№ lp_1_2_18365
File format: docx
Character count: 2748
File size: 31 KB
This document is a certification letter that verifies the approval of aggregate materials for use in Illinois Department of Transportation projects, including compliance with specified standards and testing protocols.
Year:
2023
Region / city:
Springfield, Illinois
Topic:
Aggregate material certification for transportation contractors
Document type:
Certification letter
Organization / institution:
Central Bureau of Materials (CBM)
Author:
Not specified
Target audience:
Department of Transportation contractors
Effective period:
Until rescinded
Approval date:
Not specified
Modification date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Region / City:
N/A
Topic:
Drinking Water Quality Assurance, Compliance Calculation
Document Type:
Methodology
Institution:
N/A
Author:
N/A
Target Audience:
Drinking water suppliers
Period of Validity:
1/07/2024 - 30/06/2025
Approval Date:
N/A
Date of Changes:
N/A
Year:
2025
Region / city:
Seattle, WA
Topic:
Fisheries Management
Document Type:
Request Form
Issuing Organization:
National Oceanic and Atmospheric Administration (NOAA), National Marine Fisheries Service (NMFS)
Author:
National Marine Fisheries Service
Target Audience:
QS Permit owners, authorized representatives
Effective Period:
November 15, 2025
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Contextual description
Year:
2026
Note:
Region / City
Topic:
Prior Authorization Data Reporting
Document Type:
Report
Note:
Year
Context:
Application form for connecting power generating modules to the electricity distribution network, specifying conditions and requirements for multiple customers sharing power output.
Year:
N/A
Region / City:
N/A
Subject:
Quality Control Plan for Aggregate Testing
Document Type:
QC Report
Organ / Institution:
N/A
Author:
N/A
Target Audience:
Contractors, Quality Control Personnel
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Form number:
EPA Form No. 8700-29
OMB control number:
2050-0072
Document type:
Regulatory reporting form
Regulatory framework:
Emergency Planning and Community Right-to-Know Act (EPCRA) Section 302; Clean Air Act Section 112(r)
Issuing authority:
U.S. Environmental Protection Agency
Jurisdiction:
United States
Reporting level:
Tier One
Reporting period:
January 1 to December 31
Subject matter:
Emergency and hazardous chemical inventory by hazard type
Facility information included:
Identification, ownership, contacts, emergency coordination
Hazard categories:
Physical hazards and health hazards
Measurement basis:
Aggregate amounts with reporting range codes
Intended respondents:
Facilities subject to EPCRA and CAA requirements
Confidentiality marking:
For Official Use Only
Expiration date:
08/31/2026
Year:
2021
Region / City:
Ireland
Topic:
Demand Side Unit (DSU) Testing
Document Type:
Technical Procedure
Organization:
EirGrid
Author:
EirGrid
Target Audience:
DSU Operators, Technical Personnel
Effective Period:
N/A
Approval Date:
25.03.2021
Modification Date:
N/A
Year:
2021
Region / City:
United Kingdom
Topic:
Integrated Urgent Care Data Collection
Document Type:
Specification
Agency / Institution:
NHS England
Author:
Integrated Urgent Care Team, Operations and Information Directorate
Target Audience:
Integrated Urgent Care and NHS 111 service providers and commissioners
Period of Validity:
2021-22
Approval Date:
April 2021
Date of Revisions:
Not specified
Date of Last Update:
April 2021
Year:
2016
Region / City:
Uttar Pradesh / Lucknow
Theme:
Electricity regulation, tariff determination, revenue requirements
Document type:
Regulatory Order
Institution:
Uttar Pradesh Electricity Regulatory Commission
Author:
Uttar Pradesh Electricity Regulatory Commission
Target audience:
Utility companies, electricity consumers, regulatory bodies
Period of validity:
FY 2016-17
Approval date:
August 1, 2016
Amendment date:
Not mentioned
Year:
2025
Region / City:
Wisconsin
Subject:
Cancer Incidence Data Request
Document Type:
Data Request Form
Agency / Organization:
Department of Health Services, Division of Public Health
Author:
N/A
Target Audience:
Researchers, Health Institutions, IRB Members
Effective Period:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2025
Region / City:
Queensland
Topic:
Supply of Cover Aggregate
Document Type:
Technical Specification
Organization / Institution:
Transport and Main Roads
Author:
Transport and Main Roads
Target Audience:
Contractors, Suppliers
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Organization:
Colorado Department of Transportation
Issuing Unit:
Construction Engineering Services Branch
Related Standard:
Standard Specifications for Road and Bridge Construction
Subject:
PCCP Acceptance and Recycled Concrete Aggregate
Referenced Sections:
105, 106, 412, 601
Applicable Item:
412 — Portland Cement Concrete Pavement
Applicable Projects:
CDOT construction projects with PCCP
Approval Authority:
CDOT Standards and Specifications Unit
Referenced Document:
Department’s Field Materials Manual
Referenced Standard:
AASHTO Standard Recommended Practice R-11
Payment Basis:
Incentive and Disincentive Payments (I/DP) based on Pay Factors (PF) and Quality Levels (QL)
Effective Use:
Mandatory as written without modification on specified projects
Note:
Year
MGP Number:
GP10.1
Qualifying Criteria:
Answer the following questions by checking the appropriate box for the choice that describes the equipment for which you are applying for a permit.
Year:
2016
Region / city:
United States
Subject:
Tuberculosis (TB) Data Collection
Document Type:
Information Collection Request
Organization:
Centers for Disease Control and Prevention (CDC)
Author:
Mitchell Yakrus, MS, MPH
Target Audience:
Tuberculosis Public Health Laboratories Supervisors
Period of Action:
2016
Approval Date:
September 23rd, 2016
Date of Changes:
Not specified
Contextual Description:
A public health document describing the procedures for collecting data from Tuberculosis Public Health Laboratories in the United States.
Note:
Year
Subject:
Organic Certification Process
Document Type:
Organic System Plan
Agency / Institution:
Pro-Cert
Target Audience:
Organic producers and farmers
Validity Period:
Annual
Note:
Year
Topic:
Organic Certification
Document Type:
Annual Update Form
Author:
Pro-Cert
Target Audience:
Organic Producers
Period of Validity:
Annual
Note:
Year
Document Type:
Appendix
Target Audience:
COR Applicants
Note:
Year