organization:
AQC Industries
Author:
Not specified
Target Audience:
Engineers, Contractors, HVAC professionals
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Year
Topic:
Risk assessment and management, Safety checklist
Document Type:
Checklist
Target Audience:
Educators, Caregivers
Year:
2020
Region / City:
Chelsea and Holyoke, Massachusetts
Topic:
COVID-19 visitation guidelines
Document type:
Policy guidelines
Effective period:
March 2020 – until further notice
Approval date:
March 23, 2020
Modification date:
Not specified
Year:
2024
City:
Lowell, Massachusetts
Project name:
Outdoor Granite Stairs Resetting and Repairs at the LMA
Facility:
Lowell Memorial Auditorium
Document type:
Public procurement bid and contract documentation
Issuing authority:
City of Lowell
Municipal office:
City Manager
City manager:
Thomas A. Golden, Jr.
Procurement authority:
Chief Procurement Officer
Bid opening date:
February 14, 2024
Pre-bid site inspection date:
February 6, 2024
Bid submission method:
Sealed bids
Applicable wage standards:
State Prevailing Wage Rates and Federal Davis-Bacon Rates
Required certifications:
DCAMM certification (Masonry)
Bond requirements:
5% bid security; 100% payment bond; 100% performance bond
Award method:
Lowest qualified bidder
Target bidders:
Qualified construction contractors
Context:
Municipal procurement documentation governing the solicitation, submission, evaluation, and contractual conditions for construction work involving granite stair resetting and repairs at a public auditorium.
Year:
[Insert Year]
Region / City:
[Insert Region/City]
Topic:
Emergency preparedness, response, and recovery for outdoor events
Document Type:
Exercise Manual
Organization:
Cybersecurity and Infrastructure Security Agency (CISA)
Author:
[Insert Author]
Target Audience:
Exercise participants (planners, facilitators, evaluators, and players)
Period of Validity:
[Insert Start and End Dates of Exercise]
Approval Date:
[Insert Date]
Amendment Date:
[Insert Date]
Note:
Year
Region / City:
Victoria
Theme:
Agriculture / Poultry Farming
Document Type:
Planning Permit Template
Agency / Institution:
Agriculture Victoria
Target Audience:
Poultry farm operators in Victoria
Year:
2023
Region / City:
USA
Topic:
HVAC Systems
Document Type:
Technical Specification
Organization / Institution:
LG
Author:
LG
Target Audience:
Engineers, Contractors, HVAC Designers
Effective Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified