№ lp_1_2_72200
File format: docx
Character count: 9540
File size: 85 KB
Internal construction instruction source defining the structure, review process, and application criteria for specialized installation activities within the UPF project where standard design documents or procedures are insufficient.
Document type:
Construction instruction form
Project:
UPF
Facility:
UPF Main
Quality level:
Q, RS, CC
Disciplines:
Civil; Mechanical; Electrical; Piping; Maintenance; Support
Form identifier:
CFN 1018
Responsible roles:
Field Engineer; Quality Control Engineer; Quality Control Lead; Project Field Engineer
Approval process:
Multi-discipline review and signature
Scope:
Specialized construction and installation activities
Related documents:
Design and reference document numbers with revisions
Inspection and verification types:
Hold Point; Inspection; Monitor; Review; Surveillance; Test; Witness; Witness Point
Applicable activities:
Equipment installation requiring special sequencing or specifications
Source type:
Internal project construction documentation
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2020
Region / City:
N/A
Topic:
IPUPS, Network Security, Telecommunications
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
ZTE Corporation
Target Audience:
Telecommunications professionals, Network engineers
Effective Period:
N/A
Approval Date:
2020-08-07
Modification Date:
N/A
Year:
2020
Organization:
3GPP
Source:
ZTE Corporation
Work item code:
SCAS_5G_IPUPS
Category:
B
Release:
Rel-17
Date:
2020-08-07
Clauses affected:
Annex L
Proposed change affects:
UICC apps, ME, Radio Access Network, Core Network
Type of document:
Change Request (CR)
Related specifications:
TS 23.501, TS 33.513
Consequences if not approved:
Incomplete specification
Note:
Year
Topic:
Safety and Work Procedure
Document Type:
Work Package Briefing
Target Audience:
Personnel involved in construction and safety
Note:
Year
Note:
Year
Year:
2025
Region / City:
N/A
Topic:
QoS monitoring, UPF relocation, PDU session release
Document Type:
Change Request
Organization / Institution:
3GPP
Author:
ETRI
Target Audience:
N/A
Period of Action:
2025-01-20 – 2025-01-24
Approval Date:
2025-01-20
Date of Changes:
N/A
Year:
2023
Region / City:
International
Topic:
Telecommunications / 5G Network Function
Document Type:
Change Request
Organization:
3GPP
Author:
Ericsson
Target Audience:
SA WG2, SA2
Work Item Code:
UPEAS
Category:
C (functional modification of feature)
Release:
Rel-18
Affected Clauses:
4.15.4.5.1, 4.15.4.5.2, 4.15.4.5.3, 5.2.26.2.1, 5.2.26.2.3, 5.2.8.3.1, 5.2.8.3.3
Related Specifications:
TS 23.503 CR 0798
Date:
2023-04-07
Revision History:
CR-Form-v12.2, Current version 18.1.1
Organisation:
3rd Generation Partnership Project (3GPP)
Technical Specification:
3GPP TS 28.552
Working Group:
TSG-SA5
Meeting:
3GPP TSG-SA5 Meeting #131e
CR Number:
0235
Revision:
1
Current Version:
16.5.0
Release:
Rel-16
Category:
B (addition of feature)
Title:
Addition of QoS flow measurements for UPF
Source to WG:
China Mobile, ZTE
Source to TSG:
S5
Work Item Code:
5G_SLICE_ePA
Date:
2020-05-15
Affected Clauses:
5.4.a (new)
Affected Domain:
Core Network
Measurement Names:
UPF.MeanQosFlows; UPF.MaxQosFlows
System:
5GS
Validity:
Packet switching
Year:
2019-2021
Region / City:
Barcelona, Spain
Subject:
Erasmus+ International Mobility Program
Document Type:
Registration Guide
Institution:
Pompeu Fabra University
Author:
Not specified
Target Audience:
Exchange students and staff at Pompeu Fabra University
Period of Validity:
2020
Approval Date:
Not specified
Modification Date:
Not specified
Year:
2026
