№ files_lp_3_process_7_021060
File format: docx
Character count: 1657
File size: 25 KB
Effective:
August 1, 2025
Year:
2025
Region / City:
United States
Subject:
Pavement Patching
Document Type:
Special Provision
Organization / Institution:
Central Bureaus of Research and Construction
Author:
Jack A. Elston
Target Audience:
Contractors, Project Coordinators
Period of Action:
August 1, 2025 and subsequent lettings
Approval Date:
April 18, 2025
Date of Changes:
August 1, 2025
Context:
A special provision related to pavement patching, clarifying requirements for tie bars and welded wire reinforcement in patches.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Birmingham, Alabama
Topic:
IT Support Services, Campus Desktop Patching
Document Type:
Webinar Recording
Organ / Institution:
EDUCAUSE, University of Alabama at Birmingham
Author:
Jamie Witter, Scott Carson
Target Audience:
IT professionals, University staff
Period of Action:
Ongoing
Approval Date:
February 26, 2020
Date of Changes:
Not specified
Year:
2021
Region / City:
Findon
Topic:
Clergy appointment
Document Type:
Announcement
Organization / Institution:
Church
Author:
Gail and Kath
Target Audience:
Congregation members, community
Effective Date:
5th May 2021
Date of Changes:
N/A
Context:
A community update detailing the appointment of Revd. Helena Buqué as the incumbent for Findon, Clapham, and Patching, alongside some local news and observations from the area.
Year:
2018
Region / City:
Australia
Topic:
Laser and IPL treatments, safety standards
Document Type:
Standard Operating Procedure
Organization:
Standards Australia
Author:
Not specified
Target Audience:
Healthcare professionals, laser technicians
Period of validity:
Indefinite
Approval Date:
Not specified
Date of amendments:
Not specified
Clinical practice guideline:
Yes
Resource:
Laser safety audit, education, training, and consultancy
Reference(s):
AS/NZ 4173:2018 Safe use of lasers and light sources in health care. Standards Australia
Disclaimer:
This guideline provides a framework for clinical practice and should not replace other relevant clinical practice guidelines or professional judgement.
Year:
2017
Institution:
Iowa State University, Institute for Transportation
Course:
CIE 822 Graduate Project
Author:
Katelyn Welch
Document Type:
Graduate Project Paper
Topic:
Partial Depth Concrete Repairs
Target Audience:
Engineering students, transportation engineers
Date Submitted:
May 4, 2017
Standards Reviewed:
FHWA, ACPA, NCPTC, ASTM C39/C39M, C157/C157M, C469/C469M, C531/C531M, C666/C666M, C882/C882M, C928/C928M, C1581/C1581M, C1583/C1583M
Geographical Scope:
United States
Materials Evaluated:
Approved rapid setting patching products, bonding materials
End-Use Application:
Pavements and bridge decks
Research Focus:
Performance analysis, material selection, new material combinations
Partial Depth Repair Types:
Spot Repairs, Joint Crack Repairs, Bottom Half Repairs
Effective Date:
May 1, 2012
Revision Date:
March 9, 2016
Document Section:
Article 442.08(a)
Referenced Standard:
Standard Specifications
Subject:
Hot Mix Asphalt placement for pavement patching
Mixture Types:
IL-9.5, 9.5FG, 9.5L, IL-19.0, 19.0L
Temperature Requirement:
Minimum 40°F (5°C) in shade with rising forecast and unfrozen subgrade
Compacted Lift Thickness:
1¼–3 in. (32–75 mm) for IL-9.5 mixtures; 2¼–4½ in. (57–114 mm) for IL-19.0 mixtures
Maximum Thickness with Vibratory Roller:
Up to 6 in. (150 mm) excluding the top lift when required density is achieved
Compaction Methods:
Mechanical tamper, vibrating tamper, or self-propelled roller; trucks permitted for supplemental compaction
Surface Finishing Allowance:
Completed patch may be finished up to ½ in. (13 mm) above existing pavement
Application Scope:
Class D and partial-depth pavement patching
Note:
Year
Subject:
Portland Cement Concrete Pavement Conformity
Document Type:
Contract Specification
Target Audience:
Contractors, Engineers
Note:
Year
Topic:
Concrete, Pavement Construction
Document type:
Technical Specifications
Target audience:
Engineers, Contractors
Note:
Year
Theme:
Permeable Pavement Systems, Inspection, and Maintenance
Document Type:
Operation & Maintenance Plan
Agency / Organization:
[Organization Name]
Author:
[Author Name]
Target Audience:
Departments responsible for maintenance and operation of permeable pavements
Effective Period:
From the completion of the project construction
Year:
2017–2021
Region / City:
Ontario, Canada
Document Type:
Technical Specification
Organization / Agency:
