№ files_lp_4_process_3_090973
File format: docx
Character count: 5939
File size: 30 KB
Guidelines for grant applicants outlining questions and requirements for submitting a complete narrative, including project description, measurable impacts, budget details, and implementation timeline.
Year:
2024
Region:
Connecticut, USA
Topic:
Climate Smart Agriculture
Document Type:
Grant Application Narrative
Organization:
CT RC&D
Audience:
Farmers applying for grants
Pages:
Maximum 10 pages
Sections:
Introduction and Overview, Project Explanation, Project Budget, Project Impact, Project Timeline
Objectives:
Mitigation of climate change effects, adoption of sustainable farming practices, measurable environmental impacts
Required Tools:
COMET-Planner, EPA Greenhouse Gas Equivalency Calculator, Soil Test Results
Deadline:
Project completion within 12 months of contract execution, final report Summer 2026
Monitoring:
Semi-annual reports and site visits by CT RC&D and CT DoAG
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Not specified
Topic:
Surface profile data specification
Document Type:
Technical specification
Organization / Institution:
Not specified
Author:
Alex Wright
Target Audience:
Stakeholders involved in surface profile surveys
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Classification:
Senior Vocational Rehabilitation Counselor, Qualified Rehabilitation Professional
Job Title:
Senior Vocational Rehabilitation Counselor, Qualified Rehabilitation Professional
Position Number:
813-250-XXXX-XXX
Reports To:
TM/Staff Services Manager
IFLSA Status:
Non-Exempt
Division:
Vocational Rehabilitation Employment Division
Location:
San Jose District / may be housed in another DOR district
Primary Assignment:
Provide Vocational Rehabilitation Services to Deaf and Hard of Hearing and Generalist Consumers
Core Duties:
Determining VR eligibility, priority for services, development and amendments of IPE, determining successful employment outcome and case closure
Communication Requirements:
American Sign Language (ASL)
Service Scope:
Federal Title I Vocational Rehabilitation Services Program
Work Mode:
Remote with occasional in-person requirements
Essential Functions:
Counseling, team coordination, eligibility determination, community outreach, ASL interpretation, documentation
Marginal Functions:
Training, participation in workgroups
Document Type:
Duty Statement / Job Description
Year:
Not specified
Region / District:
M.U.S.D.
Subject:
Mathematics
Grade Level:
Grade 2
Document Type:
Curriculum overview
Educational Program:
RCD Units of Study
Content Structure:
Instructional units with chapters, standards, and duration
Standards Referenced:
2.OA, 2.NBT, 2.MD, 2.G
Assessment Schedule:
Assessment 1 (End of Quarter 1); Assessment 2 (End of Quarter 2); Assessment 3 (End of Quarter 3); Assessment 4 (End of Quarter 4)
Number of Instructional Units:
9
Total Duration:
Year-long curriculum plan
Included Topics:
Addition and subtraction, place value, money, time, graphing, measurement, shapes
Additional Elements:
Buffer weeks labeled “Time for a ‘Paws’”
Date:
20.7.2020
Auteur:
Amar DJERRAD
Pays:
Algérie
Parti politique:
RCD (Rassemblement pour la Culture et la Démocratie)
Mouvement:
Hirak
Type de document:
Article politique
Thématique:
Politique et alliances
Public cible:
Militants politiques, observateurs de la situation politique en Algérie, membres du RCD et du mouvement Hirak
Période:
2020
Contexte:
Les tensions internes du RCD et ses liens avec les islamistes de "Rachad"
Contexte historique:
Analyse politique post-2019, après le début du Hirak
Date de publication:
20.07.2020
Site web:
http://www.les7duquebec.net
Langue:
Français
Note:
Year
Year:
2025
Organization:
South African Medical Research Council (SAMRC)
Programme:
Mid-Career Scientist Programme
Document type:
Budget form
Currency:
ZAR
Funding duration:
3 years
Maximum funding:
R1,500,000 per year
Eligible expenses:
Personnel, consumables, equipment, conferences, travel
Conditions:
Funding contingent on progress and SAMRC approval
Target audience:
Mid-career researchers in South Africa
Year:
2024
Region / city:
Malawi
Theme:
Climate Change Adaptation, Social Protection, Public Works
Document type:
Terms of Reference
Agency / organization:
Government of Malawi, World Bank, Global Risk Financing Facility (GRiF)
Author:
Government of Malawi
Target audience:
Government officials, development partners, evaluators
Period of validity:
2023-2025
Approval date:
May 25, 2022
Amendment date:
October 19, 2022
Funding sources:
World Bank, GRiF Trust Fund
Objectives:
Process evaluation, accountability, future programming
Evaluation method:
Mixed method approach, qualitative and quantitative
Date:
16 July 2025
Issue Resolution Proposal:
CRP666
Issues Log ID:
TS1637
Issue Title:
Changes to GBCS & CHTS to Support VW Relay and & CADg
Source:
SMIP
Date Raised:
22 February 2024
Status:
Draft v0_2
Documentation Reference:
GBCS v4.3, CHTS v1.6
Description:
Addressing the changes required to support Internet based WAN communications using Virtual WAN Relay functionality on the HAN in the GBCS and CHTS specs.
