№ lp_1_2_15275
File format: docx
Character count: 9282
File size: 45 KB
The checklist provides a structured approach for ensuring environmental document quality, including verification of formatting, terminology, accuracy, and the inclusion of necessary content to meet approval requirements.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / city:
Cleveland, Ohio, USA
Topic:
Forensic Toxicology, Novel Psychoactive Substances (NPS), Analytical Chemistry
Document Type:
Scientific article
Organization / Institution:
Cuyahoga County Medical Examiner’s Office and Regional Forensic Science Laboratory
Authors:
Danai T. Taruvinga MS., D-ABFT-FT, Heather L. Ciallella PhD, Luigino G. Apollonio PhD
Target Audience:
Forensic toxicologists, chemists, researchers in drug chemistry
Period of validity:
Not specified
Date of approval:
Not specified
Date of modifications:
Not specified
Contextual description:
A scientific article discussing the challenges in identifying new isomeric novel psychoactive substances (NPS) in forensic toxicology casework, focusing on Fluorexetamine and 2-Fluoro-2-oxo PCE.
Version:
1.4
Date:
May 2021
Organization:
Department of Veterans Affairs
Office:
Office of Information and Technology (OI&T)
Project:
PCE Standardization 1.0
Related Packages:
Patient Care Encounter (PCE), Clinical Reminders (PXRM), Health Summary (GMTS)
Patches:
PX1211; PXRM242; GMTS2.7122; GMPL253; OR3501
Document Type:
Technical deployment and installation guide
Scope:
Deployment, installation, back-out, and rollback procedures
Dependencies:
LEX2.0102; XU8.0657; PX1.0216; DI22.23; DI22.25; OR3.0361; OR3.0377; PXRM2.045; PXRM2.046; GMPL250; GMTS2.756; GMTS2.7110; GMPL2.049
Target Environment:
VistA system local sites
Authority:
Veterans In Process (VIP) Critical Decision Point representatives; Facility Area Manager
Revision History:
Initial Draft April 2018; updates through Version 1.4 May 2021
Year:
2023
Region / City:
United States
Topic:
Healthcare Technology
Document Type:
Technical Manual
Organization / Institution:
Department of Veterans Affairs
Author:
Booz Allen Hamilton, CPRS Development Team, Liberty ITS
Target Audience:
Medical practitioners, IT specialists in healthcare
Effective Period:
December 2023 and earlier revisions
Approval Date:
December 2023
Date of Changes:
December 2023, June 2023, September 2022, and earlier revisions
Year:
2023
Region / City:
United States
Theme:
Healthcare, Technology
Document Type:
User Manual
Organization / Institution:
Department of Veterans Affairs, Office of Information and Technology (OI&T)
Author:
Booz Allen Hamilton, Liberty ITS
Target Audience:
Healthcare professionals, IT staff working with Veterans Affairs systems
Effective Period:
December 2023
Approval Date:
December 2023
Modification Date:
12/2023
Year:
2026
Region / City:
Hybrid (Home based/In clinic)
Field:
Mental Health / Counselling
Document Type:
Job Description
Organization:
Vita Health Group (VHG)
Author:
Human Resources
Target Audience:
Job seekers, Counselling professionals
Period of Activity:
23rd February 2026 - 12 months
Approval Date:
03/12/2019
Date of Changes:
03/12/2019
Year:
2016–2017
Region / City:
Williamsburg, Virginia
Topic:
Legal Citation Checking and Editorial Procedures
Document Type:
Manual
Organization:
William & Mary Environmental Law and Policy Review
Author:
Editorial Board of the William & Mary Environmental Law and Policy Review
Target Audience:
Cite-checkers, editors, and staff of the William & Mary Environmental Law and Policy Review
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2021
Country:
Nigeria
Project Number:
P175237
Type of Document:
Draft Final Report
Institution:
Federal Project Management Unit (FPMU), Federal Government of Nigeria
Scope:
Environmental and Social Management Framework
Target Audience:
Project stakeholders, government agencies, and development partners
Legal Framework Referenced:
Nigerian environmental legislation, World Bank Environmental and Social Framework, international conventions
Geographical Focus:
Semi-arid regions of Nigeria
Project Components:
Institutional arrangements, ESMF implementation, stakeholder engagement, environmental and social impact assessment
Enddate:
September 2021
Language:
English
Report Status:
Draft Final
Document type:
Environmental and Social Management Plan
Project name:
Upgrading of Manzese A and Manzese B to Modern Markets
Location:
Songea Municipality, Ruvuma Region, United Republic of Tanzania
Implementing authority:
Songea Municipal Council
Supervising institution:
President’s Office – Regional Administration and Local Government
Funding source:
World Bank credit under the Tanzania Cities Transforming Infrastructure and Competitiveness Project
Prepared by:
Songea Municipal Council in collaboration with NORPLAN Tanzania Ltd
Existing facilities:
Manzese A Market and Manzese B Market
Proposed works:
Construction of single-storey market buildings with supporting infrastructure including sewerage, stormwater drainage, circulation areas and walkways
Land ownership:
Songea Municipal Council
Land area:
Approximately 16,070 square meters
Resettlement and compensation:
Not expected
Applicable frameworks:
World Bank Environmental and Social Framework and Environmental and Social Standards 1–10
Relevant national legislation:
Environmental Management Act, Land Act, Urban Planning Act, Occupational Health and Safety Act, Public Health Act, and related sectoral laws
