№ files_lp_4_process_3_103764
File format: docx
Character count: 8266
File size: 1760 KB
This document is an inspection report on the safety and regulatory compliance of Heysham Power Stations during the specified period, outlining inspections, regulatory activities, and safety assessments.
Year:
2022
Region / City:
Heysham
Subject:
Nuclear Site Inspection
Document Type:
Report
Author:
Office for Nuclear Regulation (ONR)
Target Audience:
General Public, Local Community Liaison Committee (LCLC)
Period of Activity:
1 October – 31 December 2022
Approval Date:
April 2023
Date of Changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
Heysham
Topic:
Nuclear energy, reactor maintenance, shutdown deferral
Document type:
Project assessment report
Organization / Institution:
Office for Nuclear Regulation
Author:
Not specified
Target audience:
Not specified
Period of validity:
Up to 06 October 2025
Approval date:
May 2025
Date of changes:
None
Year:
2024
Region / City:
Heysham
Topic:
Nuclear Regulatory Inspection
Document Type:
Site Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector - Heysham 1
Target Audience:
General public, Heysham Local Community Liaison Committee (LCLC)
Period of Action:
01 October – 31 December 2024
Approval Date:
February 2025
Date of Last Update:
Not specified
Publication date:
February 2024
Year:
2024
Facility:
Heysham 1 Nuclear Power Station
Reactor type:
Advanced Gas-Cooled Reactor
Reactor unit:
Reactor 1
Periodic shutdown identifier:
027
Shutdown period:
October–December 2023
Planned shutdown duration:
69 days
Document type:
Regulatory assessment report
Issuing authority:
Office for Nuclear Regulation
Dutyholder:
EDF Energy Nuclear Generation Limited
Regulatory framework:
Nuclear Site Licence Conditions 28 and 30
Subject areas:
Nuclear safety, examination, inspection, maintenance and testing
Licence instrument referenced:
Licence Instrument 641
Geographic location:
United Kingdom
Year:
2025
Region / City:
Heysham, Lancashire, UK
Document type:
Site inspection report
Organization:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector
Approved by:
Joint Head of Safety Regulation – Operating Reactors
Reporting period:
1 January – 31 March 2025
Publication date:
April 2025
Record reference:
2025/14825
Inspections:
Heysham 1, Heysham 2
Legal frameworks referenced:
Nuclear Installations Act 1965, Energy Act 2013, Health and Safety at Work Act 1974, Ionising Radiations Regulations 2017, Management of Health and Safety at Work Regulations 1999
Key activities:
Routine inspections, non-routine inspections, regulatory assessments, emergency exercise observation
Year:
2025
Region / City:
Heysham
Topic:
Nuclear power station inspection
Document Type:
Regulatory Report
Organization:
Office for Nuclear Regulation (ONR)
Author:
Heysham 2 Nominated Site Inspector
Target Audience:
Local community, industry stakeholders, regulatory bodies
Effective Period:
1 July – 30 September 2025
Approval Date:
Nov 2025
Date of Changes:
N/A
Year:
2024
Region / City:
Heysham
Topic:
Nuclear Site Inspections
Document Type:
Site Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
M Worsley, D Hackney, M Webb
Target Audience:
Public, Local Community Liaison Committee
Period of Activity:
1 January to 31 March 2024
Approval Date:
May 2024
Date of Changes:
N/A
Year:
2024
Region / City:
Heysham
Topic:
Nuclear site inspections, regulatory activities
Document Type:
Site Report
Organization:
Office for Nuclear Regulation (ONR)
Author:
Heysham 1 and 2 Nominated Site Inspectors
Target Audience:
General public, local community liaison committee members, regulatory stakeholders
Period of Action:
1 April to 30 June 2024
Approval Date:
August 24, 2024
Date of Last Update:
August 24, 2024
Year:
2025
Region:
Heysham, United Kingdom
Subject:
Nuclear site inspections and regulatory compliance
Document type:
Site report
Organization:
Office for Nuclear Regulation (ONR)
Author:
Heysham 1 Nominated Site Inspector
Approved by:
Head of Regulation (Operating Reactors)
Publication date:
July 2025
Report period:
01 April – 30 June 2025
Record reference:
2025/25014
Inspections:
Routine and themed inspections of Heysham 1 and 2, including emergency exercises and engineering change management
Compliance frameworks:
Nuclear Installations Act 1965, Energy Act 2013, Health and Safety at Work etc Act 1974, IRR17, MHSWR99
Inspection ratings:
