№ files_lp_3_process_9_45912
File format: docx
Character count: 79254
File size: 1448 KB
Year:
2023
Region / City:
Imperial County, California
Topic:
Workforce Development, Economic Development, Lithium Valley
Document Type:
Request for Proposals (RFP)
Agency:
Imperial County Workforce Development Board
Author:
Imperial County Workforce Development Board
Target Audience:
Potential Proposers, Firms, Organizations, Institutions
Period of Effect:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Region / City:
United States of America & Canada
Document Type:
Warranty Terms
Product:
PYTES Lithium Iron Phosphate Battery HV48100
Author / Issuer:
PYTES Energy, Inc.
Warranty Period:
10 years or 6000 cycles, 90% DOD@77°F/25°C
Installation Requirement:
Must be installed by PYTES certified installers according to HV48100 User Manual
Coverage:
Manufacturing defects in materials and workmanship
Exclusions:
Misuse, unauthorized modifications, environmental damage, normal wear and tear, theft
Governing Law:
USA
Document Format:
Legal / Technical
Year:
2023
Region / City:
BLMK
Topic:
Lithium Shared Care Guidelines
Document Type:
Guideline
Organization / Institution:
BLMK Area Prescribing Committee, East London Foundation Trust, Central and Northwest London NHS Trust
Author:
Not specified
Target Audience:
Primary Care Prescribers
Effective Period:
2023-2026
Approval Date:
September 2023
Review Date:
September 2026
Date of Changes:
Not specified
Note:
Year
Context:
The document provides a detailed declaration for shipping lithium cells and batteries, including applicable regulations and procedures for handling damaged or defective batteries in compliance with IATA standards.
Authors:
Xinhui Chen; Zhaohuai Li; Yan Li; Chunli Shen; Cheng Zhou; Xingnian Tan; Kaijian Yan; Ge Zhang; Xu Xu
Affiliation:
State Key Laboratory of Advanced Technology for Materials Synthesis and Processing, International School of Materials Science and Engineering, Wuhan University of Technology, Wuhan 430070, Hubei, P. R. China
Corresponding author:
Xu Xu
E-mail:
[email protected]
Author contributions:
X. C. and Z. L. contributed equally to this work
Type of document:
Supporting Information
Field:
Materials Science; Electrochemistry; Lithium Metal Batteries
Materials:
ZIF-8; ZIF-8@ZIF-67 core-shell polyhedrons; Carbon Nanotube Interwoven Polyhedrons (CNIP)
Methods:
Sample preparation; XRD; SEM; TEM; HRTEM; XPS; Raman spectroscopy; N2 adsorption-desorption; Electrochemical measurements
Cell configuration:
CR2025 coin-type cells
Electrolyte:
1.0 M lithium bis(trifluoromethanesulfonyl)imide in DOL/DME (1:1 v/v) with 0.1 M LiNO3 additive
Electrode composition:
CNIP (80 wt%), Acetylene Black (10 wt%), PVDF (10 wt%) on Cu foil
Testing systems:
Autolab PGSTAT302N; LAND CT2001A
Figures:
Fig. S1–S16
Tables:
Table S1–S2
Knockeen Trenching and New Assay Sampling Programme to Commence at Leinster Lithium Project, Ireland
Year:
2023
Region / City:
Leinster, Ireland
Theme:
Lithium exploration, Mining
Document Type:
Press Release
Organization:
Technology Minerals Plc, Global Battery Metals Ltd
Author:
Alex Stanbury, Michael Murphy
Target Audience:
Investors, Industry professionals
Period of validity:
Up to two years
Approval Date:
23 November 2023
Amendment Date:
-
Date:
25 January 2023
Company:
Technology Minerals Plc
Stock Exchange:
London Stock Exchange
Ticker:
TM1
Regulatory Framework:
UK Market Abuse Regulation (EU) No. 596/2014
Disclosure Basis:
Article 17 of the UK MAR
Subsidiary:
LRH Resources Limited
Project Name:
Leinster Lithium Property
Location:
South East Ireland, Republic of Ireland
Counties:
Wexford; Kilkenny
Total Licences Held:
23
New Licences Awarded:
7
Licence Commencement Date:
1 December 2022
Initial Licence Duration:
6 years
Total Area Covered:
760 km2
Area of New Licences:
235.07 km2
Commodity:
Lithium
Mineralisation Type:
Spodumene-bearing lithium pegmatites
Exploration Activity:
Reconnaissance sampling and geological mapping
Sampling Results Range:
0.02%–1.79% Li2O
Qualified Person:
EuroGeol Vaughan Williams M.Sc. P.Geo
Technical Standard:
National Instrument 43-101
Year:
2023
Region / City:
Kundali, Sonipat
Topic:
Product Service / Repair
Document Type:
Job Card
Organization:
IPOWER BATTERIES PVT LTD
Author:
Anurag Singh
Target Audience:
Service Team / Technicians
Service Type:
Repair / Replacement
Date of Receipt:
Not specified
Warranty Status:
In Warranty
Action Taken:
No repair / No action required
Context:
Service job card documenting the condition and status of a lithium charger sent for repair or replacement.
