№ files_lp_4_process_3_135669
File format: docx
Character count: 6736
File size: 1629 KB
Detailed report on the development and completion of the Corridor X motorway section in Republic of Macedonia as part of the Pan-European transport network, focusing on infrastructure, safety, and regional connectivity.
Year:
2012
Region / city:
Republic of Macedonia
Theme:
Transport Infrastructure
Document Type:
Project Report
Institution:
Ministry of Transport and Communications
Author:
Not specified
Target Audience:
Policymakers, transport authorities, and stakeholders involved in transport infrastructure projects
Period of Validity:
Until 2018
Approval Date:
8th September 2012
Date of Changes:
Not specified
Funding Source:
EBRD, EIB, EU IPAT
Note:
Context
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
Pakistan
Theme:
Infrastructure, Transport
Document Type:
General Procurement Notice
Organization / Institution:
Islamic Republic of Pakistan, National Highway Authority
Author:
National Highway Authority
Target Audience:
Eligible Bidders, Consultants, Contractors
Effective Period:
2023 - ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Danville, PA
Theme:
Astronomy, Telescope Accessories
Document Type:
Product Specifications
Organization / Institution:
MoonLite
Author:
MoonLite
Target Audience:
Astronomers, telescope users
Effective Period:
N/A
Approval Date:
N/A
Modification Date:
N/A
Product:
NiteCrawler2 Axis Rotating Worm Drive Focuser
Version:
1.1.10
Compatibility:
ASCOM, Non-ASCOM, SKYX
Color Options:
6
Power Requirements:
12 volt, 400mA (both motors running), 200mA (Idle)
Weight:
6 lb
Dimensions:
WR25 2.5”, WR30 3.0”, WR35 3.5”
Max Load:
25 lb
Travel Distance:
Approx. 1”
Motor Type:
Stepper motors
Precision:
0.001 degree resolution
Temperature Control:
Remote temperature probe
Available Accessories:
Drawtube extenders, motor ports, threaded adapters
Warranty:
N/A
Installation Program:
NiteCrawler non-ASCOM utility, Beta ASCOM driver
Release Date:
2016-02-22
Year:
2016
Region / City:
Global
Theme:
Firmware Updates
Document Type:
Technical Documentation
Organization / Institution:
Axis Communications
Author:
Axis Communications
Target Audience:
Engineers, Technicians, Product Developers
Period of Validity:
Not specified
Approval Date:
2016-02-22
Date of Changes:
Not specified
Year:
2017
Region / City:
N/A
Topic:
Geospatial standards, Coordinate Reference Systems
Document Type:
Policy Statement
Organization / Institution:
OGC
Authors:
Carl Reed, OGC Architecture Board
Target Audience:
Geospatial professionals, OGC members
Effective Period:
N/A
Approval Date:
2017-06-20
Date of Changes:
N/A
Context:
The document outlines recommended practices for handling coordinate axis order in geospatial data to improve interoperability between systems and reduce confusion.
Year:
2026
Location:
University of Glasgow, Joseph Black Building, Room A3-28
Subject:
X-ray Photoelectron Spectroscopy (XPS) sample submission and measurement
Document Type:
Laboratory instruction / protocol
Responsible Person:
Dr. Chris Kelly
Intended Audience:
Internal and external laboratory users
Submission Method:
Email and in-person/Teams meeting
Data Output:
.xlsx and .vms files
Payment Schedule:
Internal users – November and May; External users – post-completion invoice
Year:
2018
Country:
Czech Republic
Audit authority:
Supreme Audit Office
Audit report number:
17/23
Programme:
Operational Programme Enterprise and Innovation for Competitiveness 2014–2020
Priority axis:
Priority Axis 3
Specific objective:
Improving the energy efficiency of the business sector (SO 3.2)
Audit period under review:
2014–2017
Audit implementation period:
September 2017 – February 2018
Approval date:
25 June 2018
Supervisory body decision:
Resolution No. 10/VIII/2018 of the Board of the Supreme Audit Office
Audited public institutions:
Ministry of Industry and Trade; Business and Innovation Agency
Audited beneficiaries:
ČEZ Energetické služby, s.r.o.; ELMER, spol. s r.o.; Josef Durák; Kaiser servis, spol. s r.o.; KARBOX s.r.o.; KAVIS Reality s.r.o.; KRÁLOVOPOLSKÁ KOVÁRNA, s.r.o.; MANAG správní, a.s.; Oční studio Fovea s.r.o.; OPATISK s.r.o.; OSTROJ a.s.; Saint-Gobain Construction Products CZ a.s.; STAVOS Chlumec n. Cidl. s.r.o.; ŠUMAVSKÁ tower s.r.o.; ZETINA, spol. s r.o.
