№ files_lp_4_process_2_61970
File format: docx
Character count: 59540
File size: 111 KB
Technical standards contribution summarizing proposed solution variants and text changes for the 6G QoS framework under Key Issue 5 within the 3GPP SA2 study item FS_6G_ARC.
Year:
2026
City:
Goa
Country:
India
Event:
3GPP TSG-SA2#173 Meeting
Document type:
Technical contribution draft
Agenda item:
20.6.5
Work Item:
FS_6G_ARC
Topic:
6G Quality of Service framework and solution variants
Technical area:
Mobile telecommunications standards, 6G architecture
Organizations:
Lenovo; Huawei
Pen-holders:
Lenovo; Huawei
Working group:
3GPP TSG SA2
Related specification:
TR 23.801-01
Subject:
Proposed categorization of solution variants for Key Issue 5 QoS framework
Content elements:
QoS concepts for 6G, AI traffic handling, flexible QoS flows, UE and network QoS collaboration, QoS monitoring, application traffic differentiation
Referenced contributions:
Multiple SA2 technical documents (e.g., S2-2600271, S2-2600418, S2-2600484 and others)
Approval status:
Proposed for approval
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Location:
Goa, India
Theme:
6G QoS framework and solution variants
Document type:
Technical contribution for standardization
Organization:
3GPP TSG-WG SA2
Authors:
Lenovo, Huawei (Pen-holders)
Target audience:
Standardization participants, telecommunications engineers
Work item:
FS_6G_ARC
Agenda item:
20.6.5
Date of meeting:
9–13 February 2026
Number of solution variants:
17
Key topics:
QoS handling, AI traffic, network slicing, end-to-end monitoring, enhanced collaboration between UE and network
Year:
2026
Location:
Goa, India
Work Item Code:
FS_Energy_Ph2_MED
Source Organization:
Orange
Target Group:
3GPP TSG-SA WG4
Release:
Rel-20
Category:
B (addition of feature)
Document Type:
Change Request (CR)
Clauses Affected:
2, 7.1, 7.6.3.2, 7.12
Date of Issue:
2026-01-29
Reference Documents:
3GPP TR 21.905, 3GPP TS 26.512, ETSI TS 103 998
Affected Systems:
UICC apps, Core Network, Other Core Specifications, Test Specifications
Revision History:
rev 6, Current version 19.0.0
Description:
Technical report detailing proposed modifications to 5G Media Application Server energy management procedures, including steps to address Key Issue 5 and content steering based on environmental impact.
Year:
2026
Region / City:
Goa, India
Topic:
6G data framework
Document Type:
Contribution
Organization / Institution:
3GPP TSG-WG SA2
Author:
Penholders (vivo, Nokia, Samsung)
Target Audience:
3GPP participants, stakeholders in 6G development
Period of Validity:
Not specified
Approval Date:
2026-02-09
Modification Date:
Not specified
Agenda Item:
20.6.21
Work Item:
FS_6G_ARC / R20
Abstract:
This document outlines solutions for 6G data framework in SA2.
Contextual Description:
A contribution document outlining solutions and proposals for the development of a 6G data framework within the SA2 working group.
Year:
2026
Location:
Goa, India
Theme:
6G Data Framework
Document Type:
Contribution / Technical Report
Organization:
3GPP TSG-WG SA2
Author:
Penholders (vivo, Nokia, Samsung)
Agenda Item:
20.6.21
Work Item:
FS_6G_ARC / R20
Approval Status:
For Approval
Key Issues Addressed:
KI#21
Use Cases:
AIML model training, data exposure to third parties and UEs, network digital twin, intent-based data services, sensing data collection, AIML model transfer
Data Types:
UE traffic, PDU session data, OAM data
Period of Meeting:
9–13 February 2026
Year:
2026
Region / City:
Goa, India
Topic:
6G System, Control Signaling, Operator Services
Document Type:
Contribution
Organization / Institution:
Samsung, Nokia, Deutsche Telekom
Author:
Samsung, Nokia, Deutsche Telekom
Target Audience:
Technical experts and stakeholders in 6G System development
Period of Validity:
2026
Approval Date:
9 – 13 February 2026
Date of Changes:
Not specified
Agenda Item:
20.6.2
Work Item:
FS_6G_ARC
Abstract:
The contribution provides solution variants for KI#1.2, focusing on control signaling mechanisms for operator services in 6G.
Keywords:
Control signaling, 6G, Operator services, NAS, RAN-CN interaction
Year:
2026
Location:
Goa, India
Topic:
6G Data Framework
Document Type:
Technical contribution / Approval document
Organization:
3GPP TSG-WG SA2
Authors:
vivo, Nokia, Samsung
Agenda Item:
20.6.21
Work Item:
FS_6G_ARC / R20
Contributors:
MediaTek, ZTE, Qualcomm, CATT, Huawei, LGE, OPPO, Lenovo, ETRI, China Telecom, Honor, InterDigital, Xiaomi, TCL, NTT DOCOMO, Ewha Womans University, Transsion Holdings
Data Collection Types:
UE data, RAN data, CN data, sensing, position, OAM
Architecture Variants:
A, B, C, D, E
Requirements:
20 high-consensus, 5 under discussion
Approval Status:
Pending
Year:
2026
Region / City:
Goa, India
Theme:
6G data framework, AI use cases
Document Type:
Contribution for Approval
Organization:
3GPP TSG-WG SA2
Author:
vivo, Nokia, Samsung
Target Audience:
3GPP members, telecom industry professionals
Action Period:
9 – 13 February, 2026
Approval Date:
TBD
Amendment Date:
TBD
Agenda Item:
20.6.21
Work Item:
FS_6G_ARC / R20
Related Documents:
S2-2600228, S2-2600229, S2-2600526, S2-2600195, S2-2600080, S2-2600088, etc.
Description:
A technical document outlining solutions for 6G data framework in SA2, focusing on data collection, transfer, and processing functionalities, with contributions from various telecom industry leaders.
Year:
2026
Location:
Goa, India
Topic:
6G Control Signaling, Operator Services
Document Type:
Technical Contribution / Meeting Document
Organization:
3GPP TSG-WG SA2
Authors:
Samsung, Nokia, Deutsche Telekom
Target Audience:
3GPP members, network operators, telecom engineers
Agenda Item:
20.6.2
Work Item:
FS_6G_ARC
Submission Reference:
S2-2601147
Meeting:
SA2#173, 9 – 13 February 2026
Key Issues Covered:
KI#1.2, control signaling, NAS-based and user-plane signaling, RAN-CN interactions
Solution Variants:
Distributed NAS, backward-compatible NAS, user-plane signaling, new control framework, RAN-CN interactions
Annex:
X – Submitted input solutions from multiple companies including Vivo, Huawei, Ericsson, Qualcomm, LG, Samsung, Apple
Year:
2026
Location:
Goa, India
Document Type:
Technical Contribution
Organization:
3GPP TSG-WG SA2
Authors:
NTT DOCOMO, Samsung, Ericsson
Agenda Item:
20.6.17
Work Item:
FS_6G_ARC
Purpose:
Approval of penholders input for KI#17
Topics Covered:
Migration paths, Interworking with 5GS and EPS, AMF deployment options, SMF changes, fallback/fall-forward mechanisms
Relevant Documents:
S2-2600314, S2-2600391, S2-2600505, S2-2600566, S2-2600565, S2-2600237, S2-2600238, S2-2600275, S2-2600315, S2-2600534, S2-2600545, S2-2600330, S2-2600539, S2-2600420, S2-2600341, S2-2600392, S2-2600269
Deployment Scenarios:
5G SA, 5G NSA, 6G SA, combined nodes, separate nodes
Migration Paths:
Intermediate deployment, final deployment, five candidate paths (A–E)
Technical Scope:
5G/6G core network interworking, EPS interworking, single and dual registration support, idle mode mobility and handover
Year:
2026
Region / City:
Goa, India
Theme:
6G Data Framework
Document Type:
Contribution
Organization:
3GPP TSG-WG SA2
Author:
Penholders (vivo, Nokia, Samsung)
Target Audience:
3GPP members and stakeholders involved in 6G development
Approval Date:
2026-02-13
Amendment Date:
N/A
Year:
2026
Region / city:
Goa, India
Topic:
6G Data Framework
Document Type:
Contribution
Organization / Institution:
3GPP TSG-WG SA2
Author:
Penholders (vivo, Nokia, Samsung)
Target Audience:
3GPP members, network engineers
Effective Period:
2026-02-09 to 2026-02-13
Approval Date:
Pending
Modification Date:
N/A