№ files_lp_3_process_7_038489
File format: docx
Character count: 1419
File size: 53 KB
Rate schedule for sewer, irrigation, and associated fees for Avimor properties, including charges for residential, commercial, and townhome services, as well as community association and county-specific fees.
Year:
2026
Region / City:
Avimor, Boise County, Gem County
Theme:
Sewer & Irrigation Rates, Property Resales
Document Type:
Rate Schedule
Organization / Institution:
Avimor Water Reclamation Company
Author:
Avimor Water Reclamation Company
Target Audience:
Property Owners, Residents, and Commercial Customers
Period of Validity:
2026
Approval Date:
Not specified
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Road Construction, Stabilization
Document Type:
Technical Specification
Organization / Institution:
Michigan Department of Transportation
Target Audience:
Contractors, Engineers
Document type:
Application form
Form number:
SM-2E
Permit type:
Exploration reclamation permit
Jurisdiction:
Washington State
Governing statutes:
RCW 78.44; WAC 332-18
Regulating authority:
Department of Natural Resources
Subject matter:
Surface mining exploration and reclamation
Application fee:
$4,500
Required parties:
Applicant; landowner(s)
Geographic scope:
County-based permit area within described sections, townships, and ranges
Intended audience:
Surface mine operators and permit applicants
Year:
2018
Agency:
Bureau of the Fiscal Service, U.S. Department of the Treasury
Document type:
Federal information collection justification
Regulations referenced:
5 U.S.C. 301; 12 U.S.C. 391; 31 U.S.C. Chapter II, Subchapter A, Part 210
Purpose:
Reclaim post-death federal benefit payments erroneously sent to deceased beneficiaries
Forms involved:
FS Form 133, FS Form 135
Recipients:
Financial institutions handling federal benefit payments
Collection method:
Paper, secure electronic transfer, secure email
Response timeframe:
60 days from receipt of FS Form 133
Federal Register notice:
October 31, 2018, page 54807
Confidentiality:
Protected under the Privacy Act
Sensitive information:
Minimal PII only, no questions of sensitive nature
Automation:
Centralized Reclamation Application (CRA) used for electronic submission
Year:
20__
Region / City:
Oklahoma
Topic:
Land reclamation
Document type:
Application form
Agency:
DEQ (Department of Environmental Quality)
Author:
Not specified
Target audience:
Governmental entities
Effective period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Year
Topic:
Environmental Sustainability, Recycling
Document Type:
Reclamation Plan
Organization:
Armstrong World Industries, Inc.
Target Audience:
Contractors, Recyclers, Environmental Professionals
Year:
2024
Region / City:
Tønsberg, Norway
Topic:
Certification, ExCB
Document Type:
Report
Organ / Institution:
International Electrotechnical Commission (IEC)
Author:
Chris Agius
Target Audience:
IECEx Management Committee Members
Effective Period:
Until 2025
Approval Date:
2024-12-18
Amendment Date:
2024-12-18
Region:
Victoria, Australia
Topic:
Indigenous languages, cultural heritage, language revival
Document type:
Research / informational report
Institutions:
Victorian Indigenous community, local and state archives
Author:
Not specified
Target audience:
Researchers, educators, general public interested in Indigenous languages
Historical period:
Pre-colonisation to present
Sources:
Oral traditions, archival materials, linguistic recordings
Languages covered:
Kulin languages, Gunditjmara/Warrnambool, Buandig, Yorta Yorta, Dhudhuroa, Pallanganmiddang, Gunai/Kurnai
Context:
The report compiles information on the history, documentation, and ongoing reclamation efforts of Victorian Indigenous languages.
