№ lp_1_2_38758
File format: docx
Character count: 12639
File size: 113 KB
Formal annex to a Danish technical guide defining mandatory technical documentation and compliance declarations required for connecting Type B power-generating plants to the low-voltage public electricity grid.
Document type:
Technical annex
Document category:
Grid connection documentation
Version:
1.3
Date:
November 2022
Original publication date:
27 April 2018
Date of latest update:
18 November 2022
Applicable standard:
EN 50549-1
Voltage level:
Low-voltage grid (≤1 kV)
Plant type:
Type B power-generating plants
Energy technologies covered:
Synchronous generation, power park modules, inverter-based generation
Responsible entity:
Distribution System Operator (DSO)
Geographical scope:
Denmark
Intended use:
Submission of technical data prior to commissioning
Language:
English
Technical reference standards:
DS/EN 60034 series, DS/CLC/TR 60034-16-3
Regulatory context:
Connection requirements for public electricity supply grid
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Document type:
Annex
Version:
1.4
Version date:
20-02-2025
Original language:
English
Related standard:
EN 50549-1
Grid code:
DK grid codes
Voltage level:
Low-voltage grid (≤1 kV)
Plant type:
Type A power-generating plants
Primary energy sources:
Wind, Solar, Other
Responsible organization:
Distribution System Operator (DSO)
Geographical scope:
Denmark
Date of first version:
27-04-2018
Change history included:
Yes
Approval status reference:
Positive list
Commissioning data required:
Yes
Signature requirement:
Yes
Regulatory context:
Grid connection requirements and technical compliance documentation
Year:
2022
Note:
Region / city
Topic:
Connection of power generating plants
Document type:
Technical guide
Target audience:
Power generating plant operators, DSO
Context:
A technical guide outlining the required documentation for connecting Type A power-generating plants to low-voltage grids, including protection settings and compliance with standards.
Document type:
Annex
Version:
1.4
Version date:
20-02-2025
Original language:
English
Related standard:
EN 50549-1
Grid code:
DK grid codes
Voltage level:
Low-voltage grid (≤1 kV)
Plant type:
Type A power-generating plants
Primary energy sources:
Wind, Solar, Other
Responsible organization:
Distribution System Operator (DSO)
Geographical scope:
Denmark
Date of first version:
27-04-2018
Change history included:
Yes
Approval status reference:
Positive list
Commissioning data required:
Yes
Signature requirement:
Yes
Regulatory context:
Grid connection requirements and technical compliance documentation
Note:
Year
Subject:
Electrical installations
Document Type:
Specification
Target Audience:
Contractors, Electrical Engineers
Contextual Description:
This document specifies the requirements for the installation and testing of low-voltage electrical power conductors and cables for electrical systems rated 600V and below, including related materials, standards, and procedures.
Year:
2016
Region / City:
United States
Topic:
Electrical Equipment, Transformers
Document Type:
Technical Specification
Organization / Institution:
The American Institute of Architects (AIA)
Author:
The American Institute of Architects (AIA)
Target Audience:
Engineers, Architects, Contractors
Validity Period:
N/A
Approval Date:
2016
Amendment Date:
N/A
Year:
2012
Region / City:
Botswana
Topic:
Electrical engineering
Document Type:
Notification
Agency:
Botswana WTO-TBT Enquiry Point
Author:
Botswana Bureau of Standards
Target Audience:
Industry professionals, standardization bodies, regulatory authorities
Period of validity:
Not specified
Date of adoption:
To be determined
Date of entry into force:
12 months from publication
Final date for comments:
Two months from circulation
Relevant documents:
IEC 60068-2-2:2007, IEC 60068-2-11:1981, IEC 60068-2-30:2005, IEC 60073:2002, IEC 60085:2007, IEC 60364 (all parts), IEC 60364-4-41:2005, IEC 60364-4-41:2005/AMD1:2017, IEC 60364-5-51:2005, IEC 60364-5-52:2009, IEC 60439 (all parts), IEC 60439 series, IEC 61439 series, IEC 60445:2017, IEC 60447:2004, IEC 60529:1989, IEC 60529 (1989)
Objective and rationale:
National security requirements; Consumer information, labelling; Prevention of deceptive practices and consumer protection; Protection of human health or safety; Protection of the environment; Quality requirements; Harmonization
Description:
IEC 61439-3:2012 outlines the requirements for low-voltage distribution boards (DBOs) operated by ordinary persons, providing technical revisions and aligning with IEC 61439-1:2011.
Year:
2010
Region / City:
Europe
Theme:
Grid Computing, Infrastructure, e-Science
Document Type:
Policy
Organization / Institution:
EGI-InSPIRE
Author:
David Kelsey
Target Audience:
Researchers, Site Administrators, Grid Operators
Approval Date:
13/07/2010
Approval Body:
EGI-InSPIRE
Modification Date:
N/A
Date of Document:
13/07/2010
Version:
1.0
Policy Group:
Security Policy Group
Contact Person:
David Kelsey, STFC, UK
Date:
13/07/2010
Version:
1.0
Policy Group Acronym:
SPG
Policy Group Name:
Security Policy Group
Document Status:
Submitted
Contact Person:
David Kelsey/STFC, UK
Approved By:
Body who approved the doc
Approved Date:
13/07/2010
Copyright notice:
Copyright © Members of the EGI-InSPIRE Collaboration, 2010. See www.egi.eu
Note:
for details of the EGI-InSPIRE project and the collaboration.
