№ lp_1_2_09390
File format: docx
Character count: 126589
File size: 1640 KB
This document is a code of practice detailing the requirements for constructing, operating, and decommissioning petroleum wells in Victoria, aiming to ensure safety and compliance with relevant legislation.
Year:
2023
Region / City:
Victoria
Topic:
Petroleum well construction, operation, and decommissioning
Document type:
Code of practice
Organization / Institution:
Department of Energy, Environment and Climate Action, State of Victoria
Author:
Earth Resources Regulation
Target audience:
Industry professionals, regulators
Period of validity:
Ongoing
Approval date:
August 2023
Date of amendments:
None
Purpose:
To provide guidelines and best practices for the safe construction, operation, and decommissioning of petroleum wells
Scope:
Applies to all petroleum wells in Victoria
Legislative framework:
Petroleum Act 1998, Petroleum Regulations 2021
Associated documents:
Petroleum Act, other state regulations
Price: 8 / 10 USD
The file will be delivered to the email address provided at checkout within 12 hours.
The file will be delivered to the email address provided at checkout within 12 hours.
Don’t have cryptocurrency yet?
You can still complete your purchase in a few minutes:- Buy Crypto in a trusted app (Coinbase, Kraken, Cash App or any similar service).
- In the app, tap Send.
- Select network, paste our wallet address.
- Send the exact amount shown above.
The final amount may vary slightly depending on the payment method.
The file will be sent to the email address provided at checkout within 24 hours.
The product description is provided for reference. Actual content and formatting may differ slightly.
Year:
2025
Organization:
U.S. Nuclear Regulatory Commission (NRC)
Document Type:
Inspection Manual / Procedure
Program Applicability:
IMC 2561 A60801-01
Effective Date:
07/01/2025
Scope:
Decommissioning of permanently shut down reactors
Technical Focus:
Wet storage of spent nuclear fuel, fuel handling, safety, and surveillance
Regulatory References:
10 CFR 50.65, 10 CFR 50.155, NRC Orders EA-12-051
Target Audience:
NRC Inspectors and certified fuel handlers
Year:
2018
Region / City:
N/A
Subject:
Marine Warranty Surveyor (MWS) and offshore operations
Document Type:
Code of Practice
Organization:
Joint Natural Resources Committee (JNRC)
Author:
N/A
Target Audience:
Marine Warranty Surveyors, Underwriters, Assured
Period of Validity:
N/A
Approval Date:
10 April 2018
Amendment Date:
3 September 2019, 24 February 2025
Year:
2024
Region / City:
Liverpool Bay
Topic:
Partial Decommissioning, Carbon Capture and Storage
Document Type:
Report
Organization:
ENI UK
Author:
M Goodwin, A Ward
Target Audience:
Offshore Petroleum Regulator for Environment and Decommissioning (OPRED), ENI UK
Period of Validity:
Not specified
Approval Date:
08 July 2024
Revision Date:
08 July 2024
Year:
2023
Region / City:
North Sea
Topic:
Decommissioning Relief Deed
Document Type:
Guide
Author:
Not specified
Target Audience:
Companies operating in the North Sea
Effective Period:
Not specified
Approval Date:
Not specified
Amendment Date:
Not specified
Context:
This is a guidance document for companies operating in the North Sea that provides instructions on applying for a Decommissioning Relief Deed (DRD) from the UK Government.
