№ lp_1_2_12514
File format: docx
Character count: 20131
File size: 239 KB
This document is a fire safety inspection checklist summarizing the requirements for existing residential board and care facilities based on the NFPA 101-2012 Life Safety Code, outlining the evaluation criteria for building construction, means of egress, and fire protection.
Year:
2012
Region / City:
United States
Subject:
Fire safety inspection checklist for residential board and care facilities
Document Type:
Inspection Report
Institution:
NFPA
Author:
NFPA
Target Audience:
Facility managers, fire safety professionals
Effective Period:
Ongoing
Approval Date:
2012
Modification Date:
N/A
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
Not specified
Region / city:
Not specified
Topic:
Zoning laws, land use regulations
Document type:
Legal text
Authority:
Not specified
Author:
Not specified
Target audience:
Legal professionals, urban planners, municipal authorities
Effective period:
Not specified
Date of approval:
Not specified
Date of amendments:
Not specified
Context description:
This legal text outlines specific conditions and exceptions under zoning ordinances related to existing structures, uses, and permits in the context of subdivision planning and amendments.
Year:
2020
Region / City:
Georgia
Subject:
Renewable energy procurement program
Document Type:
Regulatory Order
Agency / Organization:
Georgia Public Service Commission
Author:
Georgia Power
Target Audience:
Commercial and Industrial customers
Effective Period:
From 2020 onward
Approval Date:
January 23, 2020
Amendment Date:
N/A
Year:
2025
Region / City:
New York State
Topic:
Code Compliance
Document Type:
Guidance Document
Agency:
Office of General Services (OGS)
Author:
Not specified
Target Audience:
Architects, engineers, and consultants involved in construction code compliance
Effective Period:
Ongoing, related to 2025 New York State building codes
Approval Date:
Not specified
Amendment Date:
Not specified
Contextual Description:
A guidance document for completing the BDC 402 checklist to ensure compliance with the 2025 New York State building codes in construction projects.
Note:
Author
Date of Publication:
August 2022
Year:
2019
Region / city:
Not specified
Theme:
Taxonomy
Document type:
Proposal
Organization / institution:
ICTV
Author:
Kropinski AM, Adriaenssens EM
Target audience:
ICTV Subcommittee Chair, virus taxonomy specialists
Period of validity:
Not specified
Approval date:
Not specified
Date of revisions:
Not specified
Year:
2023
Region / City:
England
Subject:
Peatland protection, woodland creation, and restoration
Document type:
Guidance document
Organization / Institution:
Forestry Commission, Forest Research, Natural England, Environment Agency
Author:
Forestry Commission, Forest Research, Natural England, Environment Agency
Target Audience:
Landowners, regulators, environmental planners
Period of application:
Ongoing
Approval date:
July 2023
Revision date:
2023
Year:
Not specified
Location:
Not specified
Document Type:
Guidance/Template
Prepared by:
Principal Designer/Designer
Audience:
Controller of Premises, Project Team
Project Reference:
Not specified
Document Status:
Live document, subject to regular review
Scope:
Identification of physical and health hazards on construction sites
Content Includes:
Boundaries, access, adjacent land uses, existing hazardous materials, structures, underground conditions, previous modifications, fire damage, plant/equipment risks, asbestos, contaminated ground, health hazards
Distribution:
Hard/soft copy
Version Control:
Maintained with summary of changes
Year:
2020
Region / City:
Florida
Topic:
Building Code, Construction
Document Type:
Analysis
Organization / Institution:
Florida Building Code
Author:
Not specified
Target Audience:
Building professionals, code officials
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Minnesota
Topic:
Subsurface Sewage Treatment System Compliance
Document type:
Compliance and Enforcement Report
Agency:
Minnesota Pollution Control Agency (MPCA)
Author:
Not specified
Target audience:
Local Governmental Units (LGU), system owners
Effective period:
As of inspection date
Approval date:
Not specified
Amendment date:
Not specified
Year:
2025
Region / City:
United Kingdom
Topic:
Passenger Rail Access
Document Type:
Application
Organization / Institution:
Office of Rail and Road (ORR)
Author:
Not specified
Target Audience:
Train operating companies, Network Rail, government bodies
Period of Action:
From SCD 2026
Approval Date:
Before 8th August 2025
Amendment Date:
Not specified
Year:
2026
Region / City:
England
Topic:
Education and Training for Advanced Clinical Practice
Document Type:
Accreditation Standards
Organization / Institution:
Health Education England
Target Audience:
Education providers, healthcare practitioners, accreditation bodies
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Amendments:
Not specified
Note:
Year
Organization / Institution:
AFL Victoria
Target Audience:
Affiliate Clubs, Club Representatives
Year:
2011
Region / Location:
Chile, NCSA
Document Type:
Commissioning Plan
Institution:
Large Synoptic Survey Telescope Project
Authors:
Chuck Claver, Christopher Stubbs
Target Audience:
LSST Project Staff, Scientific Community
Period Covered:
2-year commissioning phase
Last Release Date:
August 15, 2011
Change Log:
Versions 1.0–1.2 with updates to schedule, resources, and activity sequences
Related Documents:
LSST Science Requirements Document (LPM-17), LSST System Requirements (LSE-29), LSST Observatory System Specifications (LSE-30), LSST Telescope & Site Subsystem Requirement (LSE-60), LSST Camera Subsystem Requirements (LSE-59), LSST Data Management Subsystem Requirements (LSE-61), Telescope & Site Integration Plan (LTS-104), Camera Integration Plan (LCA-40), Data Management Integration Plan (TBD)
Acronyms Included:
BFP, CCS, DAC, ISR, FPA, LSR, M1M3, M2, SRD, RVC, OCS, OSS, ORR, TCS, WCS
Note:
Year
Subject:
Library Management
Document Type:
Job Description
Year:
Not provided
Region / City:
Not specified
Topic:
Research ethics, manuscript submission
Document type:
Template
Author:
Not specified
Target audience:
Authors submitting research articles
Period of validity:
Not provided
Approval date:
Not specified
Date of changes:
Not specified
Author:
Gregory Dubois-Felsmann
Organization:
Large Synoptic Survey Telescope (LSST) Project
Document identifier:
LSE-82
Related documents:
LSE-81; LPM-17; LSE-29; LSE-30; LDM-138; LDM-141
Document type:
Technical explanation report
Subject area:
Astronomy data management and survey science
Revision date:
August 15, 2011
Revision history:
Versions 1, 1.1, 1.2
Survey duration referenced:
10-year survey
Primary topics:
science estimates; camera specifications; survey cadence; data management sizing; storage and network requirements
Intended use context:
LSST data management and system design
Technical source type:
Project internal technical documentation
Year:
Not applicable
Region / City:
Not applicable
Subject:
Research ethics and manuscript submission
Document Type:
Submission Template
Organization / Institution:
Not applicable
Author:
Not applicable
Target Audience:
Researchers, Authors submitting manuscripts
Period of validity:
Not applicable
Approval Date:
Not applicable
Date of Changes:
Not applicable