№ lp_1_2_00539
A draft brief outlining technical and operational conditions for the use of specific frequency bands (47.2-50.2 GHz and 50.4-51.4 GHz) by aeronautical and maritime Earth stations in motion (ESIMs), and the regulatory framework for their integration into global satellite communication networks.
Year: 2025
Region / City: Groningen, The Netherlands (Hybrid)
Topic: Frequency band allocation for ESIMs
Document Type: Draft Brief
Organization / Institution: CEPT
Author: CEPT
Target Audience: ITU-R Study Groups, Administrations involved in ESIM operations
Period of validity: 2025-2027
Approval Date: 26th June 2025
Amendment Date: N/A
Note: Context
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.

Don’t have cryptocurrency yet?

You can still complete your purchase in a few minutes:
  1. Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
  2. In the app, tap Send.
  3. Select network, paste our wallet address.
  4. Send the exact amount shown above.
After sending, paste your TXID (transaction ID) and your email to receive the download link. Need help? Contact support and we’ll guide you step by step.