Issue number:
7
Publication date:
March 2023
Next major review date:
March 2026
Document reference:
NS-INSP-GD-035
Record reference number:
2020/209712
Issuing body:
Office for Nuclear Regulation
Author role:
Nuclear Liabilities Regulation Specialist Inspector
Approval authority:
Professional Lead – Nuclear Liabilities Regulation
Document type:
Technical inspection guide
Regulatory scope:
Nuclear site licence conditions
Primary subject:
Licence Condition 35 – Decommissioning
Applicable lifecycle stages:
All plant and process lifecycle stages
Related regulatory frameworks:
ONR Safety Assessment Principles, ONR Technical Assessment Guides
Revision history scope:
Issues 5–7 with appended inspection guidance
Regulatory audience:
ONR inspectors
Regulatory jurisdiction:
United Kingdom
Year:
2023
Region / City:
Great Britain
Theme:
Nuclear Decommissioning, Environmental Impact Assessment
Document Type:
Guidance
Organization / Institution:
Office for Nuclear Regulation (ONR)
Author:
Nuclear Liabilities Regulation (NLR) Specialist Inspector
Target Audience:
Nuclear site licensees, statutory consultation bodies, other organizations, and the public interested in the environmental impact of nuclear reactor decommissioning
Period of Validity:
2023–2026
Approval Date:
Mar-2023
Date of Changes:
1st January 2021 (related to the Ionising Radiation (Environmental and Public Protection) (Miscellaneous Amendments) (EU Exit) Regulations 2019)
Next Major Review Date:
Oct-2026
Year:
2013
Region / city:
Outer Continental Shelf (OCS)
Topic:
Decommissioning of platforms, wells, and pipelines
Document Type:
Supporting Statement
Organization / institution:
Bureau of Safety and Environmental Enforcement (BSEE)
Author:
Bureau of Safety and Environmental Enforcement
Target Audience:
Lessees and operators in offshore oil and gas operations
Period of validity:
Indefinite, until regulations are amended or replaced
Approval Date:
Not specified
Date of changes:
Not specified
Rolls-Royce SMR RO Resolution Plan - Decommissioning E3S Case for the generic Rolls-Royce SMR design
Year:
2025
Note:
Region / city
Topic:
Nuclear Liabilities Regulation, Decommissioning Strategy
Document type:
Regulatory Observation
Organization:
Rolls-Royce SMR Ltd
Target audience:
Regulatory bodies, engineering teams, nuclear industry stakeholders
Context:
Detailed analysis of the decommissioning strategy for Rolls-Royce SMR nuclear design, addressing regulatory expectations and safety concerns.
Year:
2025
Region / City:
Liverpool Bay
Subject:
Decommissioning
Document Type:
Project Plan
Organization:
Eni UK
Author:
EPUK Project Team
Target Audience:
Stakeholders involved in offshore decommissioning
Effective Period:
2025
Approval Date:
09/04/2025
Note:
Revision History
Context:
A detailed project plan outlining the partial decommissioning strategy for Liverpool Bay assets, including removal of installations, environmental considerations, and project schedule.
Year:
2023
Note:
Region / City
Topic:
Nuclear Safety, Decommissioning
Document Type:
Safety Guide
Organization / Institution:
IAEA
Target Audience:
Governments, Regulatory Bodies, Operating Organizations, Technical Support Organizations
Year:
2024
Region / City:
Liverpool Bay, UKCS
Theme:
Offshore Decommissioning
Document Type:
Consultation Draft
Organization:
Eni UK
Author:
EPUK Project Team
Target Audience:
Offshore industry professionals, environmental regulators
Period of Validity:
Not specified
Approval Date:
Not specified
Date of Changes:
Various revision dates from 02/12/2022 to 12/07/2024
Issuing Authority:
Pennsylvania Department of Community and Economic Development (DCED)
Funding Program:
Partnerships for Opportunity and Workforce and Economic Revitalization (POWER)
Funding Agency:
U.S. Economic Development Administration (EDA)
Project Location:
50 Electric Way, Courtney, PA 15067, Washington County, Pennsylvania
Subject Properties:
Former Mitchell Power Plant and adjacent Canestrale Property
Document Type:
Work Statement / Request for Proposals
Purpose:
Preparation of a Decommissioning, Demolition and Redevelopment Playbook
Scope of Work:
