№ files_lp_4_process_1_32891
File format: docx
Character count: 7875
File size: 773 KB
Step-by-step reference for configuring Service Health indicators, creating new Health Indicators, mapping SiteScope metrics, and troubleshooting URL monitors in a BSM 9 environment.
Year:
2026
Region / City:
Global
Subject:
IT Service Management
Document Type:
Technical Guide
Organization:
Hewlett Packard Enterprise
Author:
HPE BSM Documentation Team
Target Audience:
NOC operators, system administrators
Applicable Period:
BSM 9 release
Approval Date:
2026-01-10
Last Modified:
2026-03-01
Related Systems:
SiteScope, BSM, HP Operations Manager
Keywords:
Health Indicators, URL Monitor, KPI Assignment, Service Health
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2015
Region / City:
USA
Topic:
Sleep Medicine, Behavioral Sleep Medicine, Cognitive Behavioral Therapy for Insomnia
Document Type:
Conference schedule, Course information
Organization / Institution:
Various universities and organizations in the USA
Author:
Multiple presenters and course chairs
Target Audience:
Healthcare professionals, Sleep Medicine specialists
Period of Activity:
Ongoing annual and biennial events
Date of Approval:
N/A
Date of Changes:
N/A
Context:
List of upcoming and ongoing educational events and resources in the field of Sleep Medicine, Behavioral Sleep Medicine, and CBT-I.
Year:
2025
Region / city:
Centurion, Cape Town
Theme:
Email cleansing solution, maintenance, support, service delivery
Document type:
Request for Proposal (RFP)
Organization / institution:
SITA
Author:
SITA
Target audience:
Suppliers, bidders, technical service providers
Duration:
5 years
Approval date:
Not specified
Modification date:
Not specified
Vendor:
H3C
Technology:
Intelligent Resilient Framework (IRF)
Topology:
Ring
Number of member devices:
4
Device model:
S5820V2-54QS-GE
Operating system:
COMWAREV700R001
Roles:
One master, three standby members
IRF ports:
Ten-GigabitEthernet interfaces
Configuration actions:
Member renumbering, IRF port binding, interface shutdown and activation, configuration save
Verification commands:
display irf, display device, display irf configuration
Author:
John Meyer
Publication date:
May 24, 2017
Document type:
Technical configuration guide
Device:
Dynamix 1444
Sensor type:
Dual output accelerometers (vibration and temperature)
Related part numbers:
1443-ACC-AT-T; 1443-ACC-AT-P; 9200AT (EK-43811I)
Measurement types:
Vibration; Accelerometer temperature
Calibration methods:
Offset-based DC temperature calibration
Source type:
Technical documentation
Year:
2022
Region / City:
Global
Topic:
Okta Configuration, OneStream XF
Document Type:
Guide
Organization:
OneStream Software LLC
Author:
OneStream Software
Target Audience:
IT professionals, administrators
Effective Period:
Ongoing
Approval Date:
November 2022
Modification Date:
November 2022
Year:
2011
Region / City:
Global
Subject:
Product Configuration, Microsoft Dynamics AX 2012
Document Type:
Concept Paper
Author:
Microsoft
Target Audience:
Application Developers, Implementers
Period of Validity:
N/A
Approval Date:
August 2011
Modification Date:
N/A
Contextual Description:
This document outlines the product configuration technology options available in Microsoft Dynamics AX 2012 for configuring product masters and creating product variants.
Year:
{Insert Date}
Note:
Region / City
Theme:
Configuration Management
Document Type:
Instructional Guide
Organization / Institution:
NASA
Target Audience:
Spacecraft developers outside of NASA
Effective Date:
{Insert Date}
Note:
Year
Subject:
Financial Accounting Configuration
Document Type:
Configuration Guide
Institution:
SAP
Author:
Unknown
Target Audience:
SAP Implementers, Financial Accounting Professionals
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
United States
Subject:
RCRAInfo Network Exchange Configuration
Document Type:
Configuration Document
Agency / Institution:
U.S. Environmental Protection Agency (EPA)
Author:
David Charbonneau, Jimmy Yin
Target Audience:
Environmental professionals, EPA staff, and State program implementers
Effective Period:
Version 5.12
Approval Date:
July 25, 2022
Modification Date:
July 25, 2022
Version:
3.3
Revision Date:
December 7, 2015
Prepared by:
SRA International, Inc.
Organization:
U.S. Environmental Protection Agency
System:
EPA Moderated Transaction System (EMTS)
Program:
Renewable Fuel Standard (RFS2)
Related Regulations:
40 CFR 80.1431(b)(2); 40 CFR 80.1460(b)(2); 40 CFR 80.315(b)(2); 40 CFR 80.1295(b)(2)
Document Type:
Flow Configuration Document
Subject Area:
Environmental compliance data exchange
Applicable Schema Version:
EMTS XSD 3.3
Intended Users:
Regulated parties and Exchange Network participants
Year:
2021
Region / city:
UK
Topic:
IT Configuration, Middleware
Document type:
Guide
Organization / institution:
NHS Digital
Author:
NHS Digital
Target audience:
IT Managers, IT Administrators, suppliers of desktop build and support services
Validity period:
Not specified
Approval date:
14th September 2021
Date of changes:
Not specified
Document type:
Instructional lab manual
Subject:
Site-to-site IPsec VPN configuration
Network technology:
IPsec, ISAKMP, IKE, OSPF
Vendors:
Cisco
Environment:
Packet Tracer
Devices:
Cisco routers and switches
Topology:
Three-router routed network
Security parameters:
AES-256, SHA-1, pre-shared keys, Diffie-Hellman group 5
IP addressing:
IPv4
Authentication method:
Pre-shared key
Encryption scope:
Inter-LAN traffic
Intended use:
Network configuration and verification exercise
Target audience:
Networking students and instructors
Source format:
Instructor version
Configuration scope:
Router R1 and Router R3
Verification methods:
Ping, show crypto ipsec sa
Routing protocol:
OSPF
License requirement:
Security Technology Package (securityk9)
Year:
2017
Region / City:
Halifax, Nova Scotia, Canada
Topic:
Morse Code Learning, Amateur Radio
Document Type:
Guide
Organization:
Halifax Amateur Radio Club
Author:
Don Trotter (VE1DTR), Gerry Emson (GEMS)
Target Audience:
Amateur radio operators, students learning Morse code
Period of Use:
Ongoing, relevant for CWCOM v1.6
Approval Date:
March 19, 2017
Date of Changes:
N/A
Year:
2019
Document type:
User manual
Product type:
EPON OLT
Products:
FD1204S, FD1208S, FD1216S, FD8000-L116
Version:
V1.3
Software version:
V1.3.X
Company:
Shenzhen C-Data Technology Co., Ltd.
Compiling department:
C-Data Product Management Center Technical Support Department
Target audience:
FTTX Operation and Maintenance Engineers; Customer Technical Engineers
Management methods:
CLI, EMS, WEB
Access methods:
Console, Telnet, Web
Network technologies:
EPON, VLAN, QinQ, Multicast, FTTH, FTTB, VoIP
Configuration modes:
Discrete mode; Profile mode
Revision dates:
2017-12-07; 2018-03-04; 2019-02-13
Year:
2023
Region / City:
N/A
Topic:
Registration Service, Operational Choreography
Document Type:
Change Request
Organization:
MHHS Programme
Author:
N/A
Target Audience:
Programme Participants
Period of Validity:
N/A
Approval Date:
08/02/2023
Date of Changes:
N/A
Year:
Tbc
Region / City:
North West London
Theme:
Musculoskeletal (MSK) Services
Document Type:
Service Specification
Organization:
NHS North West London Integrated Care System
Author:
Tbc
Target Audience:
Healthcare professionals, commissioners, service providers
Period of Validity:
Tbc
Approval Date:
Tbc
Review Date:
Tbc
Year:
2023
Region / City:
United States
Theme:
Racial and gender discrimination, military climate, sexual harassment, sexual assault
Document Type:
Research Protocol
Organization / Institution:
Department of Defense, Office of People Analytics (OPA)
Author:
Unknown
Target Audience:
Racial/ethnic minority service members in the U.S. military
Period of Action:
2023
Approval Date:
Unknown
Date of Changes:
Unknown
Year:
2023
Region / City:
Wisconsin, Madison
Subject:
Public Utility Case Participation and Compensation
Document Type:
Application Form
Authority / Institution:
Wisconsin Public Service Commission
Governing Law:
Wis. Stat. § 196.31, Wis. Admin. Code ch. PSC 3
Applicant Type:
Individual or Organizational
Required Information:
Applicant details, organizational structure, case interest, qualifications, proposed participation, budget, financial impact
Date Issued:
August 2023
Deadline / Period:
Current fiscal year (July – June)
Filing Method:
Electronic Records Filing System (ERF)