№ files_lp_4_process_3_130957
File format: docx
Character count: 80527
File size: 127 KB
This is an official solicitation for bids related to the re-bid of seeding and erosion services by the SC Forestry Commission, detailing submission requirements, deadlines, and related procedures.
Year:
2026
Region / City:
South Carolina
Theme:
Government Procurement
Document Type:
Invitation for Bid
Organization / Institution:
SC Forestry Commission
Author:
Jennifer Coleman
Target Audience:
Suppliers and Contractors
Period of Validity:
Until 02/11/2026
Approval Date:
01/13/2026
Amendment Date:
02/12/2026
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / City:
South Carolina
Topic:
Procurement, Bidding
Document Type:
Solicitation
Organization:
SC Vocational Rehabilitation Department
Author:
N/A
Target Audience:
Vendors, Contractors
Period of Action:
Until 10/26/2023
Approval Date:
10/13/2023
Amendment Date:
10/19/2023
Year:
2024
Location:
Winder, GA / Jefferson, GA
Topic:
Sports Event / Tournament
Document Type:
Event Schedule
Organizing Body:
Titan Sports
Audience:
Coaches, Players, Spectators
Period of Validity:
2024
Approval Date:
N/A
Revision Date:
N/A
Document Code:
SP01030
Section:
01030 – Seeding
Year:
2021
Jurisdiction:
Oregon
Region:
United States
Organization:
Oregon Department of Transportation (ODOT)
Document Type:
Technical Specification / Special Provisions
Subject:
Seeding, seed mixes, mulch, fertilizer, weed control, and application rates
Applicable Projects:
Transportation and roadside construction projects
Bidding Applicability Date:
04-01-2021
Last Updated:
12-24-2020
Related Specification:
Section 01040 (Soil Testing)
Contributors Referenced:
Erosion Control Designer, ODOT Technical Resource, State Specifications Engineer
Content Elements:
Pure Live Seed calculation, seed labeling, seed mix formulas, mulch requirements, fertilizer specifications, weed control, measurement and payment provisions
Year:
2023
Region / City:
Oregon
Topic:
Grant-making, Social Justice, Community Empowerment
Document Type:
Presentation
Organization:
Seeding Justice
Author:
Jody Marshall, Angelie Kebede, Kathleen Saelor
Target Audience:
Nonprofit organizations, community organizers, grassroots groups
Validity Period:
Fall 2023
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Jackson, MI
Topic:
Erosion control, landscaping, concrete pad installation
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jack McCloughan
Target Audience:
Contractors
Project Period:
September 18, 2024 - November 27, 2024
Approval Date:
July 18, 2024
Amendment Date:
Not specified
Year:
2020
Region / City:
Wisconsin
Topic:
Erosion Control, Sediment Inspection
Document Type:
Inspection Report
Organization / Institution:
Wisconsin Department of Transportation
Author:
Not specified
Target Audience:
Project Engineers, Inspectors, Contractors
Period of Validity:
Not specified
Approval Date:
02/2020
Date of Changes:
Not specified
Year:
2023
Region / City:
Florida
Theme:
Environmental Protection, Erosion Control
Document Type:
Guidelines
Agency / Institution:
Florida Department of Environmental Protection
Author:
Florida Department of Environmental Protection
Target Audience:
Developers, Construction Contractors, Environmental Engineers
Period of Action:
During construction phase
Approval Date:
N/A
Date of Amendments:
N/A
Year:
2021
Region / City:
Raleigh, North Carolina
Topic:
Soil Erosion and Sedimentation Control
Document Type:
Local Ordinance
Organization / Institution:
Sedimentation Control Commission
Author:
Sedimentation Control Commission
Target Audience:
Local governments, developers, landowners
Effective Date:
November 2021
Note:
Year
Year:
2024
Region / City:
Florida, USA
Type of Document:
Construction Specification / Regulatory Guidance
Governing Body:
Florida Department of Transportation (FDOT)
Reference:
Applicant Handbook Vol. I, Section 11.2; NPDES CGP 62-621.300(4), F.A.C.
