№ files_lp_3_process_7_016067
File format: docx
Character count: 47879
File size: 4913 KB
State environmental monitoring report presenting radiation surveillance activities and analytical results for 2023 in communities surrounding the Pilgrim and Seabrook nuclear power stations.
Year:
2023
Region / State:
Massachusetts
Communities Covered:
Within a 10-mile radius of Pilgrim Nuclear Power Station (Plymouth, MA) and Seabrook Nuclear Power Station (Seabrook, NH)
Document Type:
Environmental monitoring report
Subject:
Environmental radiation monitoring and sampling results
Prepared by:
Division of Environmental Toxicology, Hazard Assessment and Prevention, Radiation Control Division
Bureau:
Bureau of Climate and Environmental Health
Organization:
Massachusetts Department of Public Health
Address:
250 Washington Street, Boston, Massachusetts 02108
Date of Publication:
March 2025
Monitoring Scope:
Air, surface water, milk, fish, shellfish, sediment, vegetation, food crops, real-time gamma radiation monitoring
Regulatory Context:
Emergency Planning Zone (EPZ) monitoring and state regulatory responsibility
Operational Status of Facilities:
Pilgrim undergoing decommissioning since May 31, 2019; Seabrook operating
Time Period Covered:
Calendar year 2023
Collaborating Entity:
C-10 Research & Education Foundation, Inc.
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2021
Region / City:
Newcastle upon Tyne
Country:
United Kingdom
Street / Area:
Pilgrim Street; Worswick Street; Swan House Roundabout; Market Street; Carliol Square
Document Type:
Statement of Reasons
Legal Instruments:
Traffic Regulation (Consolidation) Order 2009; On Street Parking Places Order 2009
Issuing Authority:
Newcastle City Council
Subject:
Traffic management and highway modifications
Related Infrastructure:
Great North Cycleway; Tyne Bridge; John Dobson Street
Measures Proposed:
Creation of segregated cycle path; conversion of Worswick Street to two-way traffic; removal of on-street parking; installation of raised crossings; introduction of puffin crossing; amendments to loading and taxi arrangements
Affected Transport Modes:
Cyclists; pedestrians; motorists; taxi services
Purpose:
Regulation of traffic movement and road safety improvements
Year:
2010-2011
Region / Parish:
Our Mother of Sorrows
Subject:
Pastoral ministry, Eucharist, community worship
Document type:
Pastoral plan / guidance booklet
Organization:
Our Mother of Sorrows Parish
Author:
Sr. Pearl Cesar
Target audience:
Parishioners of all ages
Period covered:
2010-2011
Date approved:
2010
Sources:
Ernesto Cortes, Jr.; John Haughey, SJ; John Hogan; Rosendo Urrbazo
Main focus:
Implementing worship and welcoming practices in parish life
Context of use:
Parish Eucharistic celebrations and community engagement
Year:
2022
Location:
Llandissilio, Wales, United Kingdom
Theme:
Diocesan Conference, Church Governance, Pilgrimage
Document Type:
Conference Agenda and Minutes
Organization:
Diocese of St Davids, Church in Wales
Author:
Diocesan Secretary and Conference Organizers
Participants:
Clergy, Lay Members, Diocesan Officers
Period Covered:
1 October 2022 (with references to previous conferences in 2021)
Main Activities:
Worship, Reports, Budget Review, Motions, Presentations
Special Projects:
Year of Pilgrimage, St Davids Diocese in 100 Objects
Key Topics:
Plenary Powers, Ministry Share, Clergy Support, Evangelism, Sustainability
Year:
2022/2023
Region / City:
N/A
Topic:
Governor Meeting Attendance
Document Type:
Meeting Record
Organization / Institution:
Pilgrim School
Author:
N/A
Target Audience:
School Governing Body
Date of Approval:
03.10.22
Date of Changes:
06.07.23
Meeting Type:
Full Governing Body (FGB)
Attendance Record:
B Temple, S Barnes, C Nelson, P Banks, S Morrison, I Howells, M Ward, G Bratby, T McCarthy, J Stevenson
Context:
A record of attendance for the full governing body meetings at Pilgrim School for the 2022/2023 academic year.