Proposed Implementation and Preamble:
On 12 December 2023 SMIP issued a consultation on proposals to establish arrangements whereby communications with Smart Metering Systems installed in premises with no Wide Area Network could be established via the DCC using the internet and the consumer’s broadband. On 24 October 2024 we published a consultation response reflecting the substantial support for the proposals. Upon completion of that consultation, we instructed DCC to produce an SEC Variation Test Approach Document on 24 November, which enabled DCC to formally engage in the necessary development. The solution proposed relies on the use of the consumer’s broadband and consequently requires the consent of the consumer for it to be implemented. In addition, it requires additional device functionality to be installed at the premises, this is to be provided either from a separate device or incorporated into another device such as a PPMID or CAD. That Device will be referred to as the Virtual WAN Device (VWD). DCC have accommodating the changes to WAN provision that are required to implement the proposals. This includes the provision of a Virtual Wan Provider (VWP), some modest changes to DSP but without any DUIS or schema affecting changes and the creation of a CH variant known as the Virtual WAN CH (VWCH), accommodating the Virtual WAN message relay functionality. As per the December 23 consultation, the current use case for Virtual WAN message relay is No WAN areas. The VWCH will be processing Commands that have originated from the internet, via the VWP and a VWD. Virtual WAN message relay is enabled once the VWD is present in the VWCH Device Log, the enablement at installation will be via an automatic Device Command from the VWD. Currently there are no plans for service users to enable the VWD to join with the VWCH, via a service request, hence no DUIS Schema changes are proposed, such that suppliers’ current operational systems and processes are intended to remain unaffected. A design principle for the initiative is to minimise change to deliver a VW message relay as soon as possible. As such functionality that requires significant DCC change such as new Service Requests has been deliberately avoided. For a new installation in a No WAN situation, the VWD will ‘pair’ and ‘join’ with the VWCH automatically as part of the I&C activity. Whilst there is currently no service request as such, DCC will be able to determine whether a VWD is operating in ‘VW Mode’ (i.e., connecting via the VWP rather than though the CSP WAN), or not. Whilst the method for doing this remains outside of the GBCS / CHTS, the intention is to make this information available to service users, which might be appropriate to suppliers following a CoS event. The method involved will be discussed in the Virtual WAN Interface Specification. This CRP sets out the proposed changes to both CHTS and GBCS.