Stakeholder engagement:
Conducted in accordance with World Bank ESS10 and national EIA regulations
Year:
2018
Jurisdiction:
Queensland, Australia
Subject:
Environmental regulation, resource activity rehabilitation
Document type:
Application form
Governing body:
Department of the Environment, Tourism, Science and Innovation
Legislation:
Environmental Protection Act 1994, Mineral and Energy Resources (Financial Provisioning) Act 2018
Guideline referenced:
Estimated rehabilitation cost under the Environmental Protection Act 1994 (ESR/2018/4425)
Target audience:
Environmental authority holders for resource activities
Required actions:
Submission of ERC application, compliance with section 298 of EP Act and relevant guidelines
Year:
2021
Region / City:
Laos
Theme:
COVID-19 response, business recovery, trade facilitation, private sector support
Document Type:
Environmental and Social Action Plan (ESAP)
Organization:
Ministry of Industry and Commerce (MoIC)
Author:
World Bank
Target Audience:
Government, private sector, stakeholders involved in business development and trade
Period of Implementation:
2021-2023
Approval Date:
April 19, 2021
Date of Revisions:
Ongoing (as required)
Year:
2025
Region / City:
Shijiazhuang City
Topic:
Environmental and Social Impact Assessment
Document Type:
Assessment Report
Organization / Institution:
World Bank
Author:
World Bank
Target Audience:
Stakeholders involved in urban planning and environmental management
Period of Action:
Not specified
Approval Date:
January 24th 2025
Date of Changes:
Not specified
Year:
2025
Region / City:
Wisconsin
Subject:
Environmental re-evaluation for transportation project
Document Type:
Environmental Re-evaluation
Organization / Institution:
Wisconsin Department of Transportation
Author:
Wisconsin Department of Transportation
Target Audience:
Environmental Coordinators, Federal and State Highway Administrators, Project Stakeholders
Period of validity:
Until re-evaluation or new project stages
Approval Date:
12/2025
Note:
Context
Year:
2024
Region / City:
Karnataka, India
Program:
Karnataka Water Security and Resilience Program (KWSRP)
Type of Document:
Environmental and Social Systems Assessment (ESSA)
Financing Institution:
International Bank for Reconstruction and Development (World Bank)
Objective:
Improve water security and climate resilience through infrastructure, institutional, and financial capacity development
Scope:
Program for Results (PforR)
Key Areas:
Water infrastructure, institutional strengthening, financial management
Stakeholders:
Government of Karnataka, urban local bodies, civil society organizations
Methodology:
Assessment of environmental and social systems, consultations, review of regulatory frameworks
Period Covered:
2024
Year:
2025
Region / city:
Philippines
Topic:
Environmental and social assessment
Document type:
Assessment report
Organ / institution:
Department of Agriculture
Author:
N/A
Target audience:
Policymakers, agricultural stakeholders, environmental and social experts
Period of validity:
N/A
Approval date:
February 17, 2025
Date of changes:
N/A
Year:
2020
Region / City:
Lao PDR
Sector:
MSME, Finance, Environmental & Social Management
Document Type:
Working Draft
Institution:
Department of Small and Medium Enterprise Promotion (DOSMEP)
Author:
N/A
Target Audience:
Micro, Small, and Medium Enterprises (MSMEs), financial institutions, and stakeholders in Lao PDR
Period of Validity:
Ongoing project, emergency and recovery phase
Approval Date:
January 4th, 2020
Date of Amendments:
N/A
Year:
2024
Region / City:
Uttar Pradesh
Subject:
Environmental and Social Commitment Plan
Document Type:
Environmental and Social Commitment Plan
Organization / Institution:
Uttar Pradesh Diversified Agriculture Support Project Society (UPDASP)
Author:
Not specified
Target Audience:
Not specified
Period of Implementation:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Texas
Topic:
Backflow Prevention Assembly Test and Maintenance
Document Type:
Instruction Manual
Organization / Institution:
Texas Commission on Environmental Quality
Author:
Texas Commission on Environmental Quality
Target Audience:
Licensed testers, public water systems
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
Nurek, Tajikistan
Theme:
Environmental and Social Management, Hydropower
Document Type:
Final Report
Organization / Institution:
Barqi Tojik, Nurek Hydropower Company
Author:
N/A
Target Audience:
Government officials, environmental and social management specialists, stakeholders in the rehabilitation project
Period of Validity:
N/A
Approval Date:
May 2020
Date of Amendments:
N/A
Country:
United Republic of Tanzania
Project name:
Digital Tanzania Project
Document type:
Environmental and Social Commitment Plan
Abbreviation:
ESCP
Project ID:
P160766
Sector:
Information and communication technology
Implementing authority:
Ministry of Communication and Information Technology
Co-implementing authority:
President’s Office Public Service Management and Good Governance
Financing institution:
World Bank
Date:
April 22, 2021
Related frameworks:
Environmental and Social Management Framework; Resettlement Policy Framework; Stakeholders Engagement Plan; Labor Management Procedures; Vulnerable Groups Planning Framework
Monitoring frequency:
Quarterly
Scope:
Environmental and social risk management