Scope:
Erosion and Sediment Control Plans for construction sites exceeding 1 acre
Related Manuals:
FDOT Construction Project Administration Manual (CPAM) Section 8.2
Audience:
Contractors performing FDOT projects
Project Requirements:
Site-specific Erosion and Sediment Control (E&SC) Plan, compliance with water quality standards, adherence to BMPs
Year:
2016
Region / City:
Auckland
Topic:
Erosion and Sediment Control
Document Type:
Guideline
Organization:
Auckland Council
Author:
Auckland Council
Target Audience:
Developers, Consultants, Contractors, Government staff
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Context
Year:
2020
Region / City:
MIMAROPA, Marinduque, Sta. Cruz
Topic:
Disaster Response, Soil Erosion, Road Slip, Assistance
Document Type:
Report
Organization:
DSWD-FO MIMAROPA
Author:
Marie Joyce G. Rafanan, Marc Leo L. Butac
Target Audience:
Government Agencies, Relief Organizations, Affected Families
Period of Effectiveness:
01 July 2020 – Ongoing
Date of Approval:
21 July 2020
Date of Changes:
None
Context:
A situational report detailing the response to a road slip caused by soil erosion in Sta. Cruz, Marinduque, and the assistance provided to affected families.
Year:
2026
Region / City:
Huntsville, AL, USA
Topic:
Gas-particle interaction modeling for planetary surface interaction simulations
Document Type:
Research Paper
Institution:
NASA Marshall Space Flight Center
Author:
Jeff West, Peter Liever
Target Audience:
Aerospace engineers, researchers in fluid dynamics, space exploration scientists
Period of Application:
Ongoing research
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / City:
Minnesota, USA
Subject:
Erosion control and turf establishment
Document Type:
Construction specification
Agency:
Office of Environmental Stewardship, Erosion Control and Storm Water Management Unit
Materials:
Seed, sod, mulch, geotextile fabric, hydraulic and rolled erosion control products, riprap, poly sheeting
Procedures:
Temporary soil covers, permanent vegetative cover, seeding, sodding, mulching, erosion control blankets, hydro-seeding
Seeding Periods:
April 1 – October 20 depending on mixture
Sodding Periods:
April 15 – November 1 depending on type
Environmental Considerations:
Areas of Environmental Sensitivity (AES), proximity to surface water
Seasonal Instructions:
Winter dormant operations, spring snowmelt protection
Year:
2000
Region / city:
United States
Topic:
Wind erosion, soil conservation, agricultural modeling
Document Type:
Article
Organization / Institution:
Journal of Soil and Water Conservation
Author:
D.W. Fryrear, J.D. Bilbro, A. Saleh, H. Schomberg, J.E. Stout, T.M. Zobeck
Target Audience:
Researchers, soil scientists, agricultural engineers
Period of Validity:
N/A
Date of Approval:
June 2000
Date of Changes:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Geomorphology, Rivers
Document Type:
Educational Text
Author:
Not specified
Target Audience:
General public, students
Effective Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
United States
Subject:
Erosion control, hydraulic application, soil stabilization
Document Type:
Technical specification
Organization / Agency:
U.S. Department of Transportation or associated civil engineering authority
Target Audience:
Contractors, applicators, engineers
Material Coverage:
Hydraulic Tackifiers, Organic Fiber Matrix, Bonded Fiber Matrix, Reinforced Fiber Matrix
Performance Duration:
3–12 months depending on product type
Application Requirements:
Mechanical agitation and slurry bypass equipment
Safety and Environmental Compliance:
EPA and OSHA standards, non-toxic, biodegradable, non-corrosive
Testing Standards:
ASTM D7367, ASTM D422, ASTM D4444
Certification Required:
Applicator’s Certification from manufacturer for specific tackifiers
Moisture Content Limits:
Maximum 15% at delivery
Particle Size Standards:
Specific sieve retention percentages per product type
Curing Time:
2–48 hours depending on product
Year:
2012
Region / City:
Pennsylvania, USA
Document Type:
Environmental Management Plan
Topic:
Road Maintenance and Erosion Control
Responsible Organization:
Pennsylvania Department of Environmental Protection
Author:
Not specified
Target Audience:
Contractors and municipal road maintenance staff
Project Start Date:
Not specified
Project End Date:
Not specified
Included Practices:
ESPC BMPs, ESM practices, permanent and temporary stabilization measures
Reference Materials:
Penn State Agronomy Guide, Pennsylvania DEP ESPC Program Manual, PA DOT Pub 408
Soil Information:
Includes hydric soil assessment and limitations
Maintenance Requirements:
Weekly inspection, sediment removal, stabilization enforcement