Location:
Goa, India
Subject:
Telecommunications network protocols
Document type:
Change Request (CR)
Organization:
3GPP TSG-WG SA2
Author:
Ericsson
Target audience:
Network function developers and standards contributors
Work item code:
AIML_CN_Ph2
Release:
Rel-20
Category:
B (addition of feature)
Date submitted:
2026-01-19
Clauses affected:
4.15.4.5, 5.2.26.2
Related specifications:
TS 23.502, TS 23.501, TS 29.244
Revision history:
First Change
Year:
2023
Region / City:
KwaZulu Natal Province
Topic:
Sanitation Infrastructure Construction
Document Type:
Tender Document
Organization / Institution:
The Mvula Trust
Author:
The Mvula Trust
Target Audience:
Contractors, Bidders
Validity Period:
12 weeks
Approval Date:
15 September 2023
Amendment Date:
N/A
Project Number:
1
Cluster:
SAFE Batch 05
Bid Number:
TMT-DBE-23/24-SAFEB05-KZNCL17
Tender Closing Date:
02 October 2023
Contract Duration:
18 weeks
Tender Value:
VAT Inclusive
Type of Project:
VIP Sanitation
CIDB Grading:
5 GB or Higher
Contractor Requirements:
No Joint Venture / Consortium
Purpose:
Provision of sanitation facilities to schools
Note:
Year
Subject:
Fire Safety in Construction
Document Type:
Guidance
Organization / Institution:
Home Builders Federation (HBF)
Author:
Home Builders Federation (HBF)
Target Audience:
HBF members
Topic:
Deck construction
Document type:
Technical requirements and inspection guidelines
Regulatory references:
Municipal code; ASTM D7032; ASTM E84; UL 723; IRC Tables R507.3.1, R507.4, R507.5, R507.6, R507.7, R507.9
Applicable structures:
Residential decks
Permit requirement:
Required with specified exceptions
Material requirements:
Moisture- and decay-resistant lumber and approved composite materials
Structural elements covered:
Footings, posts, beams, joists, ledgers, lateral connections
Special conditions:
Special Flood Hazard Area compliance
Engineering requirement:
Engineered drawings required for hot tub or similar concentrated loads
Inspection notes:
Re-inspection fee may apply if not prepared
Note:
Year
Year:
2025
Region / City:
Great Britain
Topic:
Engineering Construction, Labor Market Intelligence, Procurement
Document Type:
Invitation to Tender
Organization / Institution:
Engineering Construction Industry Training Board (ECITB)
Author:
ECITB
Target Audience:
Potential Tenderers
Period of Action:
6 months (with optional extension)
Approval Date:
08.07.25
Date of Changes:
08.07.25
Organization:
AMJ Construction
Topic:
Covid-19 health and safety measures
Document type:
Company policy
Industry:
Construction
Applicable guidelines:
Construction Leadership Council; Public Health England
Target audience:
Employees, site visitors, clients, supply chain partners
Date referenced:
11 May 2020
Scope:
Construction sites operated by AMJ Construction
Review frequency:
Weekly
Key measures:
Site inductions, risk assessments, cleaning regimes, social distancing, PPE, signage, adjusted working hours
Year:
2023
Region / City:
New South Wales
Topic:
Procurement Guidelines
Document Type:
Guidelines
Organization / Institution:
Department of Regional NSW
Author:
Not specified
Target Audience:
Suppliers, Consultants in Construction
Period of Validity:
Indefinite
Approval Date:
August 2023
Modification Date:
Not specified
Note:
Year
Theme:
Construction and Engineering Documentation
Document Type:
Submission Guidelines
Organization / Institution:
Department of Veterans Affairs (VA)
Target Audience:
Architects, Engineers, VA Medical Center Personnel
Note:
Year
Theme:
Hazard Identification, Construction Safety
Document Type:
Guideline
Target Audience:
Project Managers, Safety Officers