№ files_lp_4_process_2_41454
File format: docx
Character count: 76618
File size: 410 KB
Technical specification outlining the standards, installation requirements, models, and accessories for Heat & Glo® manufactured gas fireplaces, including indoor and outdoor units, control options, finishing packages, and media sets.
Year:
2014-2016
Region / City:
Lakeville, Minnesota, USA
Subject:
Gas Fireplaces and Accessories
Document Type:
Technical Specification
Organization / Institution:
ARCAT, Inc.; Heat & Glo®; Hearth and Home Technologies
Author:
Not specified
Target Audience:
Architects, Contractors, Installers
Compliance Standards:
ANSI Z21.44, ANSI Z21.88, Z21.50b, CSA 2.22b, CSA 2.33, CAN/ULC S610, UL 127, UL 907, UL 1482
Products Covered:
Indoor and outdoor manufactured gas fireplaces, inserts, log sets, mantels, surrounds, and accessories
Installation Requirements:
Manufacturer’s installation instructions, environmental conditions, delivery, storage, handling
Warranty:
Manufacturer’s standard warranty against defects in materials and workmanship
Pre-Installation Meetings:
Minimum two weeks prior to start of work
Document Scope:
Includes submittals, quality assurance, sequencing, mock-ups, and allowable substitutions
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2014-2016
Region / City:
Not specified
Subject:
Budget, Legal, Law Enforcement
Document Type:
Government report
Organization / Institution:
Prosecution Coordination Commission
Author:
Not specified
Target Audience:
Government officials, legal institutions, policymakers
Period of Validity:
2014-2016
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014-2016
Country:
Bulgaria
Type of document:
Government report / Official submission
Institution:
Commission for Protection against Discrimination (CPD)
Legal framework:
Protection against Discrimination Act, effective 01.01.2004
Related events:
International Day for Human Rights 10 December, International Day for combating racism, xenophobia and anti-semitism 9 November
Meetings and initiatives:
Scientific conference “Harmony in Differences”, essay competition “Tolerance Lessons”, meetings with religious communities and NGOs
Scope:
Prevention and control of discrimination, intolerance, xenophobia, negative stereotyping, and hate speech based on religion or belief
Key individuals:
Ana Dzumalieva (Chairperson, CPD), Baki Hyseinov (Deputy Chairperson, CPD), Maxim Benvenisti (Chairperson, Organization of the Jews in Bulgaria Shalom)
Cases handled:
22 case files concerning discrimination based on religion and/or belief in 2014-2015
Official media participation:
Bulgarian National Radio programme “Known and Unknown”
CPD regional activities:
Information events, tolerance lessons in schools, public awareness campaigns
National and international cooperation:
Coordination with NGOs, professional organizations, religious communities
Governmental support:
Religious Affairs Directorate at the Council of Ministers of the Republic of Bulgaria
Official reference:
UN General Assembly Resolution 70/157, adopted 17 December 2015
Year:
2014-2016
Region / city:
Aotearoa, New Zealand and Polynesia
Theme:
Liturgical development and translation
Document type:
Commission report
Organization / institution:
Common Life Liturgical Commission (CLLC)
Author:
Unspecified, compiled by CLLC members
Target audience:
Anglican Church clergy and synod members
Period of validity:
2014-2016
Approval date:
During General Synod sessions 2014-2016
Key projects:
Translation of collects, new RCL collects, online Prayer Book development, research on New Zealand Prayer Book history, review of baptism and confirmation liturgies
Contributors:
Rev’d Dr Lynda Patterson, Rev’d Jacynthia Murphy, Ven Nick Mountfort, Rev’d Michael Wallace, Rev’d Patricia Carter, Ven Jaqui Paterson, Rev’d Kay Webster, Rev’d Bosco Peters, Very Rev’d Dr Trevor James, Rev’d Geoff Haworth, Bishop George Connor, Bishop Jim White, Dean Trevor James, Rev’d Brian Dawson
Year:
2004-2016
Region / City:
Queensland, Australia
Topic:
Public health, immunoglobulin use
Document Type:
Research paper
Organization / Institution:
Griffith University, The Prince Charles Hospital, National Blood Authority
Author:
Megan K Young, Allan W Cripps, Graeme R Nimmo
Target Audience:
Public health professionals, researchers
Effective Period:
2004-2016
Approval Date:
N/A
Date of Revisions:
N/A
Year:
2014-2016
Region / City:
Georgia, United States
Topic:
Violence Against Women Act (VAWA) Implementation
Document Type:
Meeting notes / Implementation plan
Organization:
Criminal Justice Coordinating Council (CJCC)
Subcommittee:
Multidisciplinary Teams (MDT)
Chair:
Wendy Chitwood
Liaisons:
Jodi Spiegel, CJCC Staff Support: Betty Barnard, Tiffany Williams, Quincie McKibben
Target Audience:
Law enforcement, advocacy groups, service providers
Period Covered:
2014-2016
Meeting Locations:
Atlanta, GA
Key Activities:
Protocol development, SART support, capacity assessment, stakeholder engagement, policy review
Endorsing Bodies:
State agencies, CJCC, local coalitions
Email Contacts:
[email protected]
Summary:
Detailed minutes and action plans from MDT subcommittee meetings outlining the goals, objectives, and coordination strategies for supporting multidisciplinary responses to violence against women.
