№ files_lp_4_process_1_30648
File format: docx
Character count: 14714
File size: 214 KB
Detailed requirements for metering installation and connection point registration are outlined in accordance with the NER, focusing on technical assessments, registration processes, and metering accuracy standards.
Note:
Year
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
Global
Topic:
Transboundary river research, Natural Language Processing, Named Entity Recognition, Python
Document type:
Research methodology
Organization / Institution:
None mentioned
Author:
Sahana et al.
Target audience:
Researchers in the field of natural language processing and transboundary river studies
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2006
Region / City:
Strasbourg
Topic:
Human Rights, European Court of Human Rights
Document Type:
Judgment
Institution:
European Court of Human Rights
Author:
European Court of Human Rights
Target Audience:
Legal professionals, human rights practitioners
Period of Validity:
Not specified
Date of Approval:
18 October 2006
Date of Amendments:
None
Court:
European Court of Human Rights
Formation:
Grand Chamber
Case number:
46410/99
Parties:
Ziya Üner v. the Netherlands
Respondent State:
Kingdom of the Netherlands
Applicant nationality:
Turkish
Subject matter:
Alleged violation of Article 8 of the Convention (right to respect for private and family life)
Related provisions:
Article 3, Article 6, Article 14 of the Convention; Articles 2 and 4 of Protocol No. 7
Procedural history:
Application lodged on 4 August 1998; referred to the Grand Chamber on 30 November 2005
Date of judgment:
18 October 2006
Place of judgment:
Strasbourg
Representation of applicant:
Mr R. Dhalganjansing
Agent of the Government:
Mrs J. Schukking
Intervening third party:
German Government
Deliberations:
5 April and 30 August 2006
Document ID:
MSP_TPL_0001
Document Name:
MSP Application Form
Issue:
7.0
Reason for Issue:
Issue Released for Baseline 49.0
Effective Date:
March 1, 2023
Document Change History:
1.0 – For publication – 02/18/2000; 2.0 – For Metering Service Provider Final Registration – 01/11/2002; 3.0 – Issue Released for Baseline 13.1 – June 1, 2005; 4.0 – Issue Released for Baseline 31.0 – March 5, 2014; 5.0 – Issue Released for Baseline 35.1 – June 1, 2016; 6.0 – Issue Released for Baseline 44.1 – December 2, 2020; 7.0 – Issue Released for Baseline 49.0 – March 1, 2023
Related Documents:
MDP_PRO_0007 – Market Manual 3: Part 3.1: Metering Service Provider (MSP) Registration, Revocation and De-registration; IMO_AGR_0012 – Metering Service Provider Agreement; MDP_RUL_0002 – Market Rules for the Ontario Electricity Market
Organization:
Independent Electricity System Operator (IESO)
Type:
Application Form
Scope:
Wholesale Electricity Market, Ontario
Confidentiality:
Confidential
Date:
16 July 2025
Issue Resolution Proposal:
CRP666
Issues Log ID:
TS1637
Issue Title:
Changes to GBCS & CHTS to Support VW Relay and & CADg
Source:
SMIP
Date Raised:
22 February 2024
Status:
Draft v0_2
Documentation Reference:
GBCS v4.3, CHTS v1.6
Description:
Addressing the changes required to support Internet based WAN communications using Virtual WAN Relay functionality on the HAN in the GBCS and CHTS specs.
Proposed Implementation and Preamble:
On 12 December 2023 SMIP issued a consultation on proposals to establish arrangements whereby communications with Smart Metering Systems installed in premises with no Wide Area Network could be established via the DCC using the internet and the consumer’s broadband. On 24 October 2024 we published a consultation response reflecting the substantial support for the proposals. Upon completion of that consultation, we instructed DCC to produce an SEC Variation Test Approach Document on 24 November, which enabled DCC to formally engage in the necessary development. The solution proposed relies on the use of the consumer’s broadband and consequently requires the consent of the consumer for it to be implemented. In addition, it requires additional device functionality to be installed at the premises, this is to be provided either from a separate device or incorporated into another device such as a PPMID or CAD. That Device will be referred to as the Virtual WAN Device (VWD). DCC have accommodating the changes to WAN provision that are required to implement the proposals. This includes the provision of a Virtual Wan Provider (VWP), some modest changes to DSP but without any DUIS or schema affecting changes and the creation of a CH variant known as the Virtual WAN CH (VWCH), accommodating the Virtual WAN message relay functionality. As per the December 23 consultation, the current use case for Virtual WAN message relay is No WAN areas. The VWCH will be processing Commands that have originated from the internet, via the VWP and a VWD. Virtual WAN message relay is enabled once the VWD is present in the VWCH Device Log, the enablement at installation will be via an automatic Device Command from the VWD. Currently there are no plans for service users to enable the VWD to join with the VWCH, via a service request, hence no DUIS Schema changes are proposed, such that suppliers’ current operational systems and processes are intended to remain unaffected. A design principle for the initiative is to minimise change to deliver a VW message relay as soon as possible. As such functionality that requires significant DCC change such as new Service Requests has been deliberately avoided. For a new installation in a No WAN situation, the VWD will ‘pair’ and ‘join’ with the VWCH automatically as part of the I&C activity. Whilst there is currently no service request as such, DCC will be able to determine whether a VWD is operating in ‘VW Mode’ (i.e., connecting via the VWP rather than though the CSP WAN), or not. Whilst the method for doing this remains outside of the GBCS / CHTS, the intention is to make this information available to service users, which might be appropriate to suppliers following a CoS event. The method involved will be discussed in the Virtual WAN Interface Specification. This CRP sets out the proposed changes to both CHTS and GBCS.