Year:
2020
Region / city:
Australia
Theme:
Sewage pumping station design
Document type:
Template
Organization:
Urban Utilities
Author:
Harald Kemmetmuller
Target audience:
Design and engineering teams, project managers
Effective period:
2020-2025
Approval date:
29/06/2020
Revision date:
28/01/2025
Year:
2020
Region / City:
Not specified
Subject:
Medicine Prescription and Administration Record
Document Type:
Medical Record
Institution:
Not specified
Author:
Not specified
Target Audience:
Healthcare professionals, particularly nurses and medical practitioners
Validity Period:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
2020
Region / City:
United States
Topic:
Environmental Monitoring, Air Quality
Document Type:
Standard Operating Procedure
Organization / Institution:
U.S. Environmental Protection Agency
Author:
U.S. Environmental Protection Agency
Target Audience:
Air quality monitoring personnel, laboratory technicians
Period of Application:
Ongoing
Approval Date:
January 2020
Date of Changes:
None
Year:
Not specified
Region / City:
North Karanpura
Theme:
Price breakdown for construction and engineering services
Document Type:
Contract / Tender
Organization:
Not specified
Author:
Not specified
Target Audience:
Contractors and service providers in the construction and engineering field
Validity Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Document type:
Liaison Statement
Working Group:
WG FM
Project Team:
FM56
Addressee:
ECC PT1
Sender:
WG FM Chairman
Date:
09 February 2018
Reference:
WGFM#90
Related documents:
SE(18)049, FM(18)059 Annex 021
Frequency bands:
918–925 MHz; 1900–1920 MHz
Radio technologies:
GSM-R; LTE; 5G
Subject area:
Spectrum coexistence and harmonised technical conditions
Requested studies:
BEM conditions; EIRP considerations; coexistence with MFCN
Deployment scenarios:
Macro coverage; local coverage
Deadline for results:
End of 2018
Year:
2019
Region / City:
Melbourne, Australia
Theme:
Environmental audit, Infrastructure development
Document Type:
Environmental audit report
Organization:
Rail Projects Victoria (RPV)
Author:
Aurecon Jacobs Mott MacDonald Joint Venture (AJM JV)
Target Audience:
General public, environmental auditors, project stakeholders
Period of Validity:
2019
Approval Date:
10 February 2022
Date of Changes:
N/A
Year:
YYYY
Region / city:
Europe
Topic:
Satellite communication, frequency bands, NGSO FSS systems
Document Type:
ECC Decision
Organization:
European Conference of Postal and Telecommunications Administrations (CEPT)
Author:
N/A
Target audience:
Telecommunications administrators, regulatory bodies, satellite operators
Period of validity:
N/A
Approval date:
DD MM YYYY
Date of amendments:
N/A
Year:
2014
Region / City:
North Hampton, MA
Topic:
Installation of fire alarm pull stations
Document Type:
Solicitation/Contract/Order
Organization / Institution:
Department of Veterans Affairs
Author:
Freida McClain
Target Audience:
Contractors
Validity Period:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2023
Region / City:
Hucknall, Nottinghamshire
Topic:
Election of District Councillors
Document Type:
Election Notice
Organization:
Ashfield District Council
Author:
Ashfield District Council
Target Audience:
Voters in Hucknall North
Period of Validity:
4 May 2023
Approval Date:
4 May 2023
Year:
2026
Region / City:
Global
Theme:
Energy efficiency, Compressed air systems
Document Type:
Product Information
Organization / Institution:
Kaeser Kompressoren
Author:
Kaeser Kompressoren
Target Audience:
Companies using compressed air systems
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2023
Region / city:
Queensland, Australia
Topic:
Environmental compliance, sewage treatment, pumping stations
Document type:
Checklist
Organization / institution:
Unitywater
Author:
Not specified
Target audience:
Developers installing Sewage Pumping Stations within Unitywater’s sewerage network
Validity period:
Not specified
Approval date:
Not specified
Amendment date:
Not specified
Note:
Year
Region / city:
USA/Caribbean, Europe/Africa/Middle East, Asia/Pacific
Topic:
GMDSS Equipment Testing, DSC Frequencies
Document Type:
Technical guide
Target Audience:
Maritime professionals, ship operators, GMDSS radio operators
Context:
Technical guide on GMDSS equipment testing procedures and station locations for DSC testing.
Year:
2023
Region / City:
United Kingdom
Topic:
Military Airfields, Royal Air Force
Document Type:
Research Guide
Organization:
RAF Museum
Author:
RAF Museum
Target Audience:
Researchers, Historians
Period of Validity:
Not specified
Date of Approval:
Not specified
Date of Changes:
Not specified
Year:
2024
Region / City:
Heysham
Topic:
Nuclear Regulatory Inspection
Document Type:
Site Report
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Nominated Site Inspector - Heysham 1
Target Audience:
General public, Heysham Local Community Liaison Committee (LCLC)
Period of Action:
01 October – 31 December 2024
Approval Date:
February 2025
Date of Last Update:
Not specified