№ lp_2_2_07481
Analytical impact report summarizing projected economic, social, and environmental effects of an 8.5 MW solar power plant project in Rwanda based on quantitative modeling and sectoral assessment.
Date: January 2015
Country: Rwanda
Population: 10.9 million (at time of report)
Project: 8.5 MW solar power plant
Sector: Renewable energy
Installed Capacity Contribution: Approximately 6% of new national generation capacity
Increase in GDP: USD 9.27–10.81 million per year (0.12%–0.14%)
Increase in Employment: 50 direct long-term jobs; 4,900–5,800 indirect jobs
Households Electrified: 15,000–18,000 households
Time Savings from Biomass Collection: 10.95–13.29 million hours per year
Additional Annual Income from Time Reallocation: USD 834,000–1.79 million
GHG Emissions Reduction: 7,500–8,400 tons CO2e per year
Wood Savings: 12,500–15,000 m3 per year
Environmental Assessment: ESIA study conducted
Methodology Reference: International Labor Office of the United Nations, Assessing Green Jobs Potential in Developing Countries
Beneficiary Institutions: ASYV orphanage; Arava Institute renewable energy internship program
Document Type: Socioeconomic and environmental impact summary report
Thematic Focus: Economic growth, employment, electrification, social welfare, environmental impact
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.