Environmental, infrastructure, economic, and energy analyses; demolition and abatement planning; permitting review; highest and best use analysis; redevelopment strategy
Standards Referenced:
ASTM E1527-13 Phase I Environmental Site Assessment
Deliverables:
Site-Specific Health and Safety Plan; Phase I ESA; demolition and abatement plan; infrastructure assessment; redevelopment strategy; draft and final reports
Collaborating Parties:
FirstEnergy; local economic development agencies; local partners
Grant Funding Source:
State and federal grant funds
Site Access Conditions:
Walk-through permitted after contractor selection; no prior site visit scheduled
Study Status:
No previous studies conducted by or on behalf of DCED for the parcels
Year:
2011
Publication:
Federal Register
Effective date:
12/17/2012
Date Due for State Adoption:
12/17/2015
Regulatory body:
U.S. Nuclear Regulatory Commission (NRC)
Document type:
Federal regulation / rule amendment
Subject:
Decommissioning of nuclear facilities and financial assurance
CFR Sections:
20.1403, 20.1404, 20.1406, 20.1501, 30.34, 30.35
Target audience:
Licensees of nuclear facilities, state regulators, and stakeholders in nuclear safety
Changes included:
Criteria for license termination, financial assurance, recordkeeping, and survey requirements
Year:
2026
Region / City:
Zambia
Subject:
Telecommunications infrastructure and solar power systems
Document Type:
Official procurement clarification
Organization / Institution:
Zambia Information and Communications Technology Authority (ZICTA)
Author:
Manager Procurement for Director General
Target Audience:
Prospective bidders
Reference Number:
ZICTA/ONB/01/2026
Date Issued:
February 12, 2026
Related Documents:
Solicitation document ZICTA/ONB/01/2026, 20 Relocation sites-Route Plan 2026 Excel Sheet
Scope:
Decommissioning, transporting, reconstruction, and installation of solar PV systems on twenty communication towers
Timeliness in Decommissioning of Materials Facilities (59 FR 36026) RATS ID 19943 Effective 08/15/94
Year:
1994
Region / City:
United States
Topic:
Decommissioning of materials facilities
Document Type:
Amendment
Institution:
NRC
Author:
NRC
Target Audience:
State regulatory authorities
Effective Date:
08/15/94
Amendment Date:
N/A
Changes:
Section revisions in 30.36, 40.42, and 70.38
Expiration Date:
N/A
Year:
2026
Region / City:
South Carolina
Subject:
Volunteerism, Community Service, Nonprofit Organizations
Document Type:
Resolution
Organization / Institution:
South Carolina House of Representatives
Author:
Members of the South Carolina House of Representatives
Target Audience:
General Public, Community Members, Students
Effective Period:
January 20, 2026
Approval Date:
January 20, 2026
Amendment Date:
None
Year:
2025
Region / State:
West Virginia, USA
Document Type:
Legislative Act
Legislature:
West Virginia Legislature
Authors / Delegates:
Zatezalo, Anderson, Fehrenbacher, Street, Eldridge
Date Passed:
April 11, 2025
Effective Date:
July 10, 2025
Topic:
Oil and Gas Wells, Well Plugging Procedures
Legal References:
§22-6-24 of the Code of West Virginia, 1931, as amended
Year:
2024
Region / City:
United States
Subject:
Environmental Restoration, Tribal Land Management, Oil and Gas
Document Type:
Performance Report
Agency:
U.S. Department of the Interior
Author:
U.S. Department of the Interior
Target Audience:
Tribal authorities, environmental agencies
Period of Effectiveness:
MM/DD/YY to MM/DD/YY
Approval Date:
[Not provided]
Date of Changes:
[Not provided]
Note:
Year
Year:
2026
Region / City:
Not specified
Document Type:
Regulatory guidance template
Agency / Institution:
U.S. Environmental Protection Agency (EPA)
Applicable Regulation:
40 CFR 146.94(a), Class VI Rule
Facility Name:
INSERT FACILITY NAME
Well Number:
INSERT WELL NUMBER
Permit Applicant:
INSERT PERMIT APPLICANT NAME
Contact:
INSERT CONTACT NAME / CONTACT TITLE / INSERT ADDRESS / INSERT PHONE / EMAIL
Well Location:
INSERT CITY, COUNTY, STATE / INSERT LAT/LONG COORDINATES
Scope:
Emergency and remedial response for underground injection of CO2
Applicable Period:
Construction, operation, and post-injection site care phases