Project:
EGI-InSPIRE
License:
Creative Commons Attribution-Noncommercial 3.0 License
Document Log:
Imported from JSPG policy document with the same title.
Project Summary:
The EGI-InSPIRE project aims to support the transition to a sustainable pan-European e-Infrastructure for research, coordinating high-performance and high-throughput computing resources, and integrating new Distributed Computing Infrastructures.
Year:
2023
Subject:
Mathematics
Grade:
7
Topics:
Triangles and quadrilaterals, Length and area
Type of document:
Task notification
Author:
Not specified
Institution:
Not specified
Target audience:
Students (Year 7)
Period of validity:
2023 school year
Date of approval:
Not specified
Date of last revision:
Not specified
Year:
Not specified
Region / City:
Not specified
Theme:
Substance Use Disorder Education
Document Type:
Instructional Guide
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
CDCA Preliminary Applicants
Period of Validity:
13 months
Approval Date:
Not specified
Date of Changes:
Not specified
Contextual Description:
Instructional guide for completing an education grid for individuals applying for CDCA Preliminary Certificates in the field of substance use disorder education.
Year:
2022
Note:
Region / city
Topic:
Connection of power generating plants
Document type:
Technical guide
Target audience:
Power generating plant operators, DSO
Context:
A technical guide outlining the required documentation for connecting Type A power-generating plants to low-voltage grids, including protection settings and compliance with standards.
Year:
2023
Region / City:
Ohio
Topic:
Chemical Dependency Counseling
Document Type:
Instructions
Organization / Institution:
Ohio Counselor, Social Worker and Marriage and Family Therapist Board
Author:
Ohio Counselor, Social Worker and Marriage and Family Therapist Board
Target Audience:
CDCA applicants for renewal
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2010
Region / City:
EU
Topic:
User-level job accounting, data protection
Document Type:
Policy
Organization / Institution:
EGI-InSPIRE
Author:
David Kelsey
Target Audience:
Site Managers, VO Resource Managers, Grid Operations personnel
Period of Validity:
From 13/07/2010
Approval Date:
13/07/2010
Year:
2021
Region / City:
New England
Topic:
Economic Study, Grid Reliability
Document Type:
Memo
Organization / Institution:
ISO New England Inc.
Author:
Carissa Sedlacek, David Cavanaugh, William Fowler, Robert Stein
Target Audience:
NEPOOL Participants, ISO New England staff, Stakeholders in grid reliability
Effective Period:
March 12, 2021
Approval Date:
March 12, 2021
Description:
Request for a study to assess the future reliability of the grid and its economic implications.
Year:
2024–2027
Location:
Town of Cohasset, Massachusetts, USA
Document type:
Memorandum of Understanding
Parties:
Town of Cohasset, National Grid USA Service Company, Inc.
Purpose:
Energy efficiency and sustainability collaboration
Scope:
Municipal buildings, multifamily, small business, large commercial and industrial, residential, transportation electrification
Goals:
Energy savings targets, incentives, electrification projects
Program:
Mass Save Energy Efficiency programs
Effective date:
January 1, 2024
End date:
December 31, 2027
Year:
2010
Region / city:
Europe
Topic:
Grid Security, Traceability, Logging
Document type:
Policy
Organization / institution:
EGI-InSPIRE Collaboration
Author:
David Kelsey
Target audience:
Researchers, Grid administrators, Security officers
Period of validity:
Indefinite
Approval date:
13/07/2010
Document status:
Submitted
Year:
2010
Region / City:
Europe
Topic:
Grid Security
Document Type:
Policy
Organization / Institution:
EGI-InSPIRE
Author:
David Kelsey
Target Audience:
Grid participants and researchers using or managing Grid services and resources
Approval Date:
14/07/2010
Amendment Date:
None stated
Year:
2026
Region / City:
Massachusetts
Topic:
Grid Modernization, Electric Distribution System Planning
Document Type:
Workplan
Institution:
Grid Modernization Advisory Council (GMAC)
Author:
Not specified
Target Audience:
Stakeholders, Electric Distribution Companies (EDCs), Department of Public Utilities (DPU), municipalities
Period of Effectiveness:
2026
Approval Date:
Not specified
Revision Date:
Not specified
Year:
2026
Region / City:
Massachusetts
Theme:
Grid Modernization, Electric Distribution System Planning
Document Type:
Workplan
Organization / Institution:
Grid Modernization Advisory Council (GMAC)
Author:
Not specified
Target Audience:
Electric distribution companies (EDCs), Department of Public Utilities (DPU), stakeholders in ESMP-related activities, municipalities
Period of Action:
2026
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Jurisdiction:
Massachusetts
Subject:
Electric grid modernization and distribution system planning
Document type:
Work plan
Governing framework:
An Act Driving Clean Energy and Offshore Wind
Council:
Grid Modernization Advisory Council
Related agencies:
Department of Public Utilities; Electric Distribution Companies
Policy area:
Energy policy; climate and decarbonization
Planning horizon referenced:
2025–2029 ESMPs; forecasts through 2050
Date references:
November 20, 2023; August 29, 2024; June 13, 2025
Purpose:
Annual planning of GMAC activities and collaboration
Stakeholders:
Utilities, regulators, municipalities, sector representatives
Scope:
Review and advisory role on Electric Sector Modernization Plans
Source type:
Government advisory council planning document