№ lp_2_3_18570
File format: docx
Character count: 2783
File size: 986 KB
This document provides technical specifications for automatic flow control valves, detailing design, installation, and performance requirements.
Year:
2022
Region / City:
Not specified
Topic:
Hydronic Piping, Flow Control Valves
Document Type:
Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Contractors, Engineers
Effective Period:
Not specified
Approval Date:
October 7, 2022
Modification Date:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2018
Subject matter:
Anti-dumping duties on pneumatic valves
Type of document:
Appellate Body report
Institution:
World Trade Organization
Dispute settlement system:
WTO Dispute Settlement Body
Case number:
WT/DS504
Appeal number:
AB-2018-3
Complainant:
Japan
Respondent:
Republic of Korea
Relevant agreements:
Anti-Dumping Agreement; GATT 1994; DSU
Product concerned:
Valves for pneumatic transmissions
Investigating authorities:
Korea Trade Commission; Office of Trade Investigation
Period of investigation:
2014–2015
Date of underlying measures:
2015
Procedural stage:
Appellate review
Official language:
English
Year:
2008
Study Type:
Expert consensus
Study Size (N):
N/A
Inclusion Criteria:
N/A
Exclusion Criteria:
N/A
Endpoints:
N/A
Study Limitations and Adverse Events:
Most databases have fewer patients with diameter in 5.0–5.5 cm size.
Conclusions:
Surgical treatment recommended at 5.5 cm diameter for ascending and 6.5 cm for descending aorta to prevent complications. For Marfan’s syndrome or a BAV, 15% of dissections occur at ascending aorta diameter of 5.0 cm. Dividing the ascending aorta maximal cross-sectional area by pt height and using threshold of 10 recommended for indication of operation. At high experience facilities, it has been suggested for asymptomatic pts (with connective tissue disorders, chronic aortic dissection with increased growth rate) to use <5 cm for ascending and <6 cm for descending aorta and thoracoabdominal aorta as criteria. No evidence that asymptomatic aneurysms <5.5 cm benefit from repair.
Authors:
Svensson LG, et al.
Institution:
N/A
Target Audience:
Medical professionals, clinicians
Period of Validity:
N/A
Approval Date:
N/A
Revision Date:
N/A
Year:
2020
Region / City:
Baton Rouge, LA
Topic:
Fuel gas safety shutoff valves, combustion safety, standards
Document Type:
Technical Specification
Organization / Institution:
AWC, Inc.
Author:
Jeff Peshoff, Brett Cook
Target Audience:
Engineers, professionals in combustion safety
Effective Period:
Ongoing
Approval Date:
May 2020
Revision Dates:
February 2021, July 2023
Year:
2025
Region / City:
Global
Topic:
Medical Equipment / Oxygen Cylinders
Document Type:
Briefing Note
Organization:
Build Health International
Author:
Not specified
Target Audience:
Healthcare providers, hospital procurement teams, NGOs
Period of Validity:
Not specified
Approval Date:
6 January 2025
Revision Date:
Not specified
Year:
2024
Region / city:
United Kingdom
Topic:
Thermostatic Mixing Valves Certification
Document type:
Evaluation Guideline
Organization / institution:
Kiwa Watertec
Author:
Kiwa Watertec Expert Group
Target audience:
Manufacturers, testing laboratories, certifying bodies, stakeholders in the water sector
Effective period:
Until May 2029
Approval date:
21.05.2024
Revision date:
No revision date specified
Certification level:
Level 1+ and Level 3
Standards referenced:
EN 1111, EN 1287, DoH HTM 04-01
Year:
2023
Region / City:
National Harbor, MD
Subject:
Aerospace, Cryogenics, Valve Design
Document Type:
Extended Abstract
Organization:
NASA Marshall Space Flight Center
Authors:
Cody L. Gilliland, Scott Kramer, James A. Richard, William F. Sadowski, Andrew N. Smith, Robert J. Walker
Target Audience:
Aerospace engineers, researchers in cryogenic propulsion systems
Period of Effectiveness:
Not specified
Approval Date:
Not specified
Date of Modifications:
Not specified
Year:
Not specified
Region / City:
Not specified
Topic:
Oil Stop Valves, Environmental Protection, Water Flow Systems
Document Type:
Technical Specification
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Engineers, Environmental Specialists, Contractors
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
This technical specification outlines the minimum requirements for the design, installation, and performance of oil stop valves used in storm drains and similar systems for environmental protection against hydrocarbon contamination.
