№ lp_1_14868
Draft regulatory decision document records the competent authority’s reasoning on a proposed environmental permit variation, including assessment of a time-limited derogation from BAT emission levels for refinery loading and unloading operations at a major industrial installation.
Year: 2025
Country: United Kingdom
Region: Ellesmere Port, Cheshire
Site: Stanlow Manufacturing Complex
Operator: Essar Oil (UK) Limited
Regulatory framework: Environmental Permitting Regulations 2016
Directive: Industrial Emissions Directive
BAT reference: Refining of Mineral Oil and Gas BAT Conclusions (2014/7/738/EU)
Derogation subject: BAT Conclusion 52
Derogation period: Until 31/10/2025
Pollutants covered: Non-methane volatile organic compounds; Benzene
BAT-AELs referenced: NMVOC 10 mg/Nm3; Benzene 1 mg/Nm3
Permit type: Environmental permit variation
Decision status: Draft
Purpose: Record of decision-making and consultation considerations
Activities regulated: Refining mineral oils; Oil movements; Chemical activities; Incineration; Combustion; Waste recovery or disposal; Carbon capture for geological storage
Competent authority role: Assessment of application and setting of permit conditions
Source type: Draft regulatory decision document
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.