№ files_lp_4_process_1_22009
File format: docx
Character count: 2991
File size: 62 KB
Official federal price list detailing awarded special item numbers, pricing, ordering procedures, delivery terms, and contractor information for GIS and IT services under a multiple award schedule.
Year:
2023
Region / City:
Houston, TX, USA
Subject:
Federal Supply Schedule, GIS Services, IT Professional Services
Document Type:
Price List
Organization / Institution:
General Services Administration, Federal Supply Service
Contractor:
Texas Boom Company LLC
Contract Administrator:
Rick Mowrer
Business Size:
Small
Contract Number:
47QSWA22D0002
Contract Period:
October 5, 2021 – October 4, 2026
Price List Effective Date:
July 25, 2023
Geographic Coverage:
50 states, DC, and Puerto Rico
Maximum Order:
$250,000 per SIN
Minimum Order:
$100
Discounts:
Net Government Prices, Quantity discounts up to 26%
Delivery Terms:
30 DARO, expedited and overnight delivery available
F.O.B.:
Origin
Warranty:
Standard commercial warranty
SAM Registration:
Active, UEI N4JRVKW9NWE1
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Organization:
Williston Boom Fastpitch
Associated organization:
Williston Parks and Recreation District
Document type:
Player and parent agreement
Sport:
Competitive fastpitch softball
Level of play:
Travel softball
Target audience:
Players and parents or guardians
Geographic reference:
Williston
Participation requirements:
Practice attendance, conduct standards, financial obligations
Disciplinary framework:
Progressive discipline up to dismissal
Grievance procedure:
Written complaint with mandatory 24-hour waiting period
Financial terms:
Registration fees, uniforms, fundraising, sponsorships
Code of conduct:
Player behavior standards on and off the field
Agreement scope:
Playing time, practices, games, conduct, dismissal, grievances, finances
Year:
2016
Region / City:
Paris, Brussels, Mumbai
Topic:
Terrorism, Emergency Response, Public Safety
Document Type:
Strategic Planning Guide
Agency / Institution:
Harvard University
Author:
Brian Kyes, Brian McHale, Paul Ames, John Giancaspro, Rich Serino
Target Audience:
Public Safety Officials, Emergency Responders, Community Leaders
Effective Period:
Ongoing
Approval Date:
N/A
Date of Last Revision:
N/A
Year:
2021
Region / City:
Batavia, NY
Topic:
Government Procurement, Equipment Purchase
Document Type:
Notice of Intent to Sole Source
Agency / Institution:
Department of Veterans Affairs Network Contracting Office 2
Author:
Duane Philgence
Target Audience:
Contractors, Suppliers, Vendors
Period of Effectiveness:
Until August 25, 2021
Approval Date:
Not specified
Date of Changes:
Not specified
Note:
Agency
Year:
2023
Region / City:
N/A
Theme:
Safety Standards for Aerial Boom Lifts
Document Type:
Quiz
Organization:
N/A
Author:
N/A
Target Audience:
Aerial Boom Lift Operators, Safety Trainers
Effective Period:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Title of dance:
Boom, Boom, Boom
Count:
32
Wall:
0
Level:
Not specified
Choreographers:
Mary Heagren-Gibbs (AUS); Justine Shuttleworth (AUS)
Music:
Boom, Boom, Boom — Cam Fletcher
Dance type:
Line dance
Structure:
32-count sequence with repeat
Step notation:
Numbered counts with directional and turning instructions
Country of choreographers:
Australia
Intended use:
Dance instruction and practice
Year:
2026
Region / City:
Australia
Theme:
Line dance choreography
Document type:
Dance notation
Choreographer:
Mary Heagren-Gibbs & Justine Shuttleworth
Music:
Boom, Boom, Boom – Cam Fletcher
Level:
Beginner / Intermediate
Step count:
32
Target audience:
Dance instructors and enthusiasts
Performance context:
Social and instructional dance settings
Year:
1910
Region / City:
Nevada, United States
Theme:
Mining history, economic development
Document type:
Historical account
Institution / Organization:
Central Nevada Historical Society
Author:
Not specified
Key figures:
George Wingfield, Nick Abelman, George S. Nixon, Wyatt Earp, Virgil Earp
Events described:
Goldfield mining boom, labor strikes, stock market manipulation
Economic context:
Mining claim consolidation, stock market speculation, labor disputes
Period covered:
Early 20th century
Significant dates:
Wyatt Earp arrival 1902, Virgil Earp arrival 1904, Federal troop deployment December 7, 1907
Associated locations:
Goldfield, Reno, Esmeralda County, Nevada
Year:
2023
Region / City:
Jurupa Valley, California
Topic:
Economic development subsidies, transient occupancy tax, development agreements
Document Type:
Statement of information
Organization / Institution:
City of Jurupa Valley
Author:
Not specified
Target Audience:
General public, stakeholders involved in the development project
Period of Validity:
2023-2043
Approval Date:
September 7, 2023
Amendment Date:
Not specified
Contextual Description:
A statement detailing the economic development subsidies for the proposed development agreement related to the District at Jurupa Valley, including information on public funding, job creation, and tax revenue projections.
