№ lp_1_2_16786
File format: docx
Character count: 25702
File size: 49 KB
This document outlines the responsibilities and general requirements for designers involved in the planning and construction phases of projects, detailing specific actions, standards, and documentation needed throughout the process.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Subject:
Mechanical Design Guidelines
Document Type:
Guidelines
Institution:
Facility Planning & Control (FPC)
Target Audience:
Mechanical Designers
Year:
Not specified
Region / City:
Not specified
Theme:
Wood doors specification for construction projects
Document Type:
Specification
Organization / Institution:
Simpson Door Company
Author:
Not specified
Target Audience:
Designers and builders
Period of validity:
Not specified
Approval Date:
Not specified
Date of amendments:
Not specified
Note:
Year
Topic:
Health and safety, CDM regulations
Document type:
Checklist
Target audience:
Principal Designers, Project Managers, Contractors
Year:
2023
Region / City:
South Carolina
Topic:
Interior design regulation
Document type:
Legislative Bill
Organization / Institution:
South Carolina General Assembly
Author:
South Carolina General Assembly
Target audience:
Legislators, professionals in architecture and interior design
Effective period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Job number
Rev:
1
Year:
2015
Topic:
Construction Health and Safety
Document Type:
Report
Target Audience:
Designers, Project Managers, Contractors
Note:
Year
Organization / Institution:
Vicwest Inc.
Target Audience:
Designers, Contractors, Engineers
Year:
XXXX
Region / City:
South Dakota
Theme:
Engineering / Construction
Document Type:
Instruction Manual
Organization / Institution:
South Dakota Department of Transportation (SDDOT)
Author:
Not specified
Target Audience:
Designers, Contractors
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2020
Region / Country:
Europe
Topic:
Inclusive Higher Education
Document Type:
Training Course Description / Project Output
Organization / Institution:
INCLUSIVE HE Project Consortium
Authors:
European Higher Education experts, project partners
Target Audience:
Higher education policymakers, learning designers, academics
Duration:
4 hours face-to-face module
Objectives:
Support design, implementation, and monitoring of inclusive policies; build competencies of academics and learning designers; improve access to inclusive higher education
Methods:
Design Thinking Methodology, inclusive pedagogies
Resources:
Ballenger & Sinclair (2020), Chambers (2020), project training materials
Partner Countries:
Cyprus, Belgium, Finland, Romania, Greece
Focus Areas:
Inclusion of underrepresented groups, diversity in ethnicity, culture, migration, gender, ability, sexual orientation, religion
Training Outcomes:
Ability to design inclusive programs, evaluate existing courses, modernize curricula, integrate inclusive practices
Target Group Impact:
Direct – academic and policy staff; Indirect – higher education students
Year:
2026
Organization:
Department of Agriculture, Fisheries and Forestry (DAFF)
Document type:
Policy / Procedure Manual
Version:
7.3
Scope:
Biosecurity industry participants
Audit types:
Probationary Audit Rate, Low Audit Rate
Compliance categories:
Critical non-compliance, Major non-compliance, Minor non-compliance
Key arrangement outcomes:
Containment, Isolation, Security, Identification, Traceability, Hygiene, Movement, Release, Awareness, Inspection, Treatment, Arrangement compliance, Notification, Supporting functions
Target audience:
Biosecurity industry participants
Fee structure:
On site $62/15min, Off site $37/15min
Reference conditions:
Biosecurity containment level 2 (BC2), Microbiological Class 5.2
Documented procedures:
Audit checklist, Site mapping, Signage, Access control, Waste storage
Year:
2013
Region / City:
Nanisivik, Nunavut
Topic:
Spill Contingency Plan
Document Type:
Plan
Organization:
Department of National Defence, Defence Construction Canada
Author:
Stantec Consulting Ltd.