Year:
2023
Region / City:
Oklahoma
Subject:
Orphan Well Site Testing, Plugging, Remediation, and Reclamation Program
Document Type:
Contract Document
Organization:
Oklahoma Corporation Commission (OCC)
Author:
Oklahoma Corporation Commission (OCC)
Target Audience:
Contractors, Project Managers, Subcontractors, Federal and State Agencies
Period of Action:
2023–2024 (and possible renewals)
Approval Date:
Not specified
Date of Changes:
Not specified
Scope:
Management of Orphan Well Site Testing, Plugging, Remediation, and Reclamation Program
Responsibilities:
Coordination of subcontractors, compliance with IIJA, preparation of monthly reports
Technological Requirements:
Website and database development for data tracking, GIS mapping
Additional Requirements:
Physical office in Oklahoma, insurance coverage, compliance with OCC procedures
Context:
Contract document detailing responsibilities and requirements for a Project Manager overseeing the Orphan Well Site Testing, Plugging, Remediation, and Reclamation Program for OCC.
Year:
2021
Region / City:
Big Stone Gap, Virginia, USA
Document Type:
Affidavit
Governing Body:
Virginia Department of Energy, Mined Land Repurposing
Legal Reference:
4 VAC 25-130-778.13(j); 4 VAC 25-130-778.14(d); §47.1-15(3) Code of Virginia
Company Name:
[Not specified in text]
Application Number:
[Not specified in text]
Company Official Name:
[Not specified in text]
Company Official Title:
[Not specified in text]
Notary Public Registration Number:
[Not specified in text]
Commission Expiration:
[Not specified in text]
Purpose:
Certification of unchanged permit application information for coal surface mining and reclamation operations
Year:
2021-2022
Location:
Ephrata, Washington, USA
Subject:
Municipal wastewater collection and treatment system upgrades
Document Type:
Project overview / engineering plan summary
Responsible Authority:
City of Ephrata
Mayor:
Bruce Reim
City Administrator:
Mike Warren
Public Works Director:
Bill Sangster
Finance Director/City Clerk:
Leslie Trachsler
Engineer:
Gray & Osborne, Inc.
Funding Source:
Department of Ecology Clean Water State Revolving Fund (CWSRF)
Construction Start:
Summer 2021 (Collection System), Fall 2021/Spring 2022 (WRTF)
Projected Completion:
Late 2021 (Collection System), TBD 2022 (WRTF)
Key Components:
Pipe replacement, sewer realignment, oxidation ditch rehabilitation, clarifier recoating, SCADA system upgrade, UV disinfection installation, equalization basin construction, sludge handling upgrades
Note:
Year
Areas Impacted:
Green Area, White Area, Both Green & White
Joint Inspection with AER:
Yes / No
Drilled within Exploration Restricted Area (ERA):
Yes / No
Flowing Holes Encountered:
Yes / No
Permanent Installations/Structures Left:
Yes / No
New Cut Clearings:
Yes / No
Pushouts:
Yes / No
Campsites:
Yes / No
Helipads:
Yes / No
Turnarounds:
Yes / No
Staging Areas:
Yes / No
Access Roads/Trails:
Yes / No
Slashing Completed:
Yes / No
Rollback:
Yes / No
Ditchblocks / Diversion Ditches:
Yes / No
Watercourse Crossings and Structures Removed:
Yes / No
Noxious Weeds Present:
Yes / No
Fertilizer Applied:
Yes / No
Revegetative Cover Achieved:
Yes / No
Certification by Company Representative:
Signature and Print Name
Year:
2019
Revision Dates:
October 2019, February 2020, July 2020
Location:
Eureka County, Nevada, USA
Document Type:
Mine Plan of Operations and Reclamation Permit Application
Submitted By:
Nevada Vanadium, LLC
Prepared By:
Nevada Vanadium, LLC
Submitted To:
Bureau of Land Management, Battle Mountain District; Nevada Division of Environmental Protection, Bureau of Mining Regulation and Reclamation
Project Name:
Gibellini Project
Scope:
Mining operations, reclamation, environmental compliance
Target Audience:
Regulatory agencies and stakeholders
Covered Period:
2019–2020
Mine Type:
Vanadium mining
Environmental Components:
Air quality, water resources, cultural and paleontological resources, wildlife, erosion control, hazardous materials
Facilities Included:
Heap leach pad, rock disposal area, ore processing, ancillary facilities, water and power systems
Plans Included:
Reclamation plan, monitoring plan, interim management plan, water management plan, spill contingency plan, road maintenance plan, quality assurance plan
Year:
2022–2026
Region / City:
United States
Theme:
Water infrastructure, drought resiliency, water supply
Document Type:
Legislative Act
Agency/Institution:
U.S. Congress
Author:
U.S. Senate and House of Representatives
Target Audience:
U.S. government agencies, state and local governments, public and private entities involved in water management
Period of Validity:
2022–2026
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / City:
Nelson, New Zealand
Subject:
Land use, river disturbance, and reclamation
Document Type:
Resource consent conditions
Authority / Institution:
Nelson City Council
Applicant:
CCKV Maitai Dev Co Limited Partnership
Location:
7 Ralphine Way, Maitai Valley
Commencement Date:
4 August 2025
Lapse Period:
10 years after commencement
Expiry Date:
No expiry
Relevant Legislation:
Section 13 RMA, NES-FW
Involved Parties:
Contractors, subcontractors, iwi representatives
Monitoring Requirements:
Cultural induction, iwi monitoring, environmental monitoring
Construction Plans Reference:
Maitahi Development Nelson – Preliminary Earthworks Plans (Davis Ogilvie, Updated July 2025)
Traffic Management:
TMP required prior to commencement
Archaeological Protocol:
Immediate notification to Council and Heritage New Zealand Pouhere Taonga if archaeological material discovered
Environmental Monitoring:
Cultural Health Index monitoring at 6, 12, and 24 months
End Users / Stakeholders:
Te Tauihu Iwi, local community, regulatory authorities
Year:
2023
Region / City:
Oregon
Subject:
Intensive service requests, residential mental health services
Document type:
Instructional guide
Organization / Institution:
Oregon Health Authority (OHA)
Author:
Oregon Health Authority
Target audience:
Service providers in residential mental health settings
Period of validity:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
2025
Region / City:
N/A
Topic:
Drinking Water Quality Assurance, Compliance Calculation
Document Type:
Methodology
Institution:
N/A
Author:
N/A
Target Audience:
Drinking water suppliers
Period of Validity:
1/07/2024 - 30/06/2025
Approval Date:
N/A
Date of Changes:
N/A
Note:
Year
Topic:
Health Insurance Rates, Data Reporting
Document Type:
Rule
Agency / Institution:
Department of Professional and Financial Regulation, Bureau of Insurance
Target Audience:
Insurance carriers, Health Maintenance Organizations (HMOs), regulatory bodies
Year:
2024
Region / city:
United Kingdom
Subject:
Radiological Protection, Transport of Radioactive Materials
Document Type:
Technical Assessment Guide
Organization:
Office for Nuclear Regulation (ONR)
Author:
Inspector - Nuclear Safety
Target Audience:
ONR safety inspectors
Validity Period:
October 2024 - October 2029
Approval Date:
October 2024
Revision Date:
Not applicable
Document Reference:
NS-TAST-GD-100
Record Reference:
2020/281169
Issue:
2.1
Purpose:
Guidance for assessing shielding designs and dose rates of transport packages for radioactive materials.
Scope:
Focuses on shielding and dose rate assessments in accordance with IAEA regulations for transport safety.
Related Legislation:
IAEA SSR-6 (2018), UK regulations for radioactive materials transport
Note:
Contextual Description
Year:
2024
Region / City:
Milton
Topic:
Electricity distribution rates, rate adjustments, and regulatory filings
Document Type:
Regulatory Filing
Organization:
Milton Hydro Inc.
Author:
Milton Hydro Inc.
Target Audience:
Ontario Energy Board (OEB) staff, regulatory bodies
Period of validity:
Q4 2024
Approval Date:
October 1, 2024
Date of changes:
None
Year:
2024
Region / City:
Virginia
Topic:
Mortgage Loan Document
Document Type:
Note
Organ / Institution:
Fannie Mae/Freddie Mac
Author:
Not specified
Target Audience:
Lenders, Mortgage Loan Originators
Effective Period:
N/A
Approval Date:
May 2024
Date of Changes:
N/A
Contextual Description:
Legal document detailing the terms and conditions of a mortgage loan, with specific instructions for lenders to ensure compliance with applicable laws and regulations, including modifications allowed or required.