№ files_lp_3_process_7_058681
File format: docx
Character count: 11983
File size: 41 KB
This document is the official programme for the ASLE-UKI Biennial Conference 2025 held at the University of Galway, detailing session topics, speakers, and timings.
Date:
Wednesday 13th August 2025
Time:
08:30 – 21:00 Irish time (IST/ GMT +1)
Venue:
Áras na MacLéinn, University of Galway
Year:
2025
Region / City:
Galway
Topic:
Conference
Document Type:
Programme
Organizing Body:
ASLE-UKI
Author:
Not specified
Target Audience:
Academics, students, and researchers in environmental and cultural studies
Period of validity:
August 13th, 2025
Approval Date:
Not specified
Modification Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2024
Region / City:
Jackson, MI
Topic:
Erosion control, landscaping, concrete pad installation
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Jackson County Parks
Author:
Jack McCloughan
Target Audience:
Contractors
Project Period:
September 18, 2024 - November 27, 2024
Approval Date:
July 18, 2024
Amendment Date:
Not specified
Year:
2020
Region / City:
Wisconsin
Topic:
Erosion Control, Sediment Inspection
Document Type:
Inspection Report
Organization / Institution:
Wisconsin Department of Transportation
Author:
Not specified
Target Audience:
Project Engineers, Inspectors, Contractors
Period of Validity:
Not specified
Approval Date:
02/2020
Date of Changes:
Not specified
Year:
2023
Region / City:
Florida
Theme:
Environmental Protection, Erosion Control
Document Type:
Guidelines
Agency / Institution:
Florida Department of Environmental Protection
Author:
Florida Department of Environmental Protection
Target Audience:
Developers, Construction Contractors, Environmental Engineers
Period of Action:
During construction phase
Approval Date:
N/A
Date of Amendments:
N/A
Year:
2021
Region / City:
Raleigh, North Carolina
Topic:
Soil Erosion and Sedimentation Control
Document Type:
Local Ordinance
Organization / Institution:
Sedimentation Control Commission
Author:
Sedimentation Control Commission
Target Audience:
Local governments, developers, landowners
Effective Date:
November 2021
Note:
Year
Year:
2024
Region / City:
Florida, USA
Type of Document:
Construction Specification / Regulatory Guidance
Governing Body:
Florida Department of Transportation (FDOT)
Reference:
Applicant Handbook Vol. I, Section 11.2; NPDES CGP 62-621.300(4), F.A.C.
Scope:
Erosion and Sediment Control Plans for construction sites exceeding 1 acre
Related Manuals:
FDOT Construction Project Administration Manual (CPAM) Section 8.2
Audience:
Contractors performing FDOT projects
Project Requirements:
Site-specific Erosion and Sediment Control (E&SC) Plan, compliance with water quality standards, adherence to BMPs
Year:
2016
Region / City:
Auckland
Topic:
Erosion and Sediment Control
Document Type:
Guideline
Organization:
Auckland Council
Author:
Auckland Council
Target Audience:
Developers, Consultants, Contractors, Government staff
Period of validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Context
Year:
2020
Region / City:
MIMAROPA, Marinduque, Sta. Cruz
Topic:
Disaster Response, Soil Erosion, Road Slip, Assistance
Document Type:
Report
Organization:
DSWD-FO MIMAROPA
Author:
Marie Joyce G. Rafanan, Marc Leo L. Butac
Target Audience:
Government Agencies, Relief Organizations, Affected Families
Period of Effectiveness:
01 July 2020 – Ongoing
Date of Approval:
21 July 2020
Date of Changes:
None
Context:
A situational report detailing the response to a road slip caused by soil erosion in Sta. Cruz, Marinduque, and the assistance provided to affected families.
