№ files_lp_3_process_7_059028
File format: docx
Character count: 20407
File size: 431 KB
This document outlines the steps and requirements for synchronizing product data with the General Administration of Customs of China (GAC), facilitating the customs declaration process and enhancing trade efficiency.
Year:
2019
Region / City:
Global
Subject:
Data synchronization in the context of Chinese import customs declarations
Document Type:
Implementation Guide
Author:
GS1 China, GAC
Target Audience:
Importers, suppliers, manufacturers, and brand owners exporting goods to China
Effective Period:
From July 1, 2018
Approval Date:
August 2019
Revision Date:
September 2019
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Date:
2025-11-03
Note:
Author(s)
Year:
2025
Region / city:
Global
Topic:
Wireless LAN standards
Document type:
Draft specification
Organization / institution:
IEEE
Author:
Multiple authors from different companies
Target audience:
Engineers and researchers in wireless communications
Period of validity:
N/A
Approval date:
N/A
Amendment date:
N/A
Note:
Year
Year:
2025
Note:
Region / City
Topic:
Wireless LANs, NPCA synchronization
Document Type:
Technical standard
Institution:
IEEE
Author:
Seongho Byeon, Salvatore Talarico, Dongju Cha, Zhenpeng Shi, Juseong Moon, Inaki Val, Shubhodeep Adhikari, Matthew Fischer, Ning Gao, Xiaofei Wang, Kaiying Lu
Target Audience:
Engineers, Standards Committee Members, Wireless Communication Researchers
Context:
A technical document that outlines resolutions for comment IDs related to NPCA synchronization mechanisms in wireless LAN standards.
Year:
2016
Note:
Region / City
Theme:
Clock Synchronization
Document Type:
Technical Standard
Organization / Institution:
LXI Consortium
Target Audience:
Developers, Engineers, and Technical Experts
Approval Date:
8 November 2016
Year:
2021
Region / City:
West Lafayette
Topic:
Educational Technology
Document Type:
User Guide
Institution:
Purdue University
Author:
ITAP
Target Audience:
Faculty, Course Administrators
Effective Period:
Not specified
Approval Date:
6/18/2021
Modification Date:
Not specified
Year:
2021
Period:
January 25 – February 5
Organization:
3GPP TSG RAN WG1
Document Type:
Technical report / meeting summary
Source:
Moderator (MediaTek)
Agenda Item:
8.4.3
Audience:
Discussion and Decision participants
Focus:
UL synchronization and GNSS-assisted pre-compensation in IoT NTN
Related Documents:
TR 36.763, TR 38.821, NR NTN agreements
Year:
2020
Note:
Region / city
Topic:
Time and frequency synchronization, NR NTN
Document type:
Meeting agenda
Organization / institution:
3GPP TSG-RAN WG1
Author:
Thales
Target audience:
Participants of 3GPP TSG-RAN WG1
Year:
2020
Event:
TSG-RAN WG1 Meeting #102-e
Topic:
UL time and frequency synchronization for NR NTN
Document type:
Technical contribution / meeting report
Organization:
3GPP
Author:
Thales (moderator)
Contributors:
MediaTek, CATT, Ericsson, InterDigital, CMCC, ZTE, Apple, CAICT, Sony, LG Electronics
Target audience:
3GPP RAN1 working group members
Agenda item:
8.4.2
Sections:
Clarification on UE capability; UL timing synchronization; UL frequency synchronization; Serving satellite ephemeris; References
Scope:
NR NTN Rel-17 solutions
Date of meeting:
August 17–28, 2020
Year:
2026
Region / City:
Malibu, CA
Theme:
Traffic safety, technology, public works
Document type:
Press release
Organization / Institution:
City of Malibu
Author:
Matt Myerhoff
Target audience:
General public, residents, traffic safety advocates
Action date:
February 4, 2026
Date of approval:
January 14, 2026
Date of changes:
N/A
Budget:
$19.1 million
Partners involved:
Caltrans, Los Angeles County
Description:
Press release announcing the completion of a signal synchronization project aimed at improving traffic safety and mobility on Pacific Coast Highway (PCH) in Malibu, part of ongoing efforts to enhance PCH safety.
