№ files_lp_4_process_3_101506
File format: docx
Character count: 796
File size: 54 KB
Referral form used by Georgia Pines CSB for the Georgia APEX Program, documenting necessary information for student referrals to mental health services and educational support.
Note:
Year
Document Type:
Referral Form
Organization / Institution:
Georgia Pines CSB
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2015
Location:
Lower Mississippi River near Columbus, Kentucky
River mile marker:
937
Incident date:
2 September 2015
Type of incident:
Barge collision and oil spill
Substance released:
Clarified slurry oil
Volume released:
Approximately 2,870 barrels
Oil properties:
Specific gravity 1.14; viscosity 160,000 centistokes
Assessment methods:
Side-scan sonar, multibeam echosounder, diver survey, snare/pom-pom drags
Affected areas:
Northern area (7,850 m2); Southern area (789 m2)
Response actions:
Environmental clamshell dredging; post-removal sonar surveys
Total material removed:
1,730 m3 of solids
Response completion date:
25 September 2015
Author:
Jacqueline Michel
Affiliation:
Research Planning, Inc.
Supporting organizations:
National Oceanic and Atmospheric Administration; U.S. Coast Guard
Source type:
Scientific and technical incident report
Year:
2026
Region / City:
Cornell University
Theme:
Public Health Education
Document Type:
Work Plan Template
Organization / Institution:
Cornell University
Author:
Audrey Baker
Target Audience:
MPH Students
Period of Validity:
N/A
Approval Date:
N/A
Date of Changes:
N/A
Year:
2015
Region / City:
Western Australia
Theme:
Human Resources, Sports, Community Programs
Document Type:
Job Description Template
Organization:
APEX Human Resources for the Department of Sport and Recreation
Author:
APEX Human Resources
Target Audience:
Internal Stakeholders, Job Applicants
Period of Action:
2015
Approval Date:
Not specified
Modification Date:
Not specified
Author:
Karen Cannell
Organization:
TH Technology
Product:
Oracle Application Express (APEX) 5.0
Topic:
Interactive Reports enhancements and upgrade considerations
Document Type:
Technical conference paper
Part:
Part 1 of a two-part series
Related Part:
Part 2 – Structural and code changes
Abstract:
Overview of new features and architectural changes in APEX 5 Interactive Reports
Target Audience:
APEX developers
Key Themes:
Action Menu enhancements, CSS changes, JavaScript engine re-architecture, upgrade impact
Introduced Version:
APEX 5.0
Referenced Versions:
APEX 3.2 and earlier releases
Includes:
Upgrade Cheat Sheet Appendix
Focus Areas:
Page Designer, multiple IRs per page, modal dialogs, Universal Theme, usability and accessibility
Technical Scope:
IR customization, dynamic actions, plugins, JavaScript, CSS refactoring
Period:
APEX 5.0 release era
Year:
2023
Region / City:
United States
Theme:
Banking, Savings Accounts
Document Type:
Financial Disclosure
Organization:
Apex Bank
Author:
Apex Bank
Target Audience:
Account holders, potential account holders
Effective Period:
Ongoing
Approval Date:
06/27/2023
Date of Changes:
Not specified
Year:
2025
Region / City:
Apex, North Carolina
Topic:
Environmental Zoning Conditions
Document Type:
Advisory Board Guidelines
Organization:
Town of Apex Environmental Advisory Board
Author:
Town of Apex Environmental Advisory Board
Target Audience:
Rezoning applicants, Planning staff, Developers
Period of Action:
Ongoing
Approval Date:
May 12, 2025
Date of Changes:
N/A
Document type:
Technical specification
Product type:
Condensing hot water boiler for indoor space-heating
Manufacturer:
Thermal Solutions
Product line:
Apex Condensing Boiler
Models:
APX 425C, APX 525C, APX 625C, APX 725C, APX 825C
Applicable standards:
ANSI Z21.13; CSA 4.9; ASME Section IV Boiler and Pressure Vessel Code; ASME CSD-1; ASHRAE Standard 90.1; NFPA 54 National Fuel Gas Code; Hydronics Institute BTS-2000
Certification:
Intertek ETL certification
Maximum allowable working pressure:
160 PSI
Factory hydrostatic test pressure:
240 PSIG
Heat exchanger material:
316L stainless steel
Boiler design:
Water tube condensing boiler
Burner type:
Pre-mix metal-mesh forced draft burner with 5:1 turndown
Control system:
Integrated boiler control system for up to eight modulating boilers and circulation pumps
Installation environment:
Indoor mechanical installation
Warranty heat exchanger:
10-year pro-rated warranty
Warranty other parts:
1-year limited warranty
Associated documentation:
Contract drawings, equipment schedule, installation and start-up instructions, operation and maintenance manuals
Year:
2020
Location:
Pune, Maharashtra, India
Subject:
Resignation
Document Type:
Formal letter
Organization:
Apex Pharmaceuticals Ltd.