Year:
2026
Region / City:
Huntsville, AL, USA
Topic:
Gas-particle interaction modeling for planetary surface interaction simulations
Document Type:
Research Paper
Institution:
NASA Marshall Space Flight Center
Author:
Jeff West, Peter Liever
Target Audience:
Aerospace engineers, researchers in fluid dynamics, space exploration scientists
Period of Application:
Ongoing research
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
Not specified
Region / City:
Minnesota, USA
Subject:
Erosion control and turf establishment
Document Type:
Construction specification
Agency:
Office of Environmental Stewardship, Erosion Control and Storm Water Management Unit
Materials:
Seed, sod, mulch, geotextile fabric, hydraulic and rolled erosion control products, riprap, poly sheeting
Procedures:
Temporary soil covers, permanent vegetative cover, seeding, sodding, mulching, erosion control blankets, hydro-seeding
Seeding Periods:
April 1 – October 20 depending on mixture
Sodding Periods:
April 15 – November 1 depending on type
Environmental Considerations:
Areas of Environmental Sensitivity (AES), proximity to surface water
Seasonal Instructions:
Winter dormant operations, spring snowmelt protection
Year:
2000
Region / city:
United States
Topic:
Wind erosion, soil conservation, agricultural modeling
Document Type:
Article
Organization / Institution:
Journal of Soil and Water Conservation
Author:
D.W. Fryrear, J.D. Bilbro, A. Saleh, H. Schomberg, J.E. Stout, T.M. Zobeck
Target Audience:
Researchers, soil scientists, agricultural engineers
Period of Validity:
N/A
Date of Approval:
June 2000
Date of Changes:
N/A
Year:
Not specified
Region / City:
Not specified
Topic:
Geomorphology, Rivers
Document Type:
Educational Text
Author:
Not specified
Target Audience:
General public, students
Effective Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Region / City:
United States
Subject:
Erosion control, hydraulic application, soil stabilization
Document Type:
Technical specification
Organization / Agency:
U.S. Department of Transportation or associated civil engineering authority
Target Audience:
Contractors, applicators, engineers
Material Coverage:
Hydraulic Tackifiers, Organic Fiber Matrix, Bonded Fiber Matrix, Reinforced Fiber Matrix
Performance Duration:
3–12 months depending on product type
Application Requirements:
Mechanical agitation and slurry bypass equipment
Safety and Environmental Compliance:
EPA and OSHA standards, non-toxic, biodegradable, non-corrosive
Testing Standards:
ASTM D7367, ASTM D422, ASTM D4444
Certification Required:
Applicator’s Certification from manufacturer for specific tackifiers
Moisture Content Limits:
Maximum 15% at delivery
Particle Size Standards:
Specific sieve retention percentages per product type
Curing Time:
2–48 hours depending on product
Year:
2012
Region / City:
Pennsylvania, USA
Document Type:
Environmental Management Plan
Topic:
Road Maintenance and Erosion Control
Responsible Organization:
Pennsylvania Department of Environmental Protection
Author:
Not specified
Target Audience:
Contractors and municipal road maintenance staff
Project Start Date:
Not specified
Project End Date:
Not specified
Included Practices:
ESPC BMPs, ESM practices, permanent and temporary stabilization measures
Reference Materials:
Penn State Agronomy Guide, Pennsylvania DEP ESPC Program Manual, PA DOT Pub 408
Soil Information:
Includes hydric soil assessment and limitations
Maintenance Requirements:
Weekly inspection, sediment removal, stabilization enforcement
Note:
Year ended
Programme:
ERASMUS+
Action:
eTwinning
Document type:
Administrative form
Purpose:
Request for amendments to grant agreements
Issuing body:
Education, Audiovisual and Culture Executive Agency (EACEA)
Target entities:
eTwinning National Support Services (NSS) and Partner Support Agencies (PSA)
Scope of amendments:
Work programme, budget breakdown, legal representative, coordinator, bank account
Relevant grant annexes:
Annex I Description of the Action; Annex III Estimated Budget of the Action
Submission method:
Email submission with signed form and annexes
Approval authority:
EACEA
Language:
English
Year:
2025
Location:
Bor & Malakal, South Sudan
Job Type:
Individual Consultant, Full-Time, Non-Rotational
Duration:
6 Months
Application Deadline:
24 December 2025, 5:00pm SST
Reporting To:
Emergency Coordinator
Sector:
Humanitarian, Sexual and Reproductive Health, Gender-Based Violence
Required Education:
Master’s degree in Public Health, Medicine, Sociology, Demography, Gender, International Relations, International Development, Economics, Public Administration, Management, or related fields
Experience:
Minimum seven years in humanitarian and development programmes, field coordination, programme/project management
Languages:
English (fluency), Arabic (desirable)
Key Responsibilities:
Coordination of sub-national RH technical working group, management of RH/dignity/emergency kits, capacity-building workshops, rapid needs assessments, monitoring and reporting, promotion of psychosocial support, support to donor proposals, transition planning
Competencies:
Integrity, commitment to UN values, cultural diversity, change adaptation, advocacy, partnership building, results delivery, strategic focus, team leadership, professional expertise, analytical and strategic thinking, communication for impact
Target Audience:
Humanitarian programme staff, local health actors, implementing partners
Year:
2013
Region / City:
CEPT
Subject:
Spectrum management
Document Type:
Work Program
Institution:
ECC
Author:
M. Kraemer
Target Audience:
Administrations
Period of validity:
May 2013 – July 2015
Approval Date:
May 2013
Amendment Date:
Not specified
Author:
Sancha Thomas (Principle Social Worker)
Version:
1.0 (published)
Last updated:
November 2021
Purpose:
This document outlines the departmental induction programme for new starters within the Children’s Social Care department at Luton Borough Council.
Year:
2021
Region / City:
Luton
Topic:
Departmental Induction Programme
Document Type:
Internal Training Program
Organization:
Luton Borough Council
Target Audience:
New employees in the Children’s Social Care department
Date of Approval:
November 2021
Date of Changes:
November 2021