Year:
2021
Meeting:
3GPP TSG RAN WG1 Meeting #104e
Agenda Item:
8.15.2
Date:
January 25 – February 5, 2021
Source:
Moderator (MediaTek)
Document Number:
R1-210XXXX
Title:
Summary #3 of AI 8.15.2 Enhancements to Time and Frequency Synchronization
Document For:
Discussion and Decision
Study Item:
IoT Non Terrestrial Network (NTN)
Related Work Item:
NR NTN
Referenced Reports:
TR 36.763, TR 38.821
Technical Scope:
Uplink timing advance and frequency synchronization for IoT NTN
Contributing Companies:
ZTE, Huawei, Qualcomm, Spreadtrum, Lenovo, MotoM, CATT, vivo, Nokia, NSB, Ericsson, Xiaomi, MediaTek, Sony, APT, OPPO, Intel, Asia Pacific Telecom, CMCC, Samsung, Apple, Interdigital
Key Topics:
GNSS-based pre-compensation, Doppler shift mitigation, timing advance calculation, RRC states applicability, reuse of NR NTN agreements
Year:
2018
Location:
Lisbon, Portugal
Subject:
5G MFCN spectrum synchronization
Document type:
Plenary contribution / Technical proposal
Organization:
European Communications Committee (ECC), CEPT
Author:
GSA
Intended audience:
ECC PT1 members, national administrations
Date issued:
15 February 2018
Period covered:
27 February – 2 March 2018
References:
ECC Report “Analysis of the suitability of the regulatory technical conditions for 5G MFCN operation in the 3400-3800 MHz band”; CEPT Report A to the European Commission
Year:
2026
Region / City:
Global
Subject:
Data Synchronization, GS1 Standards, GDSN
Document Type:
Guidance / FAQ
Organization / Institution:
Acxion
Author:
Acxion Data Management Team
Target Audience:
Manufacturers, Suppliers, Private Label Suppliers, Third-Party Suppliers
Effective Period:
2026
Approval Date:
2026-03-01
Related Standards:
GS1 Global Data Synchronization Network (GDSN), Global Trade Item Number (GTIN), Global Location Number (GLN), Global Product Classification (GPC)
XML Serialization of Synchronization Knowledge (MS-XSSK) Open Specifications Technical Documentation
Year:
2009–2016
Document Identifier:
MS-XSSK
Subject Area:
Data synchronization; XML data serialization; protocol structures
Document Type:
Technical specification
Organization:
Microsoft
Publisher:
Microsoft
Series:
Microsoft Open Specifications
Initial Release Date:
July 13, 2009
Latest Revision Date:
May 10, 2016
Revision History:
Versions 0.1–2.0 with major, minor, and editorial updates
Technology Domain:
Data portability and synchronization protocols
Format:
XML schema specification
Applicable Technologies:
Synchronization knowledge representation and data replication systems
Related Standards:
XML schema and network programming standards
Intended Audience:
Software developers and system architects implementing synchronization technologies
Year:
2021
Region / City:
Fort Huachuca, AZ
Subject:
Military contracts, construction, and information technology services
Document Type:
Contract Requirement Description
Organization / Institution:
United States Army
Author:
Not specified
Target Audience:
Government contracting entities
Validity Period:
2021-2025 (Projected)
Approval Date:
January 2021
Amendment Date:
None provided
Year:
2015
Region / City:
Asia-Pacific, Kyoto, Japan
Topic:
Network Synchronization Technologies in Radio Access Networks for IMT TDD Systems
Document Type:
Report
Organization / Institution:
APT Wireless Group (AWG)
Author:
APT Wireless Group
Target Audience:
Network engineers, telecommunications professionals, regulators
Period of Action:
Ongoing
Date of Approval:
March 13, 2015
Date of Modifications:
None
Year:
2017
Region / City:
Baghdad
Topic:
Water Infrastructure, Environmental Assessment
