№ lp_1_2_62404
File format: docx
Character count: 1399
File size: 14 KB
Note:
Year
Subject:
Application for Change of Name
Document Type:
Form
Organization / Institution:
Kendriya Vidyalaya Sangathan
Target Audience:
Parent/Guardian of the student
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Note:
Year
Note:
Year
Institution:
Punjab Engineering College, Chandigarh (Deemed to be University)
Type of document:
Application Form
Position:
Faculty (Assistant Professor / Associate Professor / Professor)
Duration:
3-year Contractual Basis
Sections included:
Personal Information, Academic Qualifications, Research Contributions, Employment History, Referees, Enclosures
Note:
Year
Topic:
Research ethics
Document type:
Form
Organization / Institution:
Sheffield Hallam University
Target audience:
Students and supervisors conducting research involving human participants
Contextual description:
Form used for ethical scrutiny of higher risk research projects involving human participants, particularly those involving biological samples, food/nutrition, and high-intensity sport science evaluation.
Year:
2020
Region / City:
UK
Topic:
Urogynaecology
Document Type:
MDT proforma and pre-surgical checklist
Organization / Institution:
BSUG
Author:
Not specified
Target Audience:
Medical professionals in urogynaecology
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified
Year:
Not specified
Region / City:
Hong Kong
Subject:
Continuing Education Fund (CEF), Personal Data Disclosure, Course Reimbursement
Document Type:
Instructional Document
Agency/Institution:
Labour and Welfare Bureau (LWB), Office of CEF (OCEF)
Author:
Not specified
Target Audience:
Course providers and participants in the CEF program
Period of validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2022
Region / City:
Swindon
Topic:
Mortality Review
Document Type:
Proforma
Institution:
Great Western Hospital, Swindon / SFT
Author:
Great Western Hospital / SFT
Target Audience:
Healthcare professionals involved in mortality reviews
Effective Period:
From February 2022
Date of Approval:
March 2022
Date of Changes:
February 2023
Year:
2017
Note:
Region / City
Theme:
Reimbursement of Children Education Allowance and Hostel Subsidy
Document Type:
Form / Application
Description:
Form for applying for reimbursement of Children Education Allowance and Hostel Subsidy for employees, detailing required information about children, spouse employment, school details, and disability status.
Year:
2023
Region / City:
California
Topic:
Renewable Energy & Storage Projects
Document Type:
Term Sheet
Organ / Institution:
Central Coast Community Energy
Author:
Central Coast Community Energy
Target Audience:
Potential project respondents and contractors
Effective Date:
[_____], 2023
Modification Date:
Not specified
Period of Action:
Not specified
Approval Date:
Not specified
Description of Facility:
A [XX] MWAC solar photovoltaic electricity generating facility with a [XX] MW/[XX] MWh co-located battery energy storage facility in _________ County, California.
Energy Specifications:
Portfolio Content Category 1
Renewable Rate:
$[XX]/MWh
Storage Rate:
$[XX]/kW-month
Delivery Term:
[XX] Contract Years
Guaranteed Capacity:
[XX] MWAC
Storage Contract Capacity:
[XX] MWAC
Expected Energy:
[XXX,XXX] MWh
Interconnection Point:
[e.g., XX substation]
Test Energy Rate:
100% of net CAISO revenues for Test Energy
Guaranteed Energy Production:
85% of expected energy
Performance Guarantee:
Based on various performance criteria and energy production standards
Annual Excess Energy:
Price adjustments for energy exceeding expected production thresholds
Year:
2019-20
Region / City:
New Delhi
Topic:
Career Advancement Scheme (CAS) for Teaching Faculties
Document Type:
Guidelines / Regulation
Organization / Institution:
Rashtriya Sanskrit Sansthan
Author:
Internal Quality Assurance Cell (IQAC)
Target Audience:
Teaching Faculties, Administrative Staff
Period of Validity:
2019-20
Approval Date:
18/07/2018
Date of Amendments:
2018
Note:
Description
Note:
Year
Year:
2019
Organisation:
Youth Justice Agency, Department of Justice
Location:
Woodlands, Juvenile Justice Centre, Bangor; YJA HQ, Belfast, Northern Ireland
Type of Opportunity:
Secondment / Professional Training Post
Role:
Training Co-ordinator
Reporting Officer:
Mr Paul McStravick, Deputy Director, Woodlands, JJC
Qualifications Required:
Professional Social Work Qualification (Masters / Degree / DIPSW), Practice Teachers Award
Experience Required:
Minimum 3 years Post-Qualifying social work experience, training needs assessment and delivery
Funding:
Salary £30,149 - £31,760, paid by YJA
Duration:
12 months, with possible extension
Closing Date:
17 May 2019
Contact Emails:
[email protected]
Year:
2020
Review date:
30/06/2022
Version:
V1
Approved by:
Documentation Compliance Group DCG464
Author:
Eve Bassett
Target audience:
Paediatric clinicians and staff
Type of document:
Medical referral proforma
Patient age group:
Children under 1 year and older children as applicable
Clinical focus:
First afebrile seizure assessment and referral
Submission method:
Email to paediatric emergency clinic
Legal status:
Part of a legal patient record
Document Title:
Proforma for Reporting the First Information (FIR) of a Cognizable Offence
Legal Basis:
Section 154 of the Criminal Procedure Code
Subject Matter:
Reporting of cognizable offences
Type of Document:
Official reporting proforma and sample format
Issuing Authority:
Police Department
Addressee:
Police Officer In Charge
Required Information:
Complainant personal details, place and time of occurrence, nature of offence, property details, accused description, witness details
Signature Requirement:
Signature or thumb impression of the complainant/informant
Attachments Required:
Copy of identification proof
Related Institution Mentioned:
Aligarh Muslim University
Purpose:
Registration of First Information Report
Facilitating dynamic life cycle assessment for climate change mitigation – Supplementary information
Year:
2023
Region / City:
Montpellier, France
Topic:
Climate change mitigation, Life cycle assessment
Document type:
Supplementary Information
Organization / Institution:
IFP Energies nouvelles, Univ Montpellier, INRAE, Institut Agro
Author:
Duval-Dachary S., Lorne D., Batôt G., Hélias A.
