№ lp_1_2_45148
File format: docx
Character count: 8631
File size: 51 KB
Formal technical source documenting defined interface relationships, responsibilities, and constraints between Electron-Ion Collider sub-systems to support coordinated design, installation, and operation.
Project:
Electron-Ion Collider
Document type:
Interface Control Document
Scope:
Sub-system interfaces and integration requirements
Institution:
Electron-Ion Collider Institution
Prepared by:
Electron-Ion Collider Institution
Reviewed by:
Electron-Ion Collider Institution
Approved by:
Electron-Ion Collider Institution
Revision:
00
Revision status:
Initial release
Applicable systems:
Detector systems, Hall Infrastructure, accelerator and support sub-systems
Standards and references:
National Electric Code, National Fire Protection Association, National Electrical Manufacturers Association, Underwriter Laboratories
Structure reference:
Work Breakdown Structure (WBS)
Content elements:
Requirements, specifications, interfaces, revision history, acronyms, interface tables
Technical context:
Accelerator and detector infrastructure integration
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Topic:
Electron-Ion Collider Project, Detector Infrastructure, Interface Systems
Document Type:
Interface Control Document
Organization / Institution:
Electron-Ion Collider at Institution
Note:
Year
Revision history:
Initial release.
Note:
Revision History
Revision #:
00
Effective Date:
[Not provided]
Additional Reviewers:
[Not provided]
Summary of Change:
Initial release
Year:
[Not provided]
Region / City:
[Not provided]
Subject:
Electron-Ion Collider Project, Ancillary Detectors, IR Accelerator Systems
Document Type:
Interface Control Document
Organization / Institution:
[Not provided]
Author:
[Not provided]
Target Audience:
[Not provided]
Effective Period:
[Not provided]
Approval Date:
[Not provided]
Revision Date:
[Not provided]
Year:
2021
Region / City:
Unknown
Subject:
Electron-Ion Collider, Sub-systems integration
Document Type:
Interface Control Document
Institution:
Electron-Ion Collider at Institution
Author:
Unknown
Target Audience:
Researchers, Engineers, and Technical Staff involved in the Electron-Ion Collider Project
Period of Validity:
Unknown
Approval Date:
Unknown
Revision Date:
Unknown
Year:
2023
Region / city:
Not specified
Subject:
Detector infrastructure systems
Document type:
Interface control document
Organization / institution:
Electron-Ion Collider project
Author:
Not specified
Target audience:
Engineers and designers involved in the Electron-Ion Collider project
Period of validity:
Not specified
Approval date:
Not specified
Date of changes:
Not specified
Note:
Revision History
Purpose:
Defines interface specifications and requirements between Hadronic Calorimetry Systems and IR Accelerator Systems.
Scope:
Covers integration of subsystems within the Electron-Ion Collider project.
Applicable Documents:
List of documents required for the integration of subsystems.
Date:
{{Dte_es_:signer1:date}}
Revision #:
00
Effective Date:
{{Dte_es_:signer1:date}}
Design Considerations:
Includes general design considerations for integration and environmental safety.
Safety:
Addresses safety considerations for subsystem interactions.
References:
Several applicable technical reports and documents.
Year:
2021
Region / city:
Washington, DC
Theme:
Particle Identification Systems, IR Accelerator Systems
Document type:
Technical Specification
Organization / Institution:
Electron-Ion Collider Project
Author:
Various authors from Electron-Ion Collider
Target audience:
Researchers and engineers in particle physics
Effective Date:
Not specified
Date of approval:
Not specified
Date of changes:
Not specified
Year:
2021
Project:
Electron-Ion Collider
Type:
Interface Control Document
Prepared by:
Electron-Ion Collider Institution Team
Reviewed by:
Electron-Ion Collider Institution Team
Approved by:
Electron-Ion Collider Institution Team
Systems involved:
Tracking Systems, IR Accelerator Systems
Sections:
Purpose and Scope, Introduction, Interface Summary, Detailed Change Log, References
Revision History:
00 – Initial release
Applicable Documents:
EIC-ORG-PLN-010, BNL-221006-2021-FORE, arXiv:2103.05419, EIC-SEG-PLN-016, EIC-SEG-PLN-022, EIC-SEG-PLN-020
References:
doi:10.17226/25171, National Academies of Sciences, Engineering, and Medicine, "An Assessment of U.S.-Based Electron-Ion Collider Science", The National Academies Press, Washington, DC, 2018
Year:
2023
Region / City:
United States
Subject:
Electron-Ion Collider Project
Document Type:
Project Planning Document
Organization / Institution:
Brookhaven National Laboratory
Author:
Brookhaven National Laboratory
Target Audience:
Project Stakeholders, International Partners, Research Institutions
Period of Validity:
2019-2020 (negotiation period)
Approval Date:
12/5/2023
Date of Changes:
Not specified
Year:
2023
Note:
Region / City
Subject:
Project Planning, Electron-Ion Collider
Document Type:
Project Planning Document
Organization:
Brookhaven National Laboratory
Approval Date:
12/4/2023
Description:
This document outlines the project planning for the Electron-Ion Collider (EIC) and includes scope, technical documentation, project activities, schedule, and deliverables for Part 2.
Note:
Year
Topic:
Electron-Ion Collider Project, Detector Infrastructure, Interface Systems
Document Type:
Interface Control Document
Organization / Institution:
Electron-Ion Collider at Institution
Note:
Year
Revision history:
Initial release.