№ files_lp_3_process_7_045740
Technical pavement schedule detailing layer configurations, material specifications, stabilisation parameters, structural measurements, and construction constraints for designated chainage sections of Gawler By-Pass and Kings Road under Project R23.
Project: R23 Insitu Stabilisation
Projects Covered: Gawler By-Pass; Kings Road
Stages: Stage 1; Stage 2
Sections: Multiple chainage sections as listed
Directions: Northbound; Southbound; Eastbound; Westbound
Lanes: Outer; Inner; Both
Chainage: MM 31.6 – 35.9; Ch290 – 1370 (various ranges)
Work Type: Insitu stabilisation and pavement rehabilitation
Pavement Layers: Surface; Base; Sub-base 1; Sub-base 2; Sub-grade
Surface Materials: AC14; AC20; AC10M(A35P); OG14M(A35P); AC10H(C170); AC14M(C320); AC20M(C320); OG 14; Primerseal; SAMI
Granular Materials: PM32; PM35; PM22; PM21C4; 20mm quartzite; Macadam
Stabilisation: Lime; Bitumen Foam; Cement (4%)
Layer Thicknesses: 30–55mm (asphalt); 130–395mm (base and sub-base)
Cold Planing Depth: 35–45mm (where specified)
Primer Application Rate: 1.0l/m2; 1.8l/m2
Aggregate Size: 7mm; 10mm
Spread Rate: 170m2/m3; 125m2/m3
Sub-grade Strength: CBR 5; CBR 7/3; CBR 8
Deflection: 0.39mm; 0.84mm
Curvature: 0.09mm
Finish Level Constraints: Flush with inner lane; Flush with shoulder; Flush with water table; 35mm above shoulder; Flush with existing surface
Optional Works: Marked as Optional where indicated
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.