Note:
Year
Subject:
Manufactured Gas Fireplaces
Document Type:
Specification Sheet
Organization / Institution:
Flare Fireplaces LLC
Author:
Flare Fireplaces LLC
Target Audience:
Builders, Contractors, Designers
Effective Period:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2014–2016
Subject:
Gas fireplaces and fireplace accessories
Document Type:
Construction specification section
Standard Section Number:
10307
Manufacturer:
Heatilator®
Company:
Hearth & Home Technologies, Inc.
Manufacturer Location:
Lakeville, Minnesota, United States
Industry:
Building construction and hearth products
Applicable Standards:
ANSI Z21.44; ANSI Z21.88; ANSI Z21.50b; ANSI Z223.1; CSA 2.22b; CSA 2.33; CAN/ULC S610; UL 127; UL 907; UL 1482
Products Covered:
Manufactured indoor and outdoor gas fireplaces, gas fireplace inserts, gas log sets, fireplace mantels, surrounds, and accessories
Series Mentioned:
Heirloom Series
Models Mentioned:
HEIR36; HEIR42; HEIR50
Publishing Organization:
ARCAT, Inc.
Copyright Holder:
ARCAT, Inc.
Target Audience:
Architects, specifiers, contractors, and construction professionals
Related Construction Sections:
Rough Carpentry; Gypsum Board; Plumbing Piping; Electrical Work Results
Compliance Requirements:
Applicable building codes and listed ANSI, CSA, and UL standards
Warranty:
Manufacturer’s standard warranty against defects in materials and workmanship
Year:
2026
Region / City:
Richardson, TX, USA
Subject:
Gas Fireplaces
Document Type:
Technical Specification
Organization:
Flare Fireplaces LLC
Author:
Flare Fireplaces Technical Department
Target Audience:
Certified fireplace technicians, trained dealer representatives
Product Model:
DC-80-H
Certification Standards:
ANSI Z21.88 / CSA 2.33, CAN/CGA 2.17-M91
Fuel Type:
Natural Gas (NG), Liquid Propane (LP)
Maximum Heat Output NG:
55,000 BTU
Maximum Heat Output LP:
49,000 BTU
Efficiency:
81%
Vent System:
Direct Vent 58DVA, Power Vent 35CVS
Warranty:
10-year limited product and firebox, 5-year ceramic glass
Installation Requirements:
Manufacturer instructions, local electrical and building codes
Accessories:
Decorative media options, optional power vent and lighting kits
Year:
2016
Region / City:
Lakeville, MN
Topic:
Gas, Wood, and Electric Fireplaces
Document Type:
Technical Specifications
Organization / Institution:
Heatilator
Author:
ARCAT, Inc.
