№ lp_1_2_19995
File format: docx
Character count: 7781
File size: 98 KB
This is a form intended for the notification of meter replacements by accredited power stations in compliance with the Renewable Energy (Electricity) Act 2000.
Year:
2025
Region / City:
Australia
Topic:
Renewable Energy, Meter Replacement
Document Type:
Form
Organization / Institution:
Clean Energy Regulator
Author:
Clean Energy Regulator
Target Audience:
Accredited power stations, nominated persons
Effective Period:
Not specified
Approval Date:
Not specified
Date of Amendments:
Not specified
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2023
Region / city:
Westminster
Topic:
Energy, Heating Systems
Document Type:
FAQ
Organization:
Westminster City Council
Author:
Westminster City Council
Target Audience:
Residents of Wharncliffe Gardens Estate
Period of Action:
Not specified
Approval Date:
Not specified
Date of Changes:
Not specified
Year:
2018
Region / City:
Pasadena, CA / Cambridge, MA
Theme:
Engineering design, Electric Field Meter
Document Type:
Final Design Document
Organization / Institution:
LIGO Laboratory, Caltech, MIT
Authors:
Rich Abbott, Calum Torrie, Norna Robertson, Eddie Sanchez, Luiz Sanchez, Rai Weiss, Peter Fritschel, Dennis Coyne
Target Audience:
Internal LIGO Scientific Collaboration
Period of Action:
2018
Approval Date:
February 28, 2018
Modification Date:
Not specified
Year:
1998
Region / City:
Ontario
Subject:
Meter Disaggregation
Document Type:
Form
Organization:
IESO (Independent Electricity System Operator)
Author:
IESO
Target Audience:
Metered Market Participants
Start Date:
(Not specified)
End Date:
(Not specified)
Approval Date:
(Not specified)
Revision Date:
(Not specified)
Year:
20__
Region / City:
Florida
Subject:
Utility Service
Document Type:
Agreement
Organization / Institution:
City of Florida
Author:
Not specified
Target Audience:
Property owners or businesses requesting temporary water meter service
Effective Period:
Limited to one year of issuance
Approval Date:
Not specified
Modification Date:
Not specified
Note:
Description
Year:
2020
Region / City:
N/A
Theme:
Instrumentation, Calibration, Environmental Science
Document Type:
User Manual
Organization / Institution:
YSI
Author:
Jim Klosiewski, Sandy Wickman, Al Wirt
Target Audience:
Users of YSI Dissolved Oxygen Meters
Validity Period:
N/A
Approval Date:
February 2020
Modification Date:
N/A
Year:
2008
Note:
Region / City
Topic:
Walking Speed Measurement, Neurological Conditions
Document Type:
Test Protocol
Author:
Steffen, Tyson, Watson, Stephens, Jackson, Jain
Target Audience:
Clinicians, Researchers
Year:
2022
Region / City:
Logan, Utah, USA
Theme:
Quantum meter, sensor calibration, electromagnetic compatibility
Organization / Institution:
Apogee Instruments, Inc.
Author:
Apogee Instruments, Inc.