Sector:
Energy efficiency in industry
Funding source:
European Union funds
Policy framework:
Europe 2020 strategy; National Energy Efficiency Action Plan
Target energy savings:
20 PJ within OP EIC Priority Axis 3; 51.1 PJ national target by 2020
Key financial allocation:
CZK 22 billion for energy savings under OP EIC Priority Axis 3
Year:
2023
Region / City:
Chesapeake Bay Watershed
Topic:
Stream Restoration, Forest Management
Document Type:
Program Report
Organization / Institution:
Chesapeake Bay Program (CBP), Chesapeake Bay Trust (CBT)
Author:
Not specified
Target Audience:
Government agencies, researchers, environmental stakeholders
Period of Implementation:
Short-Term, Mid-Term, Long-Term
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Year
Year:
Not specified
Region / City:
Not specified
Topic:
Road and transport infrastructure design
Document type:
Technical manual
Institution:
Not specified
Author:
Not specified
Target audience:
Professionals in road design, urban planning, and local government
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Year:
2020
Region / City:
Bangladesh
Subject:
Environmental and Social Commitment
Document Type:
Commitment Plan
Organization / Institution:
Roads and Highways Department, Local Government Engineering Department, Government of Bangladesh
Author:
Roads and Highways Department, Local Government Engineering Department
Target Audience:
Project implementers, World Bank
Period of Validity:
During project implementation
Approval Date:
April 2020
Amendment Date:
Not specified
Year:
2025
Region / City:
Eastern New Mexico
Topic:
National Interest Electric Transmission Corridor (NIETC), energy infrastructure, land rights
Document Type:
Government report
Agency / Institution:
U.S. Department of Energy (DOE)
Author:
U.S. Department of Energy
Target Audience:
General public, property owners in New Mexico, energy infrastructure developers
Effective Period:
2025-2026
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Context
Year:
2019
Region / City:
Burkina Faso
Topic:
Regional Connectivity, Transport Infrastructure
Document Type:
Report
Organization / Institution:
World Bank
Author:
Aiga Stokenberga, Mathilde Lebrand, Anca Cristina Dumitrescu
Target Audience:
Policymakers, Transport Economists, Regional Planners
Period of Effectiveness:
2019–ongoing
Approval Date:
2019
Date of Last Update:
2019
Bid Number:
ECR/SCM/PRCL2/EL/10/2021
Closing Date:
21 January 2022
Closing Time:
12:00 NOON
Delivery Address:
Passenger Rail Agency of South Africa, PRASA CRES, 8 Station Street Station Building, East London
Location:
East London, South Africa
Scope:
Refurbishment, alterations, and additions at Mtsotso, Mdantsane, Mount Ruth, and Egerton Station
Duration:
12 months construction period
Type:
Request for Proposal (RFP)
Issuing Organization:
Passenger Rail Agency of South Africa (PRASA)
Confidentiality Requirements:
Applicable to all bidders and associated parties
Regulatory Notice:
Recipients outside South Africa should observe relevant local regulations
Year:
2022
Region / City:
Oregon
Subject:
Hazardous Materials Assessment
Document Type:
Template
Organization:
Oregon Department of Transportation (ODOT)
Author:
Not specified
Target Audience:
Environmental Consultants, Certified LPAs, Project Managers
Effective Period:
Not specified
Approval Date:
6/27/22
Date of Modifications:
Not specified
Note:
Year
Country:
United Republic of Tanzania
Project Name:
Second Central Transport Corridor Project
Project ID:
P103633
Report No.:
ICR00004196
Report Type:
Implementation Completion and Results Report (Core ICR)
Financing Instrument:
SIL
Credits:
IDA-44550; IDA-51850
Total Commitment:
SDR 115.4 million; SDR 64.9 million
US$ Equivalent:
US$190 million; US$100 million
Borrower:
United Republic of Tanzania
Implementing Agencies:
Dar Rapid Transit Agency (DART); Tanzania National Roads Agency (TANROADS)
Region:
Africa Region
Global Practice:
Transport and ICT Global Practice
ICR Date:
November 7, 2017
Approval Date:
May 27, 2008
Effectiveness Date:
July 7, 2008; November 28, 2008
Closing Date:
December 31, 2011; December 31, 2016
Environmental Category:
A
Sectors:
Transportation; Urban and General Transport; Aviation; Rural and Inter-Urban Roads
Themes:
Trade Facilitation and Market Access; Public Private Partnerships; Urban Infrastructure and Service Delivery
ICR Author:
Peter Nigel Freeman
Project Team Leader:
Yonas Eliesikia Mchomvu
Senior Global Practice Director:
Jose Luis Irigoyen
Practice Manager:
Aurelio Menendez
Year:
2023
Region / City:
Sydney
Topic:
Airspace Change Proposal
Document Type:
Consultation Paper
Organization / Institution:
CASA
Author:
CASA
Target Audience:
Aviation Industry
Period of Validity:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Contextual Description
Year:
2025
Region / City:
Gunnison, CO
Topic:
Urban planning, transportation, land use
Document Type:
Request for Proposals (RFP)
Agency / Organization:
Gunnison County
Author:
Patty Dowd Schmitz
Target Audience:
Consultants, planning professionals
Period of Effect:
Spring 2026 (planning process start)
Approval Date:
December 16, 2025
Date of Changes:
Not specified
Author:
Reinout Polders
Student Number:
302678
Institution:
Erasmus University Rotterdam
Program:
Master Program Economics & Business
Specialization:
Urban, Port and Transport Economics
Supervisor:
dr. P.A. van Reeven
Date:
17 November 2011
Keywords:
Second Maasvlakte, Dedicated Truck Lanes, Economic effects
Type of Document:
Master Thesis
Subject:
Transport infrastructure and economic evaluation
Geographical Focus:
Port of Rotterdam and the Netherlands
Case Studies:
Second Maasvlakte, Betuwe-route
Chapters:
9
Includes:
Abstract, Table of Content, Reference List, Appendix
Project:
Martinus Rail Corridor Project
Document Type:
Health Questionnaire and Declaration Form
Related Standard:
National Standard for Health Assessment of Rail Safety Workers
Applicable Workers:
Rail Safety Workers
Organisation:
Martinus Pty Ltd
Associated Entity:
Inland Rail
Required By:
PCBU (Employer/Contractor)
Purpose:
Health assessment and fitness for duty verification
Assessment Scope:
Rail Safety Worker Medical and Health Management Plan
Medical Categories:
Cat 1 and 2; Cat 3
Compliance Requirements:
Drug and alcohol testing; Project HSE Inductions
Authorised Health Professional:
Required for medical review and assessment
Declaration Type:
Employee Declaration; Employer Declaration and Authorisation