Closing Date:
15 August 2025
Supervisor:
Dr. Jude Onwudili
Associate Supervisor:
Dr. Anisa Mahomed
Institution:
Aston University
College:
Engineering and Physical Sciences
Department:
Chemical Engineering and Biotechnologies
Programme Length:
Three years
Contract Type:
Full time
Prospective Start Date:
1 January 2026
Academic Year:
2025/6
Funding:
Tuition fees covered for the duration of the programme
Industrial Partner:
EMR Metal Recycling
Location:
Aston Campus, Birmingham, UK
Eligibility:
Home and Overseas applicants
Research Area:
Lithium-ion battery recycling and hydrometallurgical metal recovery
Key Words:
lithium, critical metals, battery recycling, bio-based leaching agents, solvent extraction, sustainability
Application Requirements:
Transcripts and certificates, research statement, personal statement, CV, two academic references, proof of English language proficiency, passport copy
Interview Format:
Online via Microsoft Teams
Year:
2023
Region / City:
Wuhan, Hubei, P.R. China; Sanya, P.R. China; Tianjin, P.R. China
Subject:
Solid-state Lithium Metal Batteries; Electrochemical Materials; Lithium-Ion Batteries
Document Type:
Research Article
Organization / Institution:
Wuhan University of Technology, Nankai University
Authors:
Feng Tao, Kaijian Yan, Chenxu Dong, Jiajing Wang, Qianmu Pan, Minjian Gong, Jiapei Gu, Chunli Shen, Ruohan Yu, Yuanzhi Jiang, Mingjian Yuan, Cheng Zhou, Meng Huang, Xu Xu, Liqiang Mai
Target Audience:
Researchers in materials science, battery technology, and electrochemistry
Period of Action:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2014
Region / City:
Washington, D.C., USA
Subject:
Transport of hazardous goods, Lithium batteries
Document type:
Technical report
Organization:
Council on the Safe Transportation of Hazardous Articles (COSTHA)
Author:
COSTHA
Target audience:
Automotive manufacturers, transportation safety experts, regulatory bodies
Period of validity:
Not specified
Approval date:
Not specified
Date of revisions:
Not specified
Context:
A technical document outlining the issues with current testing methods for large format lithium-ion batteries, proposing revisions to the UN Test T4 based on mass and acceleration considerations.
Word Count:
201
Topic:
Fire hazards of lithium batteries
Type of document:
Informational article
Time period referenced:
2013–2018
Geographic scope:
United States
Subject:
Disposal and recycling of lithium batteries
Hazard type:
Fire risk in waste and recycling streams
Statistical data:
25,000 fires between 2013–2018
Related resources:
www.call2recycle.org
Note:
; www.searchearth911.com
Target audience:
Consumers and general public
Year:
2026
Region / City:
Kassala, Sudan
Document Type:
Tender Invitation
Organization:
Practical Action Sudan
Author:
Procurement Officer Abdulsalam Mohamed Musa
Target Audience:
Registered suppliers and vendors
Deadline for Submission:
18/2/2026
Delivery Requirement:
Provision of Lithium Solar Batteries 10 KW and 15 KW
Payment Method:
Bank transfer via Bank of Khartoum
Legal Status:
Vendor as independent contractor
Sub-Contracting:
Requires prior written approval from Practical Action
VAT Requirements:
Include VAT% and provide official tax documents
Submission Method:
Hand-delivered in sealed envelope or via email
Selection Criteria:
Computable price, payment terms, delivery time, and internal terms
Acknowledgment:
Confirmation of receipt and understanding of Practical Action Safeguarding Policy and Terms and Conditions
Official Languages:
English, Arabic
Note:
Year
Organization / Institution:
Wilson Workforce and Rehabilitation Center
Target Audience:
Applicants to the Wilson Workforce and Rehabilitation Center
Year:
2024
Region / City:
England
Subject:
Education, Workforce Census
Document Type:
Guide
Organization / Institution:
SIMS
Author:
Not specified
Target Audience:
Schools in the maintained sector (Community, Foundation, Voluntary Aided, Voluntary Controlled schools, Academies, Free Schools, Pupil Referral Units)
Period of validity:
07/11/2024 (Census day)
Approval Date:
Not specified
Date of changes:
Not specified
Year:
2021
Region / City:
Global
Topic:
Health Workforce, Burnout
Document Type:
Instructional Guide
Organization / Institution:
None specified
Author:
None specified
Target Audience:
Health workers, Healthcare managers
Period of Use:
Ongoing
Approval Date:
Not specified
Date of Last Update:
Not specified
Year:
2023
Region / City:
Greater Lowell Area, Massachusetts
Subject:
Youth Workforce Development Programs
Document Type:
Request for Proposals (RFP)
Issuing Organization:
MassHire Greater Lowell Workforce Board
Target Audience:
Public or private agencies, public school systems, community organizations, and other eligible applicants providing youth services
Period of Validity:
7/1/2022 – 6/30/2023 (with potential renewal)
Approval Date:
March 21, 2021
Amendment Date:
N/A
Year:
2019
Region / City:
United States
Theme:
Social Security, Disability, Employment
Document Type:
Form
Organization / Institution:
Social Security Administration
Author:
National Disability Institute
Target Audience:
Ticket Holders participating in the SSA’s Ticket to Work Program
Period of Validity:
Ongoing
Approval Date:
December 2019
Modification Date:
None
Year:
2017
Region / City:
United States
Subject:
Workforce Development, Monitoring
Document Type:
Guideline
Agency/Organization:
U.S. Department of Education, U.S. Department of Labor, U.S. Department of Health and Human Services
Author:
Multiple Federal Agencies
Target Audience:
State and local workforce development boards, federal partners
Period of Validity:
2017–ongoing
Approval Date:
November 9, 2017
Date of Amendments:
Not specified
Year:
2023
Region / City:
Liberia
Theme:
Health Security, Workforce Development
Document Type:
Request for Expression of Interest (REOI)
Institution:
Ministry of Health, Liberia
Author:
Ministry of Health, Liberia
Target Audience:
Individual Consultants, Health Workforce Professionals
Period of Implementation:
4 months
Approval Date:
Not specified
Amendment Date:
Not specified
Note:
Context