№ lp_1_2_20348
File format: docx
Character count: 81505
File size: 238 KB
This document outlines the detailed process for Gaining Provider Led (GPL) business switching for service providers.
Year:
2025
Region / City:
UK
Topic:
Business service switching
Document Type:
Process document
Organisation / Institution:
Federation of Communication Services
Author:
Laura Meakin & Niall Gillespie
Target Audience:
Industry professionals, Retail Communications Providers
Effective Period:
Ongoing
Approval Date:
06.11.2025
Date of Changes:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2026
Note:
Region / city
Topic:
Wireless LANs, Backoff Procedure
Document type:
Technical submission
Organization / institution:
IEEE
Author:
Yajun Cheng, Xiandong Dong, Tong Xiao, Wein Lin, Xin Zuo, Xu Chen, Tongxin Shu
Context:
This is a technical document addressing proposed comment resolutions for P802.11bn D1.0, specifically related to the backoff procedure after switching back to the BSS primary channel.
Year:
2023
Region / city:
United Kingdom
Topic:
Medicines Optimisation, SGLT2 inhibitors
Document Type:
Protocol
Author:
NHS England
Target Audience:
Healthcare professionals, clinicians, systems involved in diabetes and heart failure treatment
Period of Validity:
Ongoing
Approval Date:
September 25, 2023
Date of Changes:
Not specified
Clinical Area:
Type 2 diabetes, heart failure, chronic kidney disease
Inclusion Criteria:
Patients aged 18 years and older prescribed empagliflozin, canagliflozin, ertugliflozin, or branded dapagliflozin for T2DM and/or HF
Exclusion Criteria:
Severe renal impairment, diabetic ketoacidosis, and other contraindications as per SPC
Background:
Dapagliflozin is now the first-line SGLT2i in England due to cost reduction following patent expiry.
Implementation Date:
Not specified
Post-switch:
No need for additional eGFR monitoring unless clinical concerns arise
Description:
Protocol outlining the process for switching eligible patients from other SGLT2 inhibitors to dapagliflozin for the management of Type 2 diabetes and heart failure in primary care.
Year:
2025
Region / City:
UK
Theme:
Business switching process
Document Type:
Industry Process Document
Organization / Institution:
FCS (Federation of Communication Services)
Authors:
Laura Meakin & Niall Gillespie
Target Audience:
Retail Communications Providers, Industry Stakeholders
Period of Validity:
Not specified
Approval Date:
Not specified
Last Updated:
06.11.2025
Year:
2025
Region / City:
Prague, Czech
Topic:
Low band carrier aggregation via switching
Document Type:
Discussion/Decision
Organization:
3GPP TSG RAN WG1
Author:
Moderator (Apple)
Target Audience:
Industry professionals and organizations involved in 3GPP technical work
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Note:
Year
Topic:
Chemistry Education
Document Type:
Educational Guide
Organ / Institution:
OCR
Target Audience:
Teachers, Educational Institutions
Note:
Year
Subject:
Biology
Document Type:
Guide
Institution:
OCR
Target Audience:
Teachers, educators
Year:
2024
Region / City:
Athens, Greece
Topic:
Dynamic waveform switching
Document Type:
Meeting Report
Organization / Institution:
3GPP RAN WG1
Author:
Moderator (InterDigital, Inc.)
Target Audience:
Industry professionals in wireless communications
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Country:
United Kingdom
Healthcare system:
National Health Service
Clinical area:
Cardiology / Stroke prevention
Condition:
Non-valvular atrial fibrillation
Medication:
Apixaban
Medication class:
Direct oral anticoagulant
Purpose:
Switching existing DOAC therapy to apixaban
Target population:
Adults aged 18 years and over with NVAF
Exclusions:
Patients with contraindications to apixaban or indications other than NVAF
Regulatory references:
NICE recommendations, Summary of Product Characteristics
Type of document:
Clinical procedure
Intended users:
Prescribers and pharmacists
Consultation requirement:
Patient consent and clinician consultation
Monitoring requirements:
Renal function and body weight
Geographical scope:
UK clinical practice
Status of apixaban:
Licensed and available as a generic medicine
Note:
Year
Year:
2023
Region / City:
e-Meeting, April 17th – April 26th
Topic:
Dynamic waveform switching
Document Type:
Draft
Organization:
3GPP TSG RAN WG1
Author:
Moderator (InterDigital, Inc.)
Target Audience:
3GPP members, stakeholders in wireless communications
Period of validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Year:
2022
Region / city:
Online, February 21 – March 3, 2022
Topic:
MUSIM network switching
Document type:
Technical report
Organization / institution:
Samsung
Author:
Sangyeob Jung (Samsung)
Target audience:
Industry professionals in telecommunications
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Year:
2021
Organization:
3GPP
Technical Group:
TSG RAN WG1
Release:
Rel-17
Meeting:
RAN WG1 #105-e e-Meeting
Meeting period:
May 10–27, 2021
Agenda item:
5.1
Source:
Moderator (China Telecom)
Document type:
Technical meeting contribution
Document purpose:
Discussion
Subject area:
NR uplink transmission, Tx switching, FR1
Related specifications:
TS 38.214
Scope limitations:
Co-located and synchronized network deployment; single TAG for UL carriers
Contributors:
China Telecom, CATT, Qualcomm, vivo, OPPO, ZTE, Huawei, HiSilicon, CMCC
Checkpoints:
May 21, May 25, May 27, 2021
Year:
2023
Region / City:
Global
Theme:
Network Configuration, Routing, VLANs, EtherChannel
Document Type:
Instructor Guide
Organization / Institution:
Cisco
Author:
Cisco Networking Academy
Target Audience:
Instructors and Networking Students
Period of Validity:
Course duration
Approval Date:
2023
Date of Changes:
Not specified
Year:
2021
Region / City:
Global
Topic:
Network Configuration, Routing, VLAN, IPv6
Document Type:
Technical Manual
Organization / Institution:
Cisco
Author:
Cisco Systems
Target Audience:
Networking professionals, Instructors
Period of Validity:
Ongoing
Approval Date:
N/A
Modification Date:
N/A
Year:
2023
Region / city:
United Kingdom
Topic:
Medicines optimisation, SGLT2 inhibitors, diabetes, heart failure
Document type:
Protocol
Organ / institution:
NHS England
Author:
NHS
Target audience:
Clinicians, healthcare providers
Period of validity:
Ongoing
Approval date:
Not specified
Modification date:
Not specified
Year:
2021
Region / City:
Laos
Theme:
COVID-19 response, business recovery, trade facilitation, private sector support
Document Type:
Environmental and Social Action Plan (ESAP)
Organization:
Ministry of Industry and Commerce (MoIC)
Author:
World Bank
Target Audience:
Government, private sector, stakeholders involved in business development and trade
Period of Implementation:
2021-2023
Approval Date:
April 19, 2021
Date of Revisions:
Ongoing (as required)
Year:
2025
Region / City:
Great Britain
Topic:
Engineering Construction, Labor Market Intelligence, Procurement
Document Type:
Invitation to Tender
Organization / Institution:
Engineering Construction Industry Training Board (ECITB)
Author:
ECITB
Target Audience:
Potential Tenderers
Period of Action:
6 months (with optional extension)
Approval Date:
08.07.25
Date of Changes:
08.07.25
Year:
2021
Region / City:
Kuala Lumpur
Subject:
Tax Exemption for Islamic Fund Management
Document Type:
Certification Form
Organization / Institution:
Securities Commission Malaysia
Author:
Securities Commission Malaysia
Target Audience:
Fund management companies in the Islamic fund management industry
Period of Validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2018
Region / City:
San Joaquin Valley, California
Topic:
Healthcare, Agricultural Industry
Document Type:
Report
Organization:
Diringer and Associates, California Rural Legal Assistance Foundation
Author:
Joel Diringer, JD, MPH, Noe Paramo, JD
Target Audience:
Agricultural workers, policymakers, public health professionals
Period of Action:
April 2018
Date of Approval:
April 2018
Date of Changes:
N/A
Contextual Description:
A report examining the impact of Medi-Cal expansion on farmworkers in San Joaquin Valley, addressing both health coverage and economic consequences for agricultural employers.
Note:
Year
Theme:
Retail / Store Operations
Document Type:
Professional Resume
Organization / Institution:
Gulf Marketing Group (Sun & Sand Sports)
Author:
Shailendra Yadav
Target Audience:
Employers / Recruiters
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A