Target Audience:
Users of MQ-100X and MQ-200X quantum meters
Period of Validity:
N/A
Approval Date:
30-Aug-2022
Date of Amendments:
N/A
Note:
Year
Region / City:
Phoenix, AZ
Topic:
Electrical Load Calculation
Document Type:
Form
Organization / Institution:
SRP
Author:
SRP
Target Audience:
Contractors, Engineers, Electrical Service Providers
Date:
November 16, 2017
Time:
12:30 p.m. to 5:30 p.m. Eastern Time
Location:
National Electrical Manufacturers Association (NEMA), 1300 North 17th St, Rosslyn, VA
Meeting Type:
Face-to-face and Tele/Web Conference
Sponsorship:
U.S. Department of Commerce, National Institute of Standards and Technology
Topic:
Electric Watthour Meters
Document Type:
Draft Meeting Agenda
Author:
U.S. National Work Group
Target Audience:
Participants in electric vehicle fueling and submetering, legal metrology professionals
Period of Validity:
November 16, 2017
Approval Date:
November 16, 2017
Changes Date:
September 2017
Note:
Year
Document Type:
User Manual
Target Audience:
Agriculture professionals, educators
Faculty/School/Service:
Earth and Environment
Team:
Cohen
Type of document:
Risk assessment
Activity:
Measuring pH using a pH probe and meter
Date:
29/04/2014
Location:
Cohen laboratory suite (levels 8 and 9)
Assessor:
Andy Connelly
Manager responsible:
Liane Benning
Persons at risk:
Employees; Students; Clients; Contractors; Members of the public; Work experience students
Hazards identified:
Slips from spills; Glass probe breakage; Exposure to non-toxic solutions; Risks from experimental samples
Risk assessment scope:
General use, calibration and storage of pH meters
Related assessments:
COSHH; Manual handling; Personal protective equipment
Review frequency:
Minimum every two years
Document status:
Internal health and safety record
Year:
2023
Region / City:
N/A
Subject:
Power Metering
Document Type:
Product Specification
Organization / Institution:
Veris
Author:
N/A
Target Audience:
Engineers, System Integrators, and Technicians
Effective Period:
N/A
Approval Date:
N/A
Amendment Date:
N/A
Description:
Technical specification document for a power and energy meter with Modbus RTU communication and various energy measurement features.
Note:
Year
Topic:
Gas installation
Document Type:
Form
Target Audience:
Organisations requesting gas meter installation
Context Description:
Request form for authorisation to install and seal a gas meter regulator and associated safety devices.
Author:
Tony Hebb
Date:
May 2012
Revision Date:
November 2012
Subject:
Construction of a torque meter for indoor model aircraft
Type of Document:
Technical article
Field:
Indoor free flight aeromodelling
Related Classes:
F1L, F1D, F1R, MS, Pennyplane, F1M, Gymminnie Cricket
Measurement Range:
0–53 gm.cm
Materials Mentioned:
Brass or aluminium tube, epoxy, plywood, pine, guitar string or piano wire, miniature bearing
Intended Audience:
Indoor model aircraft builders and flyers
Year:
2025
Location:
Spalding, Lincs, PE11 2XL
Topic:
Heritage Impact Assessment, Listed Building Consent
Document Type:
Report
Institution:
South Holland District Council
Author:
Jonathan Biggadike
Target Audience:
Local Planning Authority, Heritage Consultants
Period of Validity:
Not specified
Approval Date:
18th March 2025
Amendment Date:
Not specified
Year:
2017
Region / City:
Philadelphia, PA
Theme:
Exhaust Fan Replacement
Document Type:
Solicitation/Contract/Order for Commercial Items
Organ / Institution:
Department of Veterans Affairs
Author:
Lev Stowe
Target Audience:
Contractors, Offerors
Period of Effect:
Until contract completion
Approval Date:
08/15/2017
Amendment Date:
08/24/2017
Year:
2025
Region / City:
Chorley, Lancashire
Subject:
Housing, Renovation, Tender
Document Type:
Tender
Organization:
Empower Housing Association
Author:
Empower Housing Association
Target Audience:
Contractors, Construction Firms
Period of Effectiveness:
September 2025
Approval Date:
29th August 2025
Modification Date:
5th September 2025
Year:
2025
Location:
Glen Ellyn, Illinois, USA
Document Type:
Invitation to Bid
Issuing Organization:
Village of Glen Ellyn
Contact Person:
Nick Burgoni, Utilities Superintendent
Submission Deadline:
February 21, 2025, 10:00 AM
Pre-bid Conference:
February 14, 2025, 9:00 AM
Bid Security Requirement:
Cashier’s or Certified Check, or Bid Bond (5% of total contract price)
Applicable Law:
Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq.
Contract Type:
Independent Contractor Agreement
Public Opening:
February 21, 2025, 10:00 AM
Year:
2019
Region / City:
Wisconsin, Milwaukee
Topic:
Procurement, Point of Sale System
Document Type:
Request for Bid (RFB)
Agency / Institution:
University of Wisconsin-Milwaukee
Author:
University of Wisconsin-Milwaukee
Target Audience:
Vendors, Bidders, Suppliers, Contractors
Period of Validity:
1 year with up to 4 annual renewals
Approval Date:
October 24-25, 2019 (for demonstrations)
Date of Revisions:
Not specified