Ontario Ministry of Transportation
Reference Standards:
OPSS 308, OPSS 313, OPSS 314, OPSS 341, OPSS 366, OPSS 369, OPSS 510, OPSS 1010, OPSS 1101, OPSS 1151, LS-100, MI-183, SP-024, SP-026, LS-296, LS-800, ASTM E950-09, ASTM E1703-10, AASHTO GDPS-4-M, MEPDG-13, StreetPave 12, Pavement Designer
Author:
Ontario Ministry of Transportation
Target Audience:
Contractors and engineers responsible for pavement construction and maintenance
Scope:
Administration and enforcement of pavement performance standards, including required repairs for non-conformance
Key Dates:
Special Provision effective July 21, 2017; revised March 2021
Note:
Year
Topic:
Road and Bridge Construction Specifications
Document Type:
Standard Provision
Organ / Institution:
Construction Engineering Services Branch
Target Audience:
Engineers, Contractors
Year:
2019
Region / city:
Australia
Theme:
Road construction
Document type:
Specification
Organization / institution:
Department of Transport
Author:
Unknown
Target audience:
Contractors, engineers, and construction professionals in roadworks
Period of validity:
Indefinite
Approval date:
October 2019
Date of amendments:
None specified
Year:
2021
Region / City:
Western Australia
Topic:
Pavement stabilisation
Document Type:
Technical specification
Organization:
MAIN ROADS Western Australia
Author:
MME
Target Audience:
Contractors, Engineers, Road Authorities
Period of Validity:
Not specified
Approval Date:
30/09/2021
Date of Changes:
Not specified
Note:
Contextual Description
Year:
2023
Region / City:
Auckland
Subject:
Aggregates for Road Pavement Construction
Document Type:
Specification
Agency / Institution:
Auckland Transport
Author:
Not specified
Target Audience:
Contractors, Engineers, Suppliers
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
PERFORMANCE SPECIFICATION FOR DESIGN AND CONSTRUCTION AND RECONSTRUCTION OF RIGID PAVEMENT STRUCTURE
Note:
Year
Year:
2017
Region / City:
Washington DC area
Topic:
Construction standards for porous flexible pavement
Document Type:
Technical specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Construction professionals, certified installers
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context description:
A technical specification for the construction and installation of porous flexible pavement (Flexi-Pave) for various applications such as sidewalks, parking lots, and tree preservation.
Year:
2026
Region / city:
Colorado, US
Document type:
Technical specification
Subject:
Road construction materials and procedures
Responsible organization:
Colorado Department of Transportation (CDOT)
Target audience:
Contractors and engineers
Applicable period:
Project-specific
Reference standards:
AASHTO T245, CPL 5115, CPL 5109, CP 48, AASHTO T305, AASHTO R46, CP 5120, CP 59
Testing methods:
SuperPave, Marshall Method
Required approvals:
Mix design approval by Engineer
Special instructions:
Demonstration Control Strip (DCS) required before full production
Document Type:
Technical specification
Subject:
Road pavement markings and coloured pavement treatments
Jurisdiction:
Queensland
Local Authority:
Brisbane City Council
Related Authority:
Queensland Department of Transport and Main Roads
Standards Referenced:
AS 1742; AS/NZS ISO 9001; AS 4049.2; AS 4049.3; AS 1906.3; AS/NZS 1906.1; AS 2700; ASTM E303-93 (2008)
Reference Specifications:
S110 General Requirements; S120 Quality; S150 Roadworks; S154 Traffic Signs and Associated Roadside Furniture
Amendment History:
Ed/Rev 1.0 (Apr 2014); 2.0 (May 2016); 3.0 (Nov 2018)
Quality Requirement:
Third party accredited Quality Assurance System to AS/NZS ISO 9001
Scope:
Longitudinal and transverse pavement markings; raised pavement markers; coloured pavement treatments; installation requirements; inspection and testing
Year:
2025
Region / City:
Colorado
Theme:
Pavement Marking
Document Type:
Standard Special Provision
Organization / Institution:
Colorado Department of Transportation (CDOT)
Author:
Construction Engineering Services Branch
Target Audience:
Contractors and construction engineers involved in CDOT projects
Effective Period:
Ongoing
Approval Date:
March 21, 2025
Amendment Date:
Not provided
Year:
2024
Region / City:
Not specified
Subject:
Pavement marking materials and specifications
Document Type:
Special Provision
Agency / Institution:
Central Bureau of Operations
Author:
Jack A. Elston
Target Audience:
Contractors, engineers, and agencies involved in road construction
Effective Period:
April 1, 2024 to indefinite
Approval Date:
April 9, 2024
Amendment Date:
April 2, 2024