№ files_lp_4_process_2_61939
Technical change request submitted to 3GPP RAN2 describing a correction to 5G NR UE capability signaling to clarify the relationship between Rel-19 MPR enhancement with extended bandwidth configurations and Rel-18 power boosting requirements.
Specification: 3GPP TS 38.306
Document type: Change Request
Change request ID: R2-2601175
Version of specification: 19.1.0
Release: Rel-19
Category: F (correction)
Working group: 3GPP TSG-RAN WG2
Meeting: 3GPP TSG-RAN WG2 Meeting #133
Meeting location: Gothenburg, Sweden
Meeting dates: 9–13 February 2026
Source organization: Apple
Source to TSG: R2
Work item code: NR_ENDC_RF_Ph4-Core
Date: 10 February 2026
Affected clauses: 4.2.7.7
Impacted architecture option: NR SA
Impacted functionality: MPR enhancement, power boosting
Related specifications: 3GPP TS 38.331, TS 38.101-1
Subject: UE capability signaling related to Rel-19 MPR extension and Rel-18 power boosting behavior
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.