Document Type:
Product item list
Content Type:
Alphanumeric catalog entries
Subject:
Flow meters for oil and water, valves, silencers, fittings, certificates, and miscellaneous charges
Measurement Units:
GPM (gallons per minute)
Connection Types:
SAE, NPT, BSP
Fluid Types:
Oil, H2O, Air
Includes:
Calibration certificates traceable to NIST, certificate of origin, printed documents, scale charges
Structure:
Item codes with corresponding descriptions
Industry Context:
Fluid measurement and control equipment
Country:
Republic of the Philippines
Procuring Entity:
Santa Maria Water District
Project Reference Number:
PB2024-SMWD-G-01-003
Alternate Reference Number:
PB2024-SMWD-G-01-002
Funding Source:
Corporate Operating Fund for the Year 2024
Approved Budget for the Contract:
PhP 1,115,000.00
Currency:
Philippine Peso (PhP)
Procurement Method:
Open Competitive Bidding
Edition:
Sixth Edition
Publication Date:
July 2020
Project Year:
CY 2024
Delivery Period:
Fifteen (15) days upon receipt of Purchase Order
Eligibility Requirement:
Similar contract within two (2) years equivalent to at least 25% of the ABC
Contract Scope:
Supply and delivery of brass air release valves and D.I gate valves
Governing Law:
2016 revised Implementing Rules and Regulations of Republic Act No. 9184
Year:
2026
Region / City:
N/A
Subject:
Fire Suppression Systems
Document Type:
Technical Specification
Organization:
N/A
Author:
N/A
Target Audience:
Engineers, Contractors, Design Professionals
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2019
Region / City:
North Chicago, Illinois
Topic:
VA Contracting Notice, Reheat Valve Replacement
Document Type:
Notice of Intent
Agency:
Department of Veterans Affairs
Author:
Antaeus Gayle
Target Audience:
Potential Contractors
Period of Action:
09/01/2019 - 09/30/2019
Approval Date:
08/21/2019
Modification Date:
N/A
Year:
2011
Region / City:
United States
Subject:
Plumbing valves and components for water and sewer systems
Document Type:
Technical specification
Organization / Agency:
U.S. Department of Veterans Affairs
Author:
Specification Writer
Target Audience:
Contractors, engineers, and facility managers
Reference Standards:
ASME, ASSE, ASTM, ICC, MSS, NEBB, NSF, USC FCCCHR
Compliance:
Safe Drinking Water Act, Reduction of Lead in Drinking Water Act
Installation Instructions:
Valve delivery, storage, handling, and preparation for installation
As-Built Documentation:
Required as per Section 22 05 11
Technical Requirements:
Material, size, type, and operational characteristics of valves
Year:
2021
Region / City:
Medupi Power Station, South Africa
Subject:
Supply contract for valves spares
Document Type:
Contract Agreement
Organ / Institution:
Eskom Holdings SOC Ltd
Author:
Eskom Holdings SOC Ltd
Target Audience:
Tenderers, Contractors, Suppliers
Period of Validity:
60 months (5 years)
Date of Approval:
[Insert at award stage]
Date of Changes:
[Insert if applicable]
Year:
2025
Region / city:
Cincinnati, Ohio
Topic:
Clinical Outcomes, Medical Devices, Cardiovascular Medicine
Document type:
Research Article
Organization / institution:
Christ Hospital
Author:
Dr Santiago Garcia
Target audience:
Medical Professionals, Cardiologists
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Note:
Year
Year:
2026
Region / City:
Waikato
Document Type:
Compliance Schedule Form
Organization / Authority:
Waikato District Council
Intended Audience:
Building consent applicants and IQPs
System Type:
Automatic Doors (sliding and revolving)
Standards Referenced:
NZS 4239:1993, AS 4085:1992, AS 5007:2007, AS 4290:2000
Inspections Frequency:
Daily, Monthly, Annually
Maintenance Requirements:
Belt/chain tension adjustment, brake settings, wheel maintenance, battery recharge
Reporting Requirements:
On-Site Logbook and annual Form 12A submission
Note:
Year
Region / City:
Ontario
Subject:
Family Law
Document Type:
Court Order
Authority / Institution:
Ontario Court
Target Audience:
Legal parties involved in family law cases
Registered Entity:
Registered name of entity being audited
NCR Number:
NCRnnnnn
Compliance Enforcement Authority:
Region or NERC performing audit
Compliance Assessment Date(s):
Month DD, YYYY, to Month DD, YYYY
Compliance Monitoring Method:
[On-site Audit | Off-site Audit | Spot Check]
Names of Auditors:
Supplied by CEA
Applicability of Requirements:
BA, DP, GO, GOP, PA/PC, RC, RP, RSG, TO, TOP, TP, TSP
Requirements Covered:
D.B.1, D.B.2, D.B.3, D.B.4, R6, R7, R8, R9, R10, D.B.11, D.B.12
UFLS Entities Definition:
Distribution Providers, UFLS-Only Distribution Providers, Transmission Owners, and Transmission Owners that own Elements identified in the UFLS program
Supporting Evidence:
Compliance narratives, reports, memorandums, emails, and other documentation demonstrating compliance with PRC-006-5 requirements
Subject Matter Experts:
SME Name, Title, Organization, Requirement(s)
Compliance Assessment Approach:
Verification of joint regional review participation, island identification, and UFLS program adoption within Western Interconnection
Time Horizon:
Long-term Planning
VRF Level:
Medium
Year:
2024
Region / City:
Utrecht
Topic:
Literary translation, machine translation, translation quality assessment
Document Type:
Thesis
Organization / Institution:
Universiteit Utrecht
Author:
Lola van Scharrenburg
Target Audience:
Academic community, translation professionals
Period of Validity:
N/A
Date of Approval:
May 2024
Date of Changes:
N/A
Year:
2026
Region / City:
Longview, TX
Subject:
Utility Billing, Automatic Bank Draft
Document Type:
Agreement
Organization / Institution:
City of Longview Utility Billing Services
Author:
City of Longview
Target Audience:
Utility customers in Longview
Effective Period:
Ongoing
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A form that allows residents of Longview, TX to sign up for automatic bank draft payments for utility services, with detailed instructions for completing and submitting the agreement.