№ lp_1_2_45797
Structured procedure document detailing the setup, execution, and verification of signals and communications from individual Demand Side Units to the National Control Centre, including test criteria, required personnel, and submission timelines.
Year: 2021
Organization: EirGrid
Document Type: Test Procedure
Version: 1.0
Template Version: 3.0
Grid Code Version: 9
Target Audience: DSU Operators, NCC
Purpose: Verification of signals and communication from individual demand sites to NCC
Preconditions: All yellow sections completed before approval; grey sections completed during testing
Submission Requirements: Test procedure scan, test data in CSV/Excel, test report
Instrumentation: Onsite instrumentation and data trending available to NCC
Personnel Requirements: Qualified technical personnel onsite, capable of system setup, liaising with control centers, and incident reporting
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.