Target Audience:
Contractors, Facility Managers
Effective Period:
During construction and operation phases
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2020
Region / city:
Brussels
Topic:
Transport, Infrastructure, European Union
Document type:
Report
Organization / institution:
European Commission
Author:
European Commission
Target audience:
EU stakeholders, transportation sector professionals
Period of validity:
2019-2030
Approval date:
16 July 2020
Date of changes:
N/A
Country:
Indonesia
Project name:
Global Environment Facility Indonesia Sustainable Cities Impact Project
Project acronym:
GEF-SCIP
Project ID:
P173446
Grant number:
TF0B8114
Document type:
Aide-Memoire
Mission type:
Project Implementation Support Mission
Mission period:
May 13–21, 2024
Project effectiveness date:
December 21, 2022
Project closing date:
June 30, 2027
Total financing:
US$15.87 million
Disbursement to date:
US$1.43 million
Disbursement percentage:
9.01%
Implementing agency:
Ministry of National Development Planning (Bappenas)
Financing institution:
Global Environment Facility
Cities covered:
Balikpapan; Bitung; DKI Jakarta; Palembang; Semarang
Project components:
Integrated spatial planning and urban management; Catalyzing integrated investment in priority areas; Piloting innovative financing approaches and instruments; Policy dialogue and knowledge management; Project management
Year:
2022
Region / City:
New Philadelphia, Ohio
Topic:
Mobile food service operations
Document Type:
Plan Review and Guidelines
Author:
Food Safety Program, New Philadelphia City Health Department
Target Audience:
Food business owners intending to operate mobile food facilities
Period of Validity:
Ongoing (as per Ohio Law)
Approval Date:
4/29/2022
Date of Last Change:
None specified
Contact Information:
Provided for multiple relevant authorities
Year:
2021
Organization:
European Commission
Service:
Service for Foreign Policy Instruments (FPI)
Programme:
European Peace Facility (EPF)
Type of document:
Call for expression of interest
Place of employment:
Brussels
Unit:
FPI.5
Job profiles:
Audit assistance; Legal advice including anti-fraud, data protection and access to documents
Grades:
FG III; FG IV
Number of posts:
2
Eligibility:
Contract agents in EU institutions; EPSO CAST reserve list or database candidates
Languages required:
English; French
Application deadline:
23/08/2021
Recruitment period:
From October 2021
Contract type:
Contract agent under Article 3b CEOS
Security requirement:
Security clearance up to SECRET UE/EU SECRET or willingness to undergo vetting
Contact:
[email protected]
Year:
2026
Region / City:
United States
Subject:
Inpatient Rehabilitation Facility (IRF) Prospective Payment System (PPS) & Quality Reporting Program (QRP)
Document Type:
Supporting Statement
Agency:
Centers for Medicare & Medicaid Services (CMS)
Author:
U.S. Department of Health and Human Services
Target Audience:
Healthcare professionals, policymakers, and administrators in rehabilitation facilities
Effective Date:
October 1, 2026
Date of Approval:
Not specified
Date of Revision:
March 29, 2024
Expiration Date:
Not specified
Year:
2025
Region / city:
United States
Theme:
Healthcare, Medicare, Skilled Nursing Facilities
Document type:
Government proposal
Agency / organization:
Centers for Medicare & Medicaid Services (CMS)
Author:
Centers for Medicare & Medicaid Services (CMS)
Target audience:
Healthcare providers, Medicare beneficiaries, policy makers
Period of validity:
FY 2025
Approval date:
2025
Date of amendments:
N/A
Issuing authority:
Ministry for Primary Industries
Jurisdiction:
New Zealand
Legal basis:
Biosecurity Act 1993
Document type:
Operating manual
Facility type:
Transitional Facility for uncleared risk goods
Approval status:
Approved Transitional Facility
Regulatory standards referenced:
TFGEN (Standard for General Transitional Facilities for Uncleared Risk Goods)
Scope of activities:
Receipt, holding, processing, treatment and inspection of uncleared risk goods; inspection of imported containers
Responsible roles:
Transitional Facility Operator; Deputy Transitional Facility Operator; Accredited Person
Compliance requirements:
MPI inspection and verification audits; access for MPI Inspectors at any reasonable time
Version control:
Review and amendments record with dates and sections
Training requirements:
MPI-approved training and refresher training for operators and accredited persons
Operational areas covered:
Security, biosecurity equipment, inspections, record keeping, hygiene management, pest control, audits, contingency plans
Year:
2010
Region / City:
Washington, DC
Theme:
Patient Safety, Healthcare Facilities
Document Type:
Directive
Institution:
Veterans Health Administration
Author:
Department of Veterans Affairs
Target Audience:
Healthcare professionals, facility administrators
Period of Action:
2010-2014
Approval Date:
June 28, 2010
Amendment Date:
Not specified
Note:
Year
Document Type:
Form
Year:
FY14
Region / City:
Various
Topic:
Healthcare Facility Complexity Levels
Document Type:
Report
Organization / Institution:
Veterans Health Administration (VHA)
Author:
Not specified
Target Audience:
Healthcare professionals, administrators in the VHA
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified