№ lp_1_2_22232
File format: docx
Character count: 20136
File size: 29 KB
The document provides a template for creating detailed specifications for fixed and movable furnishings in facility construction projects, including coordination with various stakeholders.
Year:
2022
Region / city:
Unknown
Theme:
Furnishings design and specifications for facilities
Document type:
Template
Author:
Unknown
Target audience:
Interior Designers, Contractors, and related professionals
Period of validity:
Not specified
Approval date:
Not specified
Date of amendments:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Organization / Institution:
Faculty of Pre-Hospital Care, The Royal College of Surgeons of Edinburgh
Year:
2017
Region / City:
United States
Topic:
Federal Procurement, Government Contracts
Document Type:
Solicitation
Organization / Institution:
General Services Administration (GSA)
Author:
General Services Administration (GSA)
Target Audience:
Businesses submitting offers to GSA
Period of Validity:
Ongoing
Approval Date:
Not specified
Date of Amendments:
Not specified
Year:
Not specified
Manufacturer:
Formwise Washrooms Ltd
Address:
Unit 3 Wendel Point, Park Farm, Wellingborough, Northamptonshire NN8 6BA, UK
Telephone:
01933 405961
Fax:
01933 405971
Email:
[email protected]
Website:
www.formwise-washrooms.co.uk
Product Reference:
HPL Vanity V1
Dimensions:
800mm high x max 3600mm un-jointed lengths
Vanity Top Material:
High pressure laminate on 18mm moisture resistant chipboard
Finish / Colour:
Formwise Washrooms HPL range, velour finish
Front Edge Profile:
Postformed with 200mm downstand
Rear Edge Profile:
No rear upstand
Underpanel Material:
18mm moisture resistant V313 chipboard with high pressure laminate
Edge Treatment:
Lipped with 1mm PVC
Accessories:
Concealed Keku lift off brackets
Support System:
Treated softwood framework, notched and screwed, made to measure and site assembled
Other Requirements:
Not applicable
Year:
Not specified
Region / City:
Not specified
Theme:
Environmental Impact, Social Responsibility, Economic Considerations
Document Type:
Report
Organization / Institution:
Not specified
Author:
Not specified
Target Audience:
Companies, Organizations in the Furniture & Textile Industry
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2025
Region / City:
United States, NJ and CA production points
Subject:
Commercial Office Furnishings, Wall Decor
Document type:
Federal Supply Schedule Price List
Organization / Institution:
General Services Administration (GSA)
Contractor:
Iconic Pineapple LLC
Business size:
Small, Women-Owned
Contract number:
47QSMS25D0085
Contract period:
February 18, 2025 – February 17, 2030
Ordering information:
GSA Advantage!®, GSA.gov
Payment terms:
Net 30 days, 1% Net 10 days prompt payment discount
Credit cards accepted:
Visa, MasterCard, AMEX
Warranty:
Item damage or defects handled case by case
Geographic coverage:
48 contiguous states and the District of Columbia
Point(s) of production:
Paterson, NJ and Santa Clarita, CA
Minimum order:
$100
Maximum order:
$250,000
Delivery time:
30 days after receipt of order (DARO)
Export packing charges:
N/A
Environmental attributes:
None
DUNS number:
00-393-3668
SAM registration:
Yes
Website:
www.iconicpineapple.com
Email:
[email protected]
Phone:
410-910-8309
Year:
2026
Category:
Home Furnishings
Type:
Evaluation Form
Organization:
4-H Club
Audience:
Participants in home furnishings competitions
Criteria:
Appearance, Refinished, Upholstered
Award Options:
Blue, Red, White, No Award
Display Requirements:
Yes/No
Comments Included:
Yes
Official Rules Reference:
Yes
Standard:
Paint/Finish uniformity, Fabric attachment, Trim/Decorations security
Structured Sections:
Name, Category Number, Description, Club/School, Award, Display, Appearance, Refinished, Upholstered, Comments
Evaluation Period:
Annual 4-H competitions
Guidelines Source:
4-H Home Furnishings Handbook
Forms Part Of:
Competition documentation
Year:
2026
Region / City:
Not specified
Theme:
Woodcraft and Home Furnishings
Document Type:
Judging Form
Organization / Institution:
4-H Club / School Exhibits
Author:
Not specified
Target Audience:
Participants and judges of woodworking competitions
Evaluation Criteria:
Appearance, Design, Construction Techniques, Display Compliance
Award Options:
Blue, Red, White, No Award
Period of Use:
Event-specific, annual competitions
Submission Requirements:
Neatness, proper use of adhesives, appropriate materials, durability
Year:
2015
Region / City:
Richmond, VA
Topic:
Fraud Prevention, Social Engineering, Customer Security
Document Type:
Alert
Organization / Institution:
McKesson Medical-Surgical Inc.
Author:
McKesson Medical-Surgical Inc.
Target Audience:
McKesson customers
Effective Period:
Ongoing
Date of Approval:
2015
Date of Changes:
N/A
Year:
2025
Region/City:
Loxahatchee Groves, Florida
Topic:
General Planning Services, Development Engineering Services, Building Inspection and Plans Review Services
Document Type:
RFQ (Request for Qualifications)
Organization:
Town of Loxahatchee Groves
Author:
Town of Loxahatchee Groves
Target Audience:
Consultants, Proposers
Effective Period:
August 28, 2025
Approval Date:
July 23, 2025
Amendment Date:
N/A
Year:
2025
Region / City:
Great Britain
Topic:
Engineering Construction, Labor Market Intelligence, Procurement
Document Type:
Invitation to Tender
Organization / Institution:
Engineering Construction Industry Training Board (ECITB)
Author:
ECITB
Target Audience:
Potential Tenderers
Period of Action:
6 months (with optional extension)
Approval Date:
08.07.25
Date of Changes:
08.07.25
B. Tech (Computer and Communication Engineering) (applicable to students admitted from 2018 onwards)
Year:
2018
Region / City:
N/A
Subject:
Computer Science / Engineering
Document Type:
Academic Course Curriculum
Institution:
N/A
Author:
N/A
Target Audience:
Students of B.Tech program in Computer and Communication Engineering
Period of Application:
2018 and onwards
Date of Approval:
N/A
Date of Last Revision:
N/A
Note:
Year
Region / City:
Coronado, CA
Theme:
Engineering, Construction, Storm Water Management
Document Type:
Official Municipal Requirements
Organization:
City of Coronado, Public Services & Engineering Department
Target Audience:
Applicants, Contractors, Developers
Awarding institution:
University of Huddersfield
Teaching institution:
University of Huddersfield
School and Department:
School of Computing and Engineering, Department of Engineering and Technology
Course accredited by:
Institute of Mechanical Engineers (IMechE)
Mode of Delivery:
Full-time, Sandwich
Final Award:
Bachelor of Engineering with Honours (BEng(Hons)), Integrated Master of Engineering (MEng)
Course Title:
Energy Engineering
UCAS Code:
N/A
Subject benchmark statement:
Engineering (2019)
Date of Programme Specification Approval:
July 2008, March 2009, June 2009, June 2010, October 2010, February 2011, March 2012, January 2013, February 2014, July 2015, October 2017, June 2020, August 2020, January 2021, August 2021, June 2022
Educational Aims:
Provide knowledge and skills for professional work in the Energy Engineering sector
Intended Learning Outcomes:
Knowledge and understanding of engineering principles, practical and transferable skills, professional competencies
Course Structure:
Modules, levels, credits, and awards for MEng/BEng(Hons) Energy Engineering
Year:
2025
Region / City:
Leicester
Topic:
Supercritical fluids, Heat transfer, Instabilities, Turbulence
Document Type:
Research Project
Institution:
University of Leicester
Author:
Dr. Benjamin Bugeat
Target Audience:
PhD Candidates
Period of Validity:
2025
Approval Date:
N/A
Modification Date:
N/A
Year:
Not specified
Region / City:
Oxfordshire
Subject:
Engineering Training
Document Type:
Job Description
Organization / Institution:
MTC Training
Author:
Not specified
Target Audience:
Not specified
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Context:
Job description for an Engineering Trainer position focusing on delivering mechanical and electronic engineering training in apprenticeships and commercial programs.
Revision Date:
January 2020
Region / City:
Global
Theme:
Procurement, Environmental and Social Performance
Document Type:
Standard Bidding Document
Organ / Institution:
World Bank
Author:
World Bank
Target Audience:
Contractors, Bidders, World Bank Borrowers
Period of Validity:
Ongoing
Approval Date:
January 2020
Date of Changes:
January 2020
Document Number:
#######
Revision:
_____________
Project:
GRC Project
Release Date:
_____________
Approved by:
Chief, Department #
Distribution:
[ ] NASA (U.S. Government Only), [ ] Project Only, [ ] Government and Contractor
Availability:
[ ] Public (No Restriction), [ ] Export Controlled, [ ] Confidential/Commercial
Prepared by:
Names and titles
Concurred by:
Names and titles
Note:
Approved By
Names and titles
Change Record:
Rev., Effective Date, Description
Sections:
Introduction, Technical Project Planning and Control, Systems Engineering Process, Integration of Specialty Engineering Effort, Additional Systems Engineering Activities, Notes, Appendixes
Purpose:
Establish overall plan for systems engineering management of the GRC Project
Scope:
Applies to all Government and contractor personnel involved in the GRC Project
Parent Documents:
Project Plan, NASA Systems Engineering Handbook, NPG 7120.5
Applicable Documents:
IT Security Plan, NPG 2810.1
Reference Documents:
UK-SEMP Example, MIL-STD-499A, DI-E-7144, DI-MGMT-81024
Organization:
NASA Glenn Research Center, Cleveland, OH
Roles and Responsibilities:
Project organization, authority, standards, procedures, technical planning and control
Content Type:
Project documentation, management plan, engineering guidelines
Audience:
Government and contractor personnel
Configuration Control:
Document is living and modifiable under configuration control
Document type:
Schedule
Contract reference:
CSS/0117
Schedule number:
2
Title:
Statement of Technical Requirements
Project:
Fleet Solid Support (FSS)
Client organisation:
Royal Fleet Auxiliary
Contract scope:
Engineering and Project Management Support
Task categories:
Firm Tasks; Generic Tasks
Project phases:
Pre-main ship build competition; Main ship build competition
Number of ships:
3
Classification level:
Official-Sensitive
Annexes:
Annex A (Firm Tasks); Annex B (Generic Tasks)
Supporting materials:
Government Furnished Information; Government Furnished Documents
Requirements management system:
DOORS
Data format for requirements input:
Excel
Subject focus:
Technical requirements, project management, safety, logistics, and ship design support
Year:
1993
Region / City:
Washington, D.C.
Topic:
Engineering Systems, Medical Equipment Reporting
Document Type:
Technical Manual
Organization / Institution:
Department of Veterans Affairs
Author:
REDACTED
Target Audience:
System users, site managers, and technical staff
Period of Validity:
Ongoing, since August 1993
Date of Approval:
August 1993
Date of Amendments:
August 2017
Context:
The document provides detailed information about the Engineering Technical Manual for the AEMS/MERS system, including its functions, usage, and updates.
Year:
1994
Region / City:
Mississippi
Theme:
Engineering services, contract management, public agency, transportation projects
Document Type:
Contract
Organization / Institution:
Local Public Agency (LPA), Mississippi Department of Transportation (MDOT)
Author:
Not specified
Target Audience:
Consultants, Local Public Agency (LPA)
Period of Action:
From contract execution until project completion or termination date
Approval Date:
Not specified
Amendment Date:
01/09/26
Scope of Work:
Provided by the LPA in the contract, including engineering services for transportation projects
Contract Term:
From contract execution until project completion or termination
Date of Execution:
Not specified