Document Type:
Environmental and Social Impact Assessment Report
Organization / Institution:
Baghdad Water Authority
Author:
N/A
Target Audience:
Stakeholders involved in water infrastructure projects, environmental agencies
Duration:
Project Phase
Approval Date:
N/A
Modification Date:
N/A
Year:
2022
Organization:
Department of Veterans Affairs (VA), Office of Information and Technology (OIT)
Document Type:
Installation/Implementation Guide
Version:
5.1
Revision History:
07/07/2005 Initial documentation; 08/05/2005 Updated document 5.01; 08/25/2005 Updated document 5.02; 09/08/2005 Updated document 5.03; 09/22/2005 Revised document to include Checklist; 09/30/2005 Updated document 5.04
Target Audience:
VIST Coordinators, BRC personnel, Blind Rehabilitation Outpatient Specialists (BROS)
Software Requirements:
VistA software, HealtheVet-VistA enterprise architecture
Platform:
Centralized servers
Installation Components:
M Server, Client Workstation, Network communications software, Software dependencies, Data migration, User setup
Related Manuals:
Blind Rehabilitation V.5.1 Technical Manual/Security Guide, Release Notes, User Manual
Security:
Role-based user authentication, Secure Web Access (128 Bit SSL)
Reporting:
Enhanced reporting features, Nationwide centralization of Blind Rehabilitation data, Ad-hoc reporting capabilities
Compliance:
508 regulations, W3C standards
Implementation Period:
Post-August 2022
Meeting:
3GPP TSG-RAN WG4 Meeting #96-e
Document number:
R4-20xxxxx
Agenda item:
7.3.5 & 7.3.6
Source:
Moderator (LG Electronics)
Title:
Email discussion summary for [96e][210] 5G_V2X_NRSL_RRM
Document for:
Information
Date:
17–28 Aug 2020
Working group:
TSG-RAN WG4
Related specifications:
38.133, 36.133
Related change requests:
R4-2010084, R4-2010085, R4-2011380, R4-2011053, R4-2011382, R4-2010037, R4-2010083, R4-2011054, R4-2011379
Companies involved:
LG Electronics, MediaTek, Huawei, HiSilicon, Qualcomm
Topics:
5G V2X NR sidelink RRM core requirements, performance requirements, interruption requirements, measurement accuracy, test cases
Communication format:
Electronic meeting and e-mail discussion
Technical scope:
Interruption to WAN, synchronization scenarios, LTE SL and NR SL switching, measurement accuracy, scheduling availability, test case planning
Date:
13 Aug 2025
Document Type:
Order Confirmation
Supplier:
Enviroclad
Client:
Arctic Installations (SA) Pty Ltd
Client Contact:
Gary Fullwood
Client Address:
1/19 Chamberlain St, Wingfield SA 5013
Prepared By:
Amanda-Jane Burnim
Position:
Office / Production Co-Ordinator
Contact Email:
[email protected]
Contact Phone:
1300 003 009
Items:
Insulated EPS/FR Panels CW 100mm and 150mm, Cut Sheets, Accessories
Total ex GST:
$5,880.48
GST:
$588.05
Total inc GST:
$6,468.53
Lead Time:
2 weeks plus delivery
Delivery Terms:
Adelaide Metro; heavy vehicle access required
Warranty:
Enviroclad Product Warranty on Enviropanel and Envirospan
Terms and Conditions:
Pricing excludes GST unless stated otherwise; client responsible for order verification and site suitability; waiting time charges apply
Confidentiality Notice:
Information confidential and intended for the addressee only
Year:
2024
Region / City:
Upper Marlboro, MD
Topic:
HOA Elections and Communications
Document Type:
Meeting Minutes
Organization / Institution:
Oak Creek Club Homeowners Association
Author:
Pamela Rachal, Yolanda Ricks, Jessica Hill
Target Audience:
Homeowners Association Committee Members, Residents
Effective Period:
2024 Election Cycle
Approval Date:
August 20, 2024
Modification Date:
August 20, 2024