Year:
2024
Region / City:
Blantyre, Malawi
Theme:
Water and Sanitation
Document Type:
Environmental and Social Management Plan
Organization / Institution:
Blantyre Water Board
Author:
Blantyre Water Board
Target Audience:
Government Officials, Public Health Authorities, Local Communities
Period of Effect:
2024-2029
Approval Date:
February 2024
Date of Amendments:
N/A
Year:
2019
Region / City:
Ontario
Topic:
Electrical Metering Standards
Document Type:
Guide
Organization:
Hydro One Remotes
Author:
Hydro One Remotes
Target Audience:
Customers, consultants, electrical contractors
Period of Validity:
Not specified
Approval Date:
December 14, 2019
Date of Amendments:
Not specified
Year:
2023
Region / city:
Great Britain
Topic:
Smart Metering, Energy
Document Type:
Technical Specification
Organization / Institution:
DLMS User Association, ZigBee Alliance
Author:
Not specified
Target audience:
Industry professionals, technical experts in energy metering
Period of validity:
Not specified
Approval Date:
November 2023
Date of amendments:
Not specified
Document type:
Frequently Asked Questions
City:
Balch Springs
Subject:
Digital water meters
Technology:
Advanced Metering Infrastructure (AMI)
Vendor:
Sensus
Implementing authority:
City Council of Balch Springs
Utility department:
Utilities Department
Funding source:
City Capital Improvement Project funds
Installation period:
October 2018 – April 2019
Installation hours:
8:00 am – 5:00 PM, Monday through Friday
Meter data transmission:
Encrypted radio frequency network
Regulatory compliance:
Federal Communications Commission regulations
Customer cost:
No additional charge for meter installation
Contact phone:
972-286-4477
Year:
2026
Region / City:
Douglas County, Washington
Subject:
Advanced Metering Infrastructure (AMI) proposal
Document Type:
Request for Proposal (RFP)
Organization / Institution:
Douglas PUD
Author:
Not specified
Target Audience:
Vendors, Contractors, Technology Providers
Period of Action:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Year:
2023
Region / City:
Tasmania
Subject:
Electrical Work Request
Document Type:
Form
Organization:
Hydro Tasmania
Author:
Momentum Energy
Target Audience:
Customers requesting electrical connection, metering change, or service alteration
Period of validity:
N/A
Approval Date:
N/A
Modification Date:
N/A
Year:
2021
Region / City:
California
Topic:
Clean Energy, Net Energy Metering, Solar Energy
Document Type:
Letter
Organization:
Coalition for San Francisco Neighborhoods
Author:
Mari Eliza
Target Audience:
California Board of Supervisors, California Public Utilities Commission, Governor Gavin Newsom
Action Requested:
Resolution support for Net Energy Metering policy
Period of Validity:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Year
Topic:
Gas installation
Document Type:
Form
Target Audience:
Organisations requesting gas meter installation
Context Description:
Request form for authorisation to install and seal a gas meter regulator and associated safety devices.
Year:
2023
Region / City:
UBC
Theme:
Energy Monitoring, Commissioning
Document Type:
Technical Guidelines
Organization / Institution:
UBC
Author:
UBC Operations and Energy Team
Target Audience:
UBC project managers, MBCx consultants, design and construction teams
Effective Period:
Ongoing
Approval Date:
N/A
Date of Changes:
N/A
Version:
2.1
Date:
27 November 2025
Author:
DCC
Classification:
DCC PUBLIC
Proposer:
Emslie Law of OVO
Modification Raised:
11 February 2025
Impact Assessment Type:
Preliminary Impact Assessment (As Is DSP)
Related Modification:
SECMP0121
Associated Documents:
DP281-Modification-Report-v0.2 (SECAS); Business Requirements (DCC); Preliminary Impact Assessment, Future DSP Platform (DCC)
Impacted Party:
As Is Data Service Provider (DSP)
Subject:
Transfer and storage of Install Codes and SMKI Device and Organisation Certificates
Scope:
SMETS2 Devices including Communications Hubs and Electricity Smart Metering Equipment
Governance Body:
Change Board
Estimated ROM Cost:
£350,000–£550,000 up to end of Pre-Integration Testing
Full Impact Assessment Cost:
£26,370
Full Impact Assessment Timescale:
40 Working Days
Service Elements Affected:
Smart Metering Inventory (SMI); Service Management Portal; SRV12.2 Device Pre-notification; DCC Total System
Year:
July 2015
Country:
United States
Issuing Organization:
U.S. Department of Energy
Program:
Federal Energy Management Program
Legal Authority:
42 U.S.C. § 8253(e)(3)
Subject:
Federal building energy metering implementation
Document Type:
Government guidance template
Scope:
Federal agencies and sub-agencies
Planning Period:
Five-year metering plan
Contact Person:
Saralyn Bunch
Contact Position:
Energy Technology Program Specialist
Location:
Washington, DC
Required Elements:
Prioritization and locations; milestones and timelines; funding and personnel; energy tracking systems; IT and cyber security barriers; implementation barriers; concurrence signatures
Year:
2026
Region / City:
United Kingdom
Topic:
Transmission Connection Asset Charging
Document Type:
Consultation Response Proforma
Organ / Institution:
NESO
Author:
Not specified
Target Audience:
Industry parties
Period of validity:
Until 18 February 2026
Approval Date:
Not specified
Date of Changes:
Not specified