№ lp_2_3_18428
Regional aviation status table presenting State-by-State information on ADS-B infrastructure deployment, operational readiness, mandates, airspace application and surveillance separation criteria across the APAC Region.
Region: Asia and Pacific (APAC)
Subject: ADS-B ground infrastructure and ATC system readiness
Document type: Regional status table
Scope: State and Administration level reporting
States covered: Afghanistan; Australia; Bangladesh; Bhutan; Brunei Darussalam; Cambodia; China; Hong Kong China
Content elements: Ground stations and WAM deployment; ATC system integration; data sharing arrangements; equipage mandates; phased implementation; surveillance separation minima
Airspace elements: FIRs, APP, ACC, TMA, upper airspace, specified routes and control areas
Time frame: 2004–2026
Implementation phases: Phase I from 10 October 2019; Phase II from 31 December 2020
Regulatory references: AIC Nr.09/19 “Implementation of ADS-B Control Services”
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.