№ files_lp_3_process_9_32471
File format: docx
Character count: 14788
File size: 450 KB
Regulatory ordinance and technical amendment guidance outlining changes to floodplain management standards and building code requirements for Coastal A Zones under the 6th Edition Florida Building Code, including elevation criteria and application of coastal high hazard area provisions.
Year:
2017
Jurisdiction:
Florida
Subject:
Floodplain management and coastal construction standards
Document Type:
Ordinance amendment and technical code guidance
Regulatory Framework:
Florida Building Code (FBC), ASCE 24-14, ASCE 7, NFIP
Issuing Context:
Implementation of 6th Edition Florida Building Code
Related Agency:
Federal Emergency Management Agency (FEMA)
Geographic Scope:
Coastal flood hazard areas and Coastal A Zones
Key Provisions:
Application of Zone V standards within Coastal A Zones; minimum elevation requirement of BFE + 1 foot; delineation of LiMWA; amendments to FBC Building and FBC Residential
Alternatives Presented:
Alternative A (LiMWA-based designation); Alternative B (community-designated Coastal A Zone)
Affected Structures:
New buildings, manufactured homes, residential structures in flood hazard areas
Effective Period:
Upon adoption of the 6th Edition FBC (mid-2017)
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
n/a
Region / City:
n/a
Subject:
Project Management
Document Type:
Business Case
Author:
Department of Finance Supply Division
Target Audience:
n/a
Period of Validity:
n/a
Approval Date:
n/a
Date of Amendments:
n/a
Year:
2020
Region / City:
Florida
Topic:
Building Code, Plumbing
Document Type:
Supplement
Organization / Institution:
Florida Building Code
Author:
Florida Building Commission
Target Audience:
Professionals in building and plumbing sectors
Period of validity:
Until the adoption of the next edition
Approval Date:
Not specified
Date of Changes:
2020, 2023
Note:
Year
Year:
2023
Region / City:
Wales
Topic:
Healthcare, Radiology
Document Type:
Report
Organization / Institution:
NHS Wales
Author:
Alexandra Simmonds, Gareth Westlake
Target Audience:
NHS staff, Health Board members, healthcare professionals
Effective Period:
2023–2025
Approval Date:
May 2023
Modification Date:
Not specified
Year:
2017
Region / City:
Florida
Topic:
Building Code, Wind Loads, Roof Diaphragms
Document Type:
Proposed Revision
Organization / Institution:
Florida Building Code
Author:
Lisa Pate, FRSA
Target Audience:
Building professionals, contractors, architects
Effective Period:
2017
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Contextual Description
Year:
2017
Region / City:
Florida
Topic:
Building Code, Structural Engineering
Document Type:
Comment
Agency / Institution:
Florida Building Code Advisory Board
Author:
Lisa Pate, FRSA
Target Audience:
Building professionals, code officials
Period of Validity:
2017 and onward
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2022
Region / City:
United States
Topic:
Floodplain development permitting
Document Type:
Guide
Agency / Institution:
FEMA
Author:
FEMA Emergency Management Institute
Target Audience:
Communities participating in the National Flood Insurance Program (NFIP)
Period of Effect:
Ongoing
Approval Date:
10/24/2022
Year:
2020
Region / City:
California
Topic:
Floodplain Management, Building Codes
Document Type:
Ordinance
Institution:
Local Government
Author:
Not specified
Target Audience:
Local Governments, Urban Planners, Building Authorities
Period of Action:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2026
Region / city:
Milton, FL
Subject:
Floodplain management, stormwater, infrastructure improvement
Document type:
Public notice
Agency / organization:
City of Milton
Author:
City of Milton
Target audience:
Public, governmental entities
Period of validity:
Ongoing
Approval date:
January 14, 2026
Date of amendments:
Not specified
Note:
Year
Region / City:
Burlington
Subject:
Floodplain Development Permit Procedure
Document Type:
Permit Application Form
Organization / Institution:
City of Burlington
Target Audience:
Property Developers, Contractors, Engineers, Applicants
Note:
Year
Topic:
Floodplain management, ordinance
Document Type:
Ordinance
Authority / Organization:
Eddy County Commission, North Dakota
Year:
2020
Region / City:
Massachusetts
Topic:
Floodplain Management
Document Type:
Bylaws
Institution:
Federal Emergency Management Agency (FEMA)
Target Audience:
Local Government Officials, Community Planners
Validity Period:
Ongoing
Approval Date:
May 28, 1971
Amendment Date:
Not specified
Note:
Year
Region / City:
Henrico County
Subject:
Floodplain management, flood zone mapping, floodplain regulations
Document Type:
Review document
Agency / Organization:
Henrico County
Target Audience:
Developers, engineers, planners, property owners
Note:
Year
Theme:
Floodplain Management
Document Type:
Executive Order
Year:
2023
Region / City:
{community}
Topic:
Floodplain Management
Document Type:
Ordinance
Author:
FEMA, DCR
Target Audience:
Municipalities, Local Authorities
Effective Date:
[specific date required]
Date of Approval:
[specific date required]
Amendment Date:
[specific date required]
Year:
2017
Region / City:
Florida
Topic:
Floodplain Management
Document Type:
Ordinance
Authority:
Community Governing Body
Author:
Not specified
Target Audience:
Local government officials and community planners
Period of validity:
Ongoing
Approval Date:
April 3, 2017
Amendment Date:
Not specified
Note:
Year
Contextual description of the document:
Framework for assessing environmental impacts, designed for the Victorian Murray Floodplain Restoration Project and applied to the Vinifera, Nyah, and Burra Creek Floodplain Restoration Projects.
Year:
2019
Region / City:
Florida
Topic:
Non-Profit Status, Floodplain Management
Document Type:
Policies Manual
Organization / Institution:
Florida Floodplain Managers Association (FFMA)
Author:
Florida Floodplain Managers Association
Target Audience:
FFMA Board Members, Floodplain Management Community
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
California
Theme:
Floodplain Management
Document Type:
Ordinance
Organization / Institution:
State of California
Author:
Not specified
Target Audience:
Local government bodies and staff involved in flood management
Effective Period:
Ongoing, subject to updates
Approval Date:
Not specified
Date of Amendments:
Not specified
Security classification:
Government
Date of review of security classification:
January 2023
Authority:
Queensland Reconstruction Authority
Document status:
Final
Version:
1.0
QRA Reference:
DOC/23/1983
Date of approval:
21 February 2023