GREEN (no formal action)
Emergency exercises:
Atlas (Heysham 1), Athena (Heysham 2)
Training and qualifications:
Verified for key emergency roles
Waste management:
Radiological waste accumulation and disposal compliance
Year:
2020
Region / city:
Australia
Theme:
Sewage pumping station design
Document type:
Template
Organization:
Urban Utilities
Author:
Harald Kemmetmuller
Target audience:
Design and engineering teams, project managers
Effective period:
2020-2025
Approval date:
29/06/2020
Revision date:
28/01/2025
Year:
2020
Region / City:
Not specified
Subject:
Medicine Prescription and Administration Record
Document Type:
Medical Record
Institution:
Not specified
Author:
Not specified
Target Audience:
Healthcare professionals, particularly nurses and medical practitioners
Validity Period:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
United States
Topic:
Environmental Monitoring, Air Quality
Document Type:
Standard Operating Procedure
Organization / Institution:
U.S. Environmental Protection Agency
Author:
U.S. Environmental Protection Agency
Target Audience:
Air quality monitoring personnel, laboratory technicians
Period of Application:
Ongoing
Approval Date:
January 2020
Date of Changes:
None
Year:
Not specified
Region / City:
North Karanpura
Theme:
Price breakdown for construction and engineering services
Document Type:
Contract / Tender
Organization:
Not specified
Author:
Not specified
Target Audience:
Contractors and service providers in the construction and engineering field
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Document type:
Liaison Statement
Working Group:
WG FM
Project Team:
FM56
Addressee:
ECC PT1
Sender:
WG FM Chairman
Date:
09 February 2018
Reference:
WGFM#90
Related documents:
SE(18)049, FM(18)059 Annex 021
Frequency bands:
918–925 MHz; 1900–1920 MHz
Radio technologies:
GSM-R; LTE; 5G
Subject area:
Spectrum coexistence and harmonised technical conditions
Requested studies:
BEM conditions; EIRP considerations; coexistence with MFCN
Deployment scenarios:
Macro coverage; local coverage
Deadline for results:
End of 2018
Year:
2019
Region / City:
Melbourne, Australia
Theme:
Environmental audit, Infrastructure development
Document Type:
Environmental audit report
Organization:
Rail Projects Victoria (RPV)
Author:
Aurecon Jacobs Mott MacDonald Joint Venture (AJM JV)
Target Audience:
General public, environmental auditors, project stakeholders
Period of Validity:
2019
Approval Date:
10 February 2022
Date of Changes:
N/A
Year:
YYYY
Region / city:
Europe
Topic:
Satellite communication, frequency bands, NGSO FSS systems
Document Type:
ECC Decision
Organization:
European Conference of Postal and Telecommunications Administrations (CEPT)
Author:
N/A
Target audience:
Telecommunications administrators, regulatory bodies, satellite operators
Period of validity:
N/A
Approval date:
DD MM YYYY
Date of amendments:
N/A
Year:
2014
Region / City:
North Hampton, MA
Topic:
Installation of fire alarm pull stations
Document Type:
Solicitation/Contract/Order
Organization / Institution:
Department of Veterans Affairs
Author:
Freida McClain
Target Audience:
Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Hucknall, Nottinghamshire
Topic:
Election of District Councillors
Document Type:
Election Notice
Organization:
Ashfield District Council
Author:
Ashfield District Council
Target Audience:
Voters in Hucknall North
Period of Validity:
4 May 2023
Approval Date:
4 May 2023
Year:
2026
Region / City:
Global
Theme:
Energy efficiency, Compressed air systems
Document Type:
Product Information
Organization / Institution:
Kaeser Kompressoren
Author:
Kaeser Kompressoren
Target Audience:
Companies using compressed air systems
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Queensland, Australia
Topic:
Environmental compliance, sewage treatment, pumping stations
Document type:
Checklist
Organization / institution:
Unitywater
Author:
Not specified
Target audience:
Developers installing Sewage Pumping Stations within Unitywater’s sewerage network
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Year
Region / city:
USA/Caribbean, Europe/Africa/Middle East, Asia/Pacific
Topic:
GMDSS Equipment Testing, DSC Frequencies
Document Type:
Technical guide
Target Audience:
Maritime professionals, ship operators, GMDSS radio operators
Context:
Technical guide on GMDSS equipment testing procedures and station locations for DSC testing.