№ files_lp_4_process_1_33631
Detailed technical checklist outlining mandatory requirements for sewer line construction, including approvals, permits, fees, engineering standards, and as-built submission procedures for compliance with the town’s wastewater management plan.
Year: 2015
Location: Grafton, Massachusetts, USA
Subject: Sewer system construction requirements
Document type: Technical guideline / checklist
Issuing authority: Town of Grafton Board of Sewer Commissioners
Author: Town of Grafton Sewer Department
Intended audience: Engineers, contractors, property owners
Applicable period: From August 2015 until superseded
Approval date: August 2015
Connection fees: $5,000 per residential unit, $7,500 minimum per commercial/industrial unit
Permit requirements: Sewer Extension / Connection Permit, Road Opening Permit, Order of Conditions from Conservation Commission
Construction standards: Compliance with Town of Grafton contract No. 16 and detail sheets
Inspection and testing: Required by Sewer Department, fees charged to owner
As-built submission: Electronic and Mylar plans by registered professional engineer
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.