Target Audience:
Specifiers, Contractors, Builders
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2016
Region / City:
Lakeville, MN
Subject:
Fireplaces
Document Type:
Product Specification
Organization / Institution:
Heatilator®
Author:
Not specified
Target Audience:
Architects, builders, specifiers
Period of Validity:
Not specified
Approval Date:
2016
Amendment Date:
Not specified
Year:
2014 - 2016
Region / City:
Lakeville, MN, USA
Subject:
Gas Fireplaces and Accessories
Document Type:
Technical Specification
Organization / Institution:
ARCAT, Inc. / Heat & Glo®
Author:
Heat & Glo® Technical Team
Target Audience:
Architects, Contractors, Installers
Product Line:
Heat & Glo® Gas Fireplaces, Inserts, Logs, and Accessories
Standards Compliance:
ANSI Z21.44, ANSI Z21.88, Z21.50b, ANSI Z223.1, CSA 2.22b, CSA 2.33, CAN/ULC S610, UL 127, UL 907, UL 1482
Installation Requirements:
Minimum 2 years installer experience, pre-installation mock-ups for large projects, site condition checks
Environmental Conditions:
Temperature, humidity, ventilation within manufacturer’s recommended limits
Delivery and Handling:
Manufacturer’s unopened packaging, careful handling to prevent damage
Year:
2026
Region / City:
United States, Lakeville, MN
Subject:
Gas Fireplaces and Accessories
Document Type:
Technical Specification
Organization:
Heat & Glo®
Author:
Manufacturer
Target Audience:
Contractors, Installers, Architects
Standards Referenced:
ANSI Z21.44, ANSI Z21.88, CSA 2.22b, CSA 2.33, UL 127, UL 907
Models Covered:
Cosmo 32, Cosmo 42
Installation Requirements:
Indoor and outdoor installation, clearances, environmental conditions, pre-installation mock-up
Note:
Year
Topic:
Gas Fireplaces
Document Type:
Specification
Organization / Institution:
Heatilator®
Target Audience:
Architects, Builders, Specifiers
Standards Referenced:
ANSI Z21.44, ANSI Z21.88, Z21.50b, CSA 2.22b, CSA 2.33, CAN/ULC S610, UL 127, UL 907, UL 1482
Related Sections:
06 10 00, 22 14 13, 26 05 00
Product Manufacturer:
Heatilator®
Installation Requirements:
Professional installation required
Warranty:
Manufacturer’s standard warranty
Year:
2021
Region / City:
Lakeville, MN
Topic:
Electric fireplaces
Document Type:
Specification
Organization:
Hearth & Home Technologies
Author:
Not specified
Target Audience:
Specifiers, contractors
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context Description:
Specification document outlining the details of SimpliFire electric fireplaces, including installation requirements, dimensions, and product specifications.
Year:
2020
Region / City:
N/A
Subject:
Manufactured wood casework specification
Document Type:
Specification
Organization / Institution:
Architectural Woodwork Institute (AWI)
Author:
Architectural Woodwork Institute (AWI)
Target Audience:
Design professionals
Validity Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Related Documents:
Section 061000 - Rough Carpentry, Section 064100 - Architectural Wood Casework, Section 123600 - Countertops
References:
ANSI A208.1-2016, ANSI A208.2-2016, ANSI/AWI 0400-2022, AWI 100-2018, ASTM C1036-21, ISO 4586-2018, etc.
Standards:
AWI Quality Certification Program (QCP) requirements
Context:
This document outlines the specification for manufactured wood casework, including finishes, materials, and related requirements, and provides guidelines for design professionals to ensure compliance with relevant standards.
Note:
Year
Contextual Description:
Specifications for installation and technical details of non-fire-rated access panels by BAUCO Access Panel Solutions, Inc.
Year:
2023
Note:
Region / City
Topic:
Heat Pump Installation and Promotion
Document Type:
Application Template
Organization:
Energy Trust
Target Audience:
Contractors, Service Providers
Year:
2010
Region / City:
Queensland
Topic:
Legislative Review, Residential Parks, Manufactured Homes
Document Type:
Report
Agency / Institution:
Department of Employment, Economic Development and Innovation
Author:
Fair Trading Policy Branch, Office of Regulatory Policy
Target Audience:
Policy Makers, Stakeholders in the Residential Parks Sector
Period of Action:
2007-2010
Approval Date:
May 2010
Amendment Date:
May 2010
Date:
May 21, 2024
Time:
Not specified
Location:
Not specified
Theme:
Manufactured Housing Licensing and Compliance
Document Type:
Meeting Minutes
Organization:
Louisiana Manufactured Housing Commission
Author:
Not specified
Target Audience:
Commission members, licensees, stakeholders
Period of Activity:
May 21, 2024
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2025
Region / City:
Oregon, USA
Subject:
Continuing Education, Landlord-Tenant Law, Legal Briefings
Document Type:
Training Schedule / Announcement
Organization:
MHCO (Manufactured Housing Communities of Oregon)
Partner Organization:
Warren Allen, LLP
Target Audience:
Manufactured home community managers
Training Format:
Zoom and in-person seminars
Annual Conference:
October 27–28, 2025 at Graduate Hotel, Eugene, Oregon
Registration Requirements:
On-time attendance, camera on for Zoom sessions
Cancellation Policy:
$75 fee for cancellations before deadline, no refunds after deadline
Credit:
Real Estate Continuing Education Credit through OREA
Training Deadlines:
New managers must attend within 75 days unless previously qualified
Schedule of Sessions:
Set One (Feb–May 2025), Set Two (Sep–Dec 2025), Additional four-hour training seminars (Feb, May, Jul, Oct 2025)