Sender:
Mr. Shyam Modi
Position:
Senior Accounts Manager
Recipient:
Mr. S.K. Venkatraman, Deputy General Manager – Accounts
Notice Period:
3 months
Relieving Date Requested:
01 April 2020
Purpose:
Resignation due to relocation to America
Content Focus:
Handover of responsibilities and clearance process
Year:
2019
Region / City:
Georgia
Topic:
WIC Vendor Guidelines
Document Type:
Vendor Handbook
Organization / Institution:
Georgia WIC
Author:
Not specified
Target Audience:
WIC authorized vendors
Period of validity:
Not specified
Approval Date:
December 13, 2019
Date of Changes:
Not specified
Note:
Year
Region / City:
Georgia
Document Type:
Monitoring Report
Submitted by:
UST Owner/Operator
Prepared by:
Consultant/Contractor
Professional Certification:
Registered Professional Engineer or Professional Geologist
Site Assessment:
Groundwater monitoring, analytical results, site ranking
Reimbursement Details:
Applicable if checked
Tables Included:
Groundwater elevations, analytical results, HVR events
Figures Included:
Site location map, potentiometric surface maps, groundwater quality maps, contaminant trend graphs
Year:
2024
Region / City:
Atlanta, GA
Topic:
Committee Meeting
Document Type:
Meeting Minutes
Organization / Institution:
Georgia Committee of Blind Vendors
Author:
Michael Armstrong, Chair
Target Audience:
Members of the Committee, Blind Vendors
Approval Date:
January 24, 2024
Year:
[XXXX]
Region / City:
Georgia
Topic:
Human services, public assistance
Document type:
Memorandum of Agreement (MOA)
Organ / institution:
Georgia Department of Human Services
Author:
Georgia Department of Human Services
Target audience:
Contractors and state agencies
Period of validity:
Effective Date to [End Date], with potential renewal options
Approval date:
[Approval Date]
Date of amendments:
[Amendment Date]
Year:
2025
Region / City:
Jesup, Georgia
Subject:
Public Works Equipment Procurement
Document Type:
Bid Notice
Organization / Institution:
City of Jesup
Author:
Nick Ellis, City Manager
Target Audience:
Contractors and Suppliers
Period of Action:
From June 30th, 2025, to July 1st, 2025
Approval Date:
N/A
Amendment Date:
N/A
Year:
2015
Region / city:
Georgia
Topic:
Job Vacancy
Document type:
Job Announcement
Organization / institution:
Georgia Bureau of Investigation
Author:
Georgia Bureau of Investigation
Target audience:
Job seekers
Effective period:
Until December 6, 2015
Approval date:
November 6, 2015
Modification date:
N/A
Year:
2004
Region / State:
Georgia, USA
Topic:
Transportation, Road Safety, Work Zone Management
Document Type:
Policy Document
Organization:
Georgia Department of Transportation
Authority:
Federal Highway Administration
Audience:
GDOT staff, local agencies implementing Federal-aid highway projects
Legal Basis:
23 CFR 630 Subpart J
Components:
Policy Statement, Goals and Objectives, Policy Provisions, Project Evaluation Criteria, Transportation Management Plans (TMPs), Roles and Responsibilities
Appendices:
TMP Components Checklist, Work Zone Management Strategies Matrix, Significant Project Flowchart, Roles & Responsibilities Chart, Links to Documents, Final Rule on Temporary Traffic Control Devices
Year:
2022
Region / City:
Georgia
Topic:
Afterschool care services
Document Type:
Proposal
Agency / Institution:
Georgia Division of Family and Children Services (DFCS)
Author:
Not specified
Target Audience:
Non-profit agencies applying for funding
Period of Action:
FFY 2021
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
A proposal for non-profit agencies seeking funding for the DFCS Afterschool Care Program, outlining the required documentation and funding structure.
Year:
2020
Region / City:
Georgia
Subject:
Renewable energy procurement program
Document Type:
Regulatory Order
Agency / Organization:
Georgia Public Service Commission
Author:
Georgia Power
Target Audience:
Commercial and Industrial customers
Effective Period:
From 2020 onward
Approval Date:
January 23, 2020
Amendment Date:
N/A
Year:
2013
Region / City:
Barrow County, Georgia
Topic:
Weapons Carry License Application
Document Type:
Instructional Guide
Organization:
Barrow County Probate Court
Author:
Barrow County Probate Court
Target Audience:
Residents of Barrow County, Georgia
Effective Date:
03-01-2013
Amendment Date:
N/A
Fiscal Year:
2025
Region:
Georgia, United States
Type:
Policy Addendum / Certification Document
Issued by:
Georgia Balance of State Continuum of Care (BoS CoC)
Target Audience:
Project applicants and subrecipients
Deadline for Submission:
December 5, 2025
Approval Dates:
Initial Written Standards May 24, 2017; Updated May 19, 2025
Compliance Requirements:
VAWA 2022, HMIS participation, Code of Conduct, Supportive Services participation
Application System:
e-snaps
Description:
Official source outlining requirements, certifications, and policy compliance for all FY2025 project applicants under the Georgia Balance of State CoC competition, including participant eligibility, supportive services, HMIS participation, and VAWA compliance.
Note:
Year
Region / City:
Georgia, USA
Type of Document:
Construction Contract
Institution / Organization:
Board of Regents of the University System of Georgia
Contractor:
LEGAL GC Firm Name
Design Professional:
LEGAL DP Firm Name
Project Number:
Project Number
Project Name:
Project Name and Description
Effective Date:
Date day of Month, Year
Scope:
Full construction services including materials, labor, and compliance with contract documents
Completion Period:
60 days for pre-commencement phase; Material Completion and Occupancy Date as specified
Payment Terms:
Periodic progress payments, payment for material completion, final payment provisions
Bonds:
Performance bond and payment bond required
Federal Compliance:
Contractor registered with federal work authorization program