№ files_lp_3_process_7_016067
State environmental monitoring report presenting radiation surveillance activities and analytical results for 2023 in communities surrounding the Pilgrim and Seabrook nuclear power stations.
Year: 2023
Region / State: Massachusetts
Communities Covered: Within a 10-mile radius of Pilgrim Nuclear Power Station (Plymouth, MA) and Seabrook Nuclear Power Station (Seabrook, NH)
Document Type: Environmental monitoring report
Subject: Environmental radiation monitoring and sampling results
Prepared by: Division of Environmental Toxicology, Hazard Assessment and Prevention, Radiation Control Division
Bureau: Bureau of Climate and Environmental Health
Organization: Massachusetts Department of Public Health
Address: 250 Washington Street, Boston, Massachusetts 02108
Date of Publication: March 2025
Monitoring Scope: Air, surface water, milk, fish, shellfish, sediment, vegetation, food crops, real-time gamma radiation monitoring
Regulatory Context: Emergency Planning Zone (EPZ) monitoring and state regulatory responsibility
Operational Status of Facilities: Pilgrim undergoing decommissioning since May 31, 2019; Seabrook operating
Time Period Covered: Calendar year 2023
Collaborating Entity: C-10 Research & Education Foundation, Inc.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.