Year:
Not specified
Region / City:
Not specified
Subject:
Software Licensing Agreement
Document Type:
Legal Agreement
Organization / Institution:
Schrödinger, L.L.C.
Author:
Schrödinger, L.L.C.
Target Audience:
Licensee, Users
Effective Period:
3 years
Approval Date:
Not specified
Amendment Date:
Not specified
License Type:
Not specified
Year:
2021
Region / City:
California, Arizona
Topic:
Energy Transmission, Public Utilities
Document Type:
Decision
Organization / Institution:
California Public Utilities Commission
Author:
California Public Utilities Commission
Target Audience:
Stakeholders in energy infrastructure and transmission
Effective Period:
N/A
Approval Date:
November 4, 2021
Date of Changes:
N/A
Year:
2020
Region / city:
Vallejo, California
Topic:
Appeal, transportation regulation, settlement
Document type:
Resolution
Organization / institution:
California Public Utilities Commission
Author:
Administrative Law Judge Division
Target audience:
Transportation carriers, legal professionals, regulatory authorities
Period of validity:
2020-2021
Date of approval:
June 18, 2020
Date of amendments:
N/A
Year:
2025
Region / City:
La Grande
Topic:
Housing Development Code Amendments
Document Type:
Memorandum
Organization / Institution:
Cascadia Partners, LLC
Author:
Jamin Kimmell, Lydia Ness, Finley Heeb
Target Audience:
City of La Grande City Council, Planning Commission
Effective Period:
From August 18, 2025
Approval Date:
August 18, 2025
Date of Revisions:
None
Note:
Year Founded
Publication date:
September 12, 2024
Organization:
Swindoll, Janzen, Hawk & Loyd, LLC
Abbreviation:
SJHL
Location:
Manhattan, Kansas, United States
Industry:
Accounting
Award:
Accounting Today’s Best Accounting Firms to Work For
Awarding organization:
Accounting Today
Survey partner:
Best Companies Group
Geographic scope:
United States
Evaluation methodology:
Workplace policies review and employee survey
Number of awarded firms:
100
Eligibility requirements:
U.S.-based accounting firm with at least 15 employees and minimum one year in operation
Document type:
Press release
Year:
2025
Region / City:
Saint Paul, Minnesota
Subject:
Licensing Compliance, Health and Community-Based Services
Document Type:
Correction Order
Organization / Institution:
Department of Human Services (DHS)
Author:
Adesola Uchegbu
Target Audience:
License holders and service providers for home and community-based services
Effective Period:
Immediate corrective action required
Approval Date:
June 27, 2025
Date of Amendments:
N/A
Document type:
Agreement
Parties:
MRA Systems, LLC (Middle River Aerostructure Systems) and Supplier
Industry:
Aerospace manufacturing
Subject:
Delegated supplier product release and quality responsibilities
Applicable standards:
AS9117, AS13001, AS13100, SS1182, MRAS M1000, MRAS M1002
Delegated role:
Delegated Quality Representative (DQR)
Governing organization:
MRA Systems, LLC
Scope:
Material and services purchased by MRAS
Status:
Contractual document upon signature
Revision history:
Initial release; subsequent revisions A and B
Approval authorities:
MRAS Quality, MRAS Supplier Quality, Supplier management
Geographic context:
United States
Year:
2026
Region / City:
St. Louis, MO, USA
Topic:
Plumbing, Copper Piping Systems
Document Type:
Manufacturer’s Guide Specification
Organization:
Cerro Flow Products LLC, Plumbing Division
Contact:
P.O. Box 66800, St. Louis, MO 63166-6800, www.cerro.com
, P:
888-237-7611 / 618-337-6000
Standards Referenced:
ASTM B88, ANSI, ASME, CSA, IPC, IMC, MSS, NSF International
Target Audience:
Qualified design professionals, engineers, and contractors
Materials:
Copper and copper alloy piping, fittings, press-connect and soldered joints
Piping Types:
Type K, L, M copper tubing
Applications:
Domestic water systems, plumbing, water distribution
Installation Notes:
Color coding for tube types, annealed and drawn tempers, compatibility with press-connect and brazed fittings
Related Sections:
Building Information Modeling, Fire-Suppression Piping, Expansion Fittings, Sleeves, Escutcheons, Meters and Gauges, Hangers and Supports, Vibration and Seismic Controls, Water Pumps, Swimming Pool and Fountain Piping, Hydronic Piping, Earth Moving
Year:
2023
Region / City:
Port Arthur, Jefferson County, Texas
Topic:
Environmental Regulations, Air Quality Permitting
Document Type:
Official Correspondence
Organization:
Texas Commission on Environmental Quality (TCEQ)
Author:
Samuel Short, Deputy Director, Air Permits Division
Target Audience:
U.S. Environmental Protection Agency (EPA), Oxbow Calcining LLC, Environmental Managers
Period of Validity:
Not specified
Approval Date:
February 3, 2023
Amendment Date:
Not specified