№ lp_1_29465
Government directive–based technical requirements defining readiness, reliability, downtime, cost metrics, and reporting obligations for contractor-supported systems under after-warranty sustainment.
Organization: U.S. Customs and Border Protection
Directive: Cost-Wise Readiness (CWR) Directive 5225-03
Subject: System readiness, sustainment, and performance metrics
Document type: Technical and contractual requirements specification
Scope: After-warranty maintenance, repair, and logistic support
Key metrics: Materiel Availability, Materiel Reliability, Mean Downtime, Total Ownership Cost
Minimum availability requirement (systems): ≥ 95%
Minimum availability requirement (software/IT): ≥ 98%
Minimum reliability requirement: MTBF ≥ 1,000 hours
Maximum mean downtime: ≤ 24 hours
Reporting frequency: Monthly
Intended audience: Contractors providing system sustainment services
Lifecycle coverage: From placement into operational service through end of service life
Source type: Government directive-based performance requirements for contractor sustainment obligations
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.