№ files_lp_4_process_2_69810
File format: docx
Character count: 7106
File size: 1040 KB
Field study protocol and data collection source detailing sampling methods and experimental design for analyzing the impact of trail disturbance on the density and distribution of Myrtle Spurge along Dry Creek Trail.
Year:
2026
Location:
Dry Creek Trail, Salt Lake City, Utah, USA
Subject:
Ecology, Invasive Species, Population Density
Document Type:
Field Study Protocol / Data Collection Agenda
Organization:
Salt Lake Center for Science Education (SLCSE)
Author:
SLCSE Ecology Department
Target Audience:
High school or undergraduate ecology students
Period of Activity:
Single-day field trip
Date of Document:
March 2026
Key Species:
Euphorbia myrsinites (Myrtle Spurge)
Experimental Method:
Quadrat sampling, transect lines
Variables:
Independent – distance from trail; Dependent – Myrtle Spurge cover
Control:
None
Trials:
3
Constants:
Quadrat size, transect spacing, sampling timing, location
Environmental Factors Recorded:
Temperature, wind, cloud cover, elevation, light levels, vegetation type
Purpose:
Assess effect of ecosystem disturbance on invasive species distribution
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
Banjarbaru, South Kalimantan
Theme:
Functional food, business feasibility, antioxidants
Document type:
Research paper
Organization:
Lambung Mangkurat University
Author:
A Nugroho, H Heryani, W T Istikowati
Target Audience:
Researchers, health industry professionals, entrepreneurs in food and agriculture
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2024
Note:
Region / City
Topic:
Stormwater Management
Document Type:
Template
Organization / Institution:
CDOT
Target Audience:
Contractors, Engineers, Project Managers
Description:
Template for developing a Stormwater Management Plan for construction sites with less than one acre of disturbance, focusing on stormwater controls and environmental compliance.
Year:
2019
Region:
North America
Topic:
Geomagnetic Disturbance Data Reporting
Document Type:
Instruction Manual (Draft)
Organization:
North American Electric Reliability Corporation (NERC)
Target Audience:
Transmission Owners, Generator Owners, NERC Entities
Effective Period:
Beginning May 2013 for historical events, ongoing for future events
Approval Date:
August 2018 (NERC Board of Trustees)
Implementation Start Date:
October 1, 2020
Data Types:
GIC data, Geomagnetic field data
Reporting Frequency:
Annual or as designated by NERC
Regulatory Reference:
Section 1600 of NERC Rules of Procedure, FERC Order No. 830
Year:
2019
Region / City:
Texas
Topic:
Geomagnetic Disturbance (GMD) Modeling
Document Type:
Procedure Manual
Organization / Institution:
PGDTF
Author:
PGDTF
Target Audience:
Transmission System Operators, Market Participants
Period of Validity:
Ongoing, reviewed periodically
Approval Date:
02/26/2019
Revision Date:
02/26/2019
Year:
Not specified
Region / city:
Not specified
Topic:
Environmental Protection, Construction Site Management
Document Type:
Draft / Technical Requirement
Authority / Organization:
Not specified
Author:
Not specified
Target Audience:
Dischargers, Construction Site Operators
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2026
Region / City:
United States
Topic:
Environmental regulation
Document Type:
Official guideline
Organization / Institution:
State Water Board
Author:
Not specified
Target Audience:
Construction companies, legal and environmental professionals
Validity Period:
Ongoing as per General Permit regulations
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2019
Time period covered:
September–December 2019
Document status:
Draft
Document type:
Data reporting instructions
Subject:
Geomagnetic disturbance data reporting
System:
Geomagnetic Disturbance Data System
Organization:
North American Electric Reliability Corporation
Regulatory framework:
NERC Rules of Procedure Section 1600
Related authority:
Federal Energy Regulatory Commission
Reporting entities:
Transmission Owners and Generator Owners
Geographic scope:
North America
Data types covered:
Geomagnetically-induced current data; geomagnetic field data
Intended users:
Registered NERC entities required to report GMD data
Publication context:
Notional guidance for future data collection
Note:
Audit ID
Year:
2024
Region / city:
North America
Topic:
Reliability Standard Compliance
Document Type:
Audit Worksheet
Organization:
NERC
Author:
Compliance Enforcement Authority
Target Audience:
Auditors, Compliance Enforcement Authorities, Registered Entities
Effective Period:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2006
Region / city:
United States
Subject:
Disturbance Monitoring Equipment Installation and Data Reporting
Document Type:
Compliance Questionnaire
Organ / institution:
NERC (North American Electric Reliability Corporation)
Author:
NERC
Target Audience:
Registered Entities, Compliance Enforcement Authority
Validity Period:
From 2006 onwards
Approval Date:
8/2/2006
Amendment Date:
Not specified
Year:
2027
Region / City:
United States
Topic:
Electric Power Emergency Reporting
Document Type:
Form
Agency / Institution:
U.S. Department of Energy (DOE)
Author:
U.S. Department of Energy
Target Audience:
Electric power industry entities (Balancing Authorities, Reliability Coordinators, Electric Utilities, etc.)
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
State:
Oklahoma
Demonstration name:
Institutions for Mental Diseases Waiver for Serious Mental Illness/Substance Use Disorder
Approval period for section 1115 demonstration:
12/22/2020-12/31/2025
SMI/SED demonstration start date:
12/22/2020
Implementation date of SMI/SED demonstration:
12/22/2020
SMI/SED demonstration goals and objectives:
Reduced utilization of emergency departments; Reduced preventable readmissions to acute care hospitals and residential settings; Improved availability of crisis stabilization services; Improved access to community-based services; Improved care coordination
SMI/SED demonstration year and quarter:
DY1 Q2
Reporting period:
04/01/2021 - 06/30/2021
Medicaid expansion start date:
07/01/2021
Managed care implementation status:
On hold pending legislative authority
Behavioral Health Homes sunset date:
09/30/2021
Certified Community Behavioral Health Clinics (CCBHCs) certified this period:
1
Total new CMHCs achieving CCBHC status since waiver submission:
4
State agency:
Oklahoma Department of Mental Health and Substance Abuse Services (ODMHSAS)
Relevant national initiatives:
988 crisis response number
Year:
2022
Region / City:
California
Subject:
Environmental Protection, Stormwater Management, Construction
Document Type:
Government Order
Organization / Institution:
State Water Resources Control Board
Author:
State Water Resources Control Board
Target Audience:
Dischargers involved in construction and land disturbance activities
Effective Date:
July 1, 2023
Expiration Date:
August 31, 2028
Approval Date:
XXXX XX, 202X
Amendment Date:
September 1, 2023
Year:
2023
Region / City:
United States
Topic:
Environmental Regulation, Water Quality
Document Type:
Legal/Regulatory
Organization:
United States Environmental Protection Agency (EPA)
Author:
Environmental Protection Agency
Target Audience:
Construction companies, Environmental professionals, Government agencies
Effective Period:
Ongoing
Approval Date:
N/A
Amendment Date:
N/A
Year:
202X
Region / City:
California
Subject:
Stormwater Discharges, Construction, Land Disturbance
Document Type:
Permit
Agency / Institution:
State Water Resources Control Board
Author:
State Water Resources Control Board
Target Audience:
Construction site operators, governmental bodies
Period of validity:
From July 1, 2023, to June 30, 2028
Approval Date:
XXXX XX, 20XX
Amendment Date:
XXXX XX, 20XX