№ lp_1_15364
File format: docx
Character count: 58954
File size: 2995 KB
This document outlines the general requirements and instructions for creating a Post-Construction Operation and Maintenance (O&M) Manual for stormwater management systems in compliance with NYC regulations.
Note:
Year
Subject:
Stormwater Management
Document Type:
Manual
Organization / Institution:
New York City Department of Environmental Protection
Author:
NYC Department of Environmental Protection
Target Audience:
Professionals in environmental management, urban planning, construction
Period of Validity:
Indefinite
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2018
Region / City:
North Central Texas
Topic:
Stormwater Management
Document Type:
Ordinance Template
Agency:
North Central Texas Council of Governments (NCTCOG)
Author:
NCTCOG
Target Audience:
Local Governments, City Authorities
Period of Validity:
Not specified
Approval Date:
September 28, 2018
Modification Date:
Not specified
Document Type:
Guidance document
Subject:
Post-Construction Stormwater Control Plans (SWCP)
Issuing Body:
Central Coast Water Quality Control Board
Applicable Requirements:
Post-Construction Stormwater Management Requirements (PCRs)
Performance Requirements:
No. 2 – Water Quality Treatment; No. 3 – Runoff Retention; No. 4 – Peak Management
Geographic Scope:
Central Coast region
Intended Audience:
Project applicants and municipal representatives
Sections:
Documentation of Applicable Requirements; General Project Data; Site Assessment; Applied Stormwater Control Measures; Operations and Maintenance Protocols; Summary and Certification
Referenced Frameworks:
TMDL Wasteload Allocation Attainment Plan; Watershed Management Zones; Designated Groundwater Basin; Approved Urban Sustainability Area
Regulatory Context:
Compliance with PCRs building block structure including Performance Requirement No. 1 – Site Design and Runoff Reduction
Year:
20xx
Region / City:
Ontario
Theme:
Energy, Commercial Operation
Document Type:
Contractual Form
Organization / Institution:
IESO
Author:
Not specified
Target Audience:
Supplier, Buyer
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / City:
Ethiopia
Theme:
Human Capital, Education, Health, Nutrition, Crisis Response
Document Type:
Stakeholder Engagement Plan
Organization / Institution:
Ministry of Finance, Government of Ethiopia
Author:
Ministry of Finance
Target Audience:
Project stakeholders, including government agencies, NGOs, private sector, and affected communities
Period of Validity:
April 2023 - ongoing
Approval Date:
April 2023
Date of Amendments:
Not specified
Year:
[date]
Region / City:
Windsor, California
Topic:
Stormwater Management, LID BMP Maintenance
Document Type:
Operational and Maintenance Plan
Institution:
Town of Windsor Public Works Department
Author:
[Preparer’s Name]
Target Audience:
Property Owners, Homeowners Associations
Period of Validity:
Ongoing
Approval Date:
[date]
Revision Date:
[revision date]
Year:
2023-24
Region / City:
Banjara Hills, Hyderabad
Topic:
Tender Notice
Document Type:
Official Circular
Organization:
Southern Power Distribution Company of T.S. Ltd.
Author:
Superintending Engineer, Operation Banjara Hills
Target Audience:
Contractors registered with TSSPDCL or similar entities
Period of Validity:
Until 21/09/2023
Approval Date:
06/09/2023
Amendment Date:
None
Context:
Official tender notice from TSSPDCL inviting sealed bids for multiple works under the Banjara Hills Circle, including construction, replacement, and supply contracts.
Note:
Year
Region / City:
Alaska
Theme:
Pre-elementary school regulations, safety and compliance
Document Type:
Assurance document
Organization / Institution:
Alaska Department of Education & Early Development
Author:
Alaska Department of Education & Early Development
Target Audience:
Pre-elementary school administrators and staff
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2026
Note:
Region / city
Subject:
Wireless LANs, UHR Operation
Document type:
Technical Submission
Organization / institution:
IEEE
Author:
Ming Gan, Jason Yuchen Guo, Yunbo Li, Guogang Huang, Lan Peng, Zhenguo Du, Steven Qi Wang, Yue Zhao, Zhenpeng Shi, Maolin Zhang
Contextual description:
Technical submission outlining editorial resolutions for comments on TGbn LB291 related to UHR operation elements in the IEEE 802.11 standard draft.