Target audience:
Researchers, Climate scientists
Period of validity:
Not specified
Approval date:
Not specified
Modification date:
Not specified
Year:
2014
Region / City:
Zimbabwe
Theme:
Climate Change, Water Resources
Document Type:
Issues Paper
Organization:
World Bank
Author:
World Bank
Target Audience:
Government, Policymakers, Water Resources Planners
Period of Action:
Not specified
Approval Date:
April 25, 2014
Date of Amendments:
Not specified
Note:
Year
Region / City:
Wisconsin
Theme:
Flammable Liquid Storage Tanks, Ownership Change
Document Type:
Form
Organization / Institution:
Wisconsin Department of Agriculture, Trade and Consumer Protection, Division of Trade and Consumer Protection, Bureau of Weights and Measures
Author:
Wisconsin Department of Agriculture, Trade and Consumer Protection
Target Audience:
Tank Owners, Facility Operators
Period of Validity:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Date:
16 July 2025
Issue Resolution Proposal:
CRP666
Issues Log ID:
TS1637
Issue Title:
Changes to GBCS & CHTS to Support VW Relay and & CADg
Source:
SMIP
Date Raised:
22 February 2024
Status:
Draft v0_2
Documentation Reference:
GBCS v4.3, CHTS v1.6
Description:
Addressing the changes required to support Internet based WAN communications using Virtual WAN Relay functionality on the HAN in the GBCS and CHTS specs.
Proposed Implementation and Preamble:
On 12 December 2023 SMIP issued a consultation on proposals to establish arrangements whereby communications with Smart Metering Systems installed in premises with no Wide Area Network could be established via the DCC using the internet and the consumer’s broadband. On 24 October 2024 we published a consultation response reflecting the substantial support for the proposals. Upon completion of that consultation, we instructed DCC to produce an SEC Variation Test Approach Document on 24 November, which enabled DCC to formally engage in the necessary development. The solution proposed relies on the use of the consumer’s broadband and consequently requires the consent of the consumer for it to be implemented. In addition, it requires additional device functionality to be installed at the premises, this is to be provided either from a separate device or incorporated into another device such as a PPMID or CAD. That Device will be referred to as the Virtual WAN Device (VWD). DCC have accommodating the changes to WAN provision that are required to implement the proposals. This includes the provision of a Virtual Wan Provider (VWP), some modest changes to DSP but without any DUIS or schema affecting changes and the creation of a CH variant known as the Virtual WAN CH (VWCH), accommodating the Virtual WAN message relay functionality. As per the December 23 consultation, the current use case for Virtual WAN message relay is No WAN areas. The VWCH will be processing Commands that have originated from the internet, via the VWP and a VWD. Virtual WAN message relay is enabled once the VWD is present in the VWCH Device Log, the enablement at installation will be via an automatic Device Command from the VWD. Currently there are no plans for service users to enable the VWD to join with the VWCH, via a service request, hence no DUIS Schema changes are proposed, such that suppliers’ current operational systems and processes are intended to remain unaffected. A design principle for the initiative is to minimise change to deliver a VW message relay as soon as possible. As such functionality that requires significant DCC change such as new Service Requests has been deliberately avoided. For a new installation in a No WAN situation, the VWD will ‘pair’ and ‘join’ with the VWCH automatically as part of the I&C activity. Whilst there is currently no service request as such, DCC will be able to determine whether a VWD is operating in ‘VW Mode’ (i.e., connecting via the VWP rather than though the CSP WAN), or not. Whilst the method for doing this remains outside of the GBCS / CHTS, the intention is to make this information available to service users, which might be appropriate to suppliers following a CoS event. The method involved will be discussed in the Virtual WAN Interface Specification. This CRP sets out the proposed changes to both CHTS and GBCS.
Year:
1995
Region / City:
United States
Topic:
Medicare Appeal Rights
Document Type:
Notice
Organization / Institution:
Centers for Medicare & Medicaid Services (CMS)
Author:
CMS
Target Audience:
Medicare beneficiaries
Period of validity:
Not specified
Approval Date:
Not specified
Modification Date:
Not specified