Year:
2024
Region / City:
Blantyre, Malawi
Theme:
Water and Sanitation
Document Type:
Environmental and Social Management Plan
Organization / Institution:
Blantyre Water Board
Author:
Blantyre Water Board
Target Audience:
Government Officials, Public Health Authorities, Local Communities
Period of Effect:
2024-2029
Approval Date:
February 2024
Date of Amendments:
N/A
Public Notice Number:
MOLIT Public Notice No. 2026-099
Issuing Authority:
Ministry of Land, Infrastructure and Transport
Country:
Republic of Korea
Program Name:
K-City Network Global Cooperation Program
Program Type:
Smart solution demonstration grant program
Legal Basis:
Act on the Promotion of Smart City Development and Industry, Article 30
Year:
2026
Announcement Date:
January 28, 2026
Application Period:
January 28, 2026 – March 17, 2026
Application Deadline:
March 17, 2026, 5:00 p.m. KST
Implementing Agency:
Korea Agency for Infrastructure Technology Advancement
Program Secretariat:
K-City Network Secretariat
Eligible Applicants:
Korean businesses and organizations
Consortium Requirement:
Mandatory consortium with overseas partner governments
Required Documents:
Project proposal, Letter of Intent or Memorandum of Understanding
Funding Amount:
300 million to 400 million KRW per project
Number of Selected Projects:
Up to six
Target Areas:
Transportation, energy, environment, security, urban administration
Geographical Scope:
Overseas cities and countries
Evaluation Method:
Proposal review and oral presentation
Contact Email:
[email protected]
Contact Telephone:
+82-31-389-6359, +82-31-389-6409
Year:
2025
Region / City:
Not specified
Topic:
Climate change, community engagement, tree planting
Document Type:
Meeting Minutes
Organization / Institution:
Climate Smart Communities Taskforce
Author:
Not specified
Target Audience:
CSC Taskforce members, community members
Action Period:
2025
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2010
Region / city:
Global
Topic:
Software user interface, Microsoft Office 2010
Document type:
Guide
Author:
Microsoft
Target audience:
Users of Microsoft Office 2010
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2024
Region / City:
Kampala
Theme:
Procurement
Document Type:
Standard Bidding Document
Organization:
Communication for Development Foundation Uganda (CDFU)
Author:
Communication for Development Foundation Uganda
Target Audience:
Bidders
Period of Validity:
24th September, 2024
Approval Date:
4th September, 2024
Amendment Date:
N/A
Procurement Reference Number:
CDFU-PR-AAP11
Description:
A bidding document outlining the procedures, requirements, and conditions for the procurement of mobile smart phones under the open domestic bidding process in Uganda.
Note:
Year
Subject:
Smart Growth, Public Infrastructure Policy Act
Document type:
Evaluation Form
Institution:
New York State Homes and Community Renewal (HCR)
Author:
HCR Smart Growth Advisory Committee and Staff
Target audience:
Internal HCR Agencies, Project Developers
Period of validity:
N/A
Approval date:
N/A
Date of changes:
N/A
Year:
2023
Region / City:
New York
Topic:
Smart Inverters, Distributed Energy Resources (DERs), IEEE Standards
Document Type:
FAQ
Organization / Institution:
Joint Utilities of New York
Author:
Joint Utilities of New York
Target Audience:
Utility providers, manufacturers of inverters, energy professionals
Effective Period:
From January 1, 2023
Approval Date:
N/A
Modification Date:
N/A
Year:
2023
Region / city:
N/A
Topic:
Smart infusion pumps, medication infusion, safety
Document type:
Draft Safe Practice Statements
Organization / institution:
Institute for Safe Medication Practices (ISMP)
Author:
N/A
Target audience:
Healthcare providers, clinicians, medical staff
Period of validity:
N/A
Date of approval:
N/A
Date of modifications:
N/A
Context:
This document outlines safe practices for the implementation and use of smart infusion pumps in healthcare settings, with a focus on medication safety and infusion protocols.
Year:
2024
Region / City:
Online
Topic:
Electric Vehicle Charging, International Cooperation
Document Type:
Meeting Minutes
Organization / Institution:
UNECE
Author:
Secretariat of UNECE
Target Audience:
Representatives of international organizations, industry experts, government officials
Period of Validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2023
Region / city:
Great Britain
Topic:
Smart Metering, Energy
Document Type:
Technical Specification
Organization / Institution:
DLMS User Association, ZigBee Alliance
Author:
Not specified
Target audience:
Industry professionals, technical experts in energy metering
Period of validity:
Not specified
Approval Date:
November 2023
Date of amendments:
Not specified