Year:
2025
Jurisdiction:
Texas, United States
Subject:
Criminal justice information systems operations and access
Document type:
Operational manual
Issuing body:
Texas Department of Public Safety
Systems covered:
Texas Crime Information Center; Texas Law Enforcement Telecommunications System; National Crime Information Center; Nlets
Bureau:
Compliance and Training Bureau
Access level:
Sensitive but unclassified
Intended audience:
Law enforcement agencies and criminal justice administrators
Effective date:
January 1, 2025
Contact information:
[email protected]
Year:
2025
Region / City:
Reston, VA, 20190
Topic:
Wireless Networking, NPCA Operation
Document Type:
Technical Proposal
Author:
Serhat Erkucuk, Jeongki Kim, Leonardo Lanante, Jiayi Zhang, Javier Perez-Ramirez, Mrugen Deshmukh, Roya Doostnejad, Safi Hoque
Target Audience:
Engineers, Technicians, Standards Committees
Period of Effectiveness:
Not specified
Approval Date:
2025-07-29
Date of Changes:
Not specified
Year:
2023
Region / City:
Vantharumoolai, Batticaloa
Subject:
Construction of Overhead Water Tank with Pump House in Faculty of Agriculture
Document Type:
Bidding Document
Organization / Institution:
Eastern University Sri Lanka
Author:
Eastern University Sri Lanka
Target Audience:
Bidders for the construction project
Period of validity:
N/A
Approval Date:
N/A
Date of last revision:
N/A
Year:
2026
Region / City:
Manitoba
Subject:
Scissor lift operation safety
Document Type:
Safety Procedure
Organization:
Manitoba Workplace Safety and Health
Author:
Not specified
Target Audience:
Workers and supervisors using scissor lifts
Period of Validity:
Ongoing
Approval Date:
Not specified
Revision Date:
Not specified
Hazards:
Falls from height, tip-over hazards, crushing/pinch points, electrical hazards, collision risks, falling objects, ground conditions, overhead obstacles, weather conditions, equipment failure, access/egress risks, entrapment
Required PPE:
Full-body harness, lanyard, hard hat, steel-toed safety boots, high-visibility vest, safety glasses, work gloves, weather protection, warning signs/barriers, communication device, emergency descent kit, first aid kit
Training Requirements:
Scissor lift certification, fall protection training, equipment inspection, emergency procedures, ground assessment, weather limitations, hand signals, first aid/CPR
Restrictions:
Operation without training, bypassing safety devices, exceeding load limits, using as crane, riding on rails, modifications, working alone, operation in high winds
Emergency Procedures:
Remain calm, lower platform if safe, contact supervisor, call emergency services, implement rescue plan, secure area, document incident, review procedures
Weather Restrictions:
Wind speed limits, lightning proximity, rain/snow conditions, temperature range, ice formation, visibility minimum
Operating Limitations:
Maximum wind speed, platform capacity, working height, ground slope, weather conditions, visibility requirements, load distribution, travel speed
Guidance Documents/Standards:
Manitoba Workplace Safety and Health Regulation M. R. 217/2006, Company Policies, Manufacturer’s Manual, Pre-use Checklist
Note:
Year
Subject:
Organic certification and handling procedures
Document Type:
Organic certification questionnaire
Organization:
ACO (Australian Certified Organic)
Author:
ACO
Target Audience:
Organic operators
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2024
Location:
Hefei, Anhui, China
Topic:
NR duplex evolution, Sub-band Full Duplex (SBFD)
Document type:
Meeting report / Summary
Organization:
3GPP TSG-RAN WG4
Author:
Moderator (Samsung)
Intended audience:
RAN working group participants
Agenda item:
6.20.4
Meeting number:
112bis
Frequency range:
FR1 and FR2-1
Related work items:
RP-234035, RP-240789, R4-2413514
Year:
2018
Region / City:
Chichester
Subject:
Mechanical services installation
Document Type:
Operating and Maintenance Manual
Organization:
Paine Manwaring Ltd
Author:
James Cannom
Target Audience:
Building users, managers, and maintenance personnel
Period of Validity:
Indefinite
Approval Date:
20th February 2018
Amendment History:
20th February 2018
Note:
Year
Theme:
Permeable Pavement Systems, Inspection, and Maintenance
Document Type:
Operation & Maintenance Plan
Agency / Organization:
[Organization Name]
Author:
[Author Name]
Target Audience:
Departments responsible for maintenance and operation of permeable pavements
Effective Period:
From the completion of the project construction
Year:
Not specified
Region / city:
United States
Subject:
Prototype development and research agreement
Document type:
Agreement
Organization / institution:
United States Special Operations Command (USSOCOM)
Author:
Not specified
Target audience:
Government, contractors, researchers, performers
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Reference number:
RFB 3024/2024
Document type:
Bid specification annexure
Procuring entity:
South African Police Service (SAPS)
Implementing agency:
State Information Technology Agency (SITA)
Country:
South Africa
Year:
2024
Subject matter:
Procurement of F5 load balancers and related services
Products covered:
F5 VELOS hardware, software, licenses and add-ons
Services included:
Maintenance, support and professional services
Service period:
Five years (60 months)
Scope of work:
Supply, design, installation, configuration and support of load balancing and application security solutions
Delivery locations:
SITA Centurion, SITA Beta, Pretoria
Evaluation framework:
Mandatory administrative, technical and contractual evaluation stages
Related annexes:
Annex A (Bidder substantiating evidence), Annex B (Addendum 1)
Year:
2013
Region / city:
United States
Topic:
IT Support and Maintenance for Healthcare Systems
Document Type:
Request for Information (RFI)
Agency / Institution:
Department of Veterans Affairs
Author:
Candice Capelli
Target Audience:
Contractors and vendors for IT services
Period of validity:
Until contract award
Approval date:
March 2010
Modification date:
Not provided
Year:
2013
Region / City:
Long Beach, CA
Topic:
Maintenance and repair of medical equipment
Document Type:
Cooperative Agreement
Agency:
Department of Veterans Affairs
Author:
Not specified
Target